Closed Repair Requests: March 2004

See Also: All Closed Repair Requests at Woodson High School

March 2004 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 29 Days
  • Routine Requests
    7
    Average Time Elapsed: 108.1 Days
  • Total Requests
    10

Detailed Reports

Urgent Repair Requests Completed in March 2004 (3)
Description Open Date Close Date Time Elapsed
FM-200443155 04 3/4/04 Woodson, HD Urgent !! 4th,3rd,2nd,1st and Plaza - Repair Restrooms 1) 4th - Boys 2 urinals not working. 2) 4th - -Girls commodes not working and replace sinks. 3) 3rd Floor Stairwell 2 Mens urinals not working. 4) 2nd - Boys commode not working. 5) 1st - Stairwell #2 Mens cold and hot water in sink is not working. 6) Plaza - By bank hall Mens # 2 urinals not working. 7) Plaza - Ladies Restroom - Commode not working . 8) Plaza - Principal Office - Replace sink and faucet. January 23, 2004 March 4, 2004 41 days
FM-200443153 04 3/9/04 Woodson, HD Urgent !! 7th, 6th and 5th Floors : Repair Restrooms 1) 7th - Girls cold water running on sink 2) Stairwell #2 Mens urinal and commode needs repair. 3) 6th - Boys urinal needs repair 4) Room 610 - Kitchen sink is leaking, pipe cut in half. 5) 5th - Boys 2 urinals need repair 6) Stairwell #2 urinal needs repair. January 23, 2004 March 9, 2004 46 days
FM-200445534 04 3/18/04 Woodson Room #501 Asbestos assessment required Repair leaking supply line going to radiator in room #501. Leak can not be isolated. Leaking down into room #401. Urgent !!!! Asbestos Code A - Clear for repairs on 03/18/04. Horne Engineering - Philp Connolly(RG 03/18/04) March 18, 2004 March 18, 2004 0 days

Routine Repair Requests Completed in March 2004 (7)
Description Open Date Close Date Time Elapsed
FM-200444613 04 3/1/04 Woodson Heating and Cooling Plant Make the necessary repairs to perimeter control valve, zone 5 pneumatic valve is leaking, zone control heat and cooling of Auditorium and Gym. March 1, 2004 March 1, 2004 0 days
FM-200444105 04 3/12/04 Woodson SHS 4th Floor 1) Drinking fountain is off the wall, needs to be put back. . February 17, 2004 March 12, 2004 24 days
FM-200445248 04 3/15/04 Woodson H.D. Room 207 Asbestos assessment required Repair or replace ruptured heating line on the univent in room 207. March 12, 2004 March 15, 2004 3 days
FM-200341540 /03 3/17/04 Woodson Boiler Room Please make the necessary repair to circulation pump #9 expansion joint is leaking. December 13, 2003 March 17, 2004 95 days
FM-200213934 02 3/24/04 Woodson,H.D. Ground-Floor Parent Center 2. Fabricate a cover for univent inside this room that will be used for a press conference with the superintendent. August 9, 2002 March 24, 2004 593 days
FM-200444729 04 3/24/04 Woodson Room #602 Replace motor switch to heating unit, motor was straight wired. Also has pneumatic problem. The room is over heating. March 3, 2004 March 24, 2004 21 days
FM-200444813 04 3/25/04 Woodson Boiler Room Repairs perimeter control valve zone 5, Pneumatic valve is leaking. Zone control heat and cooling of Auditorium and Gym. March 4, 2004 March 25, 2004 21 days