March 2005 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    4
    Average Time Elapsed: 3.5 Days
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Completed in March 2005 (4)
Description Open Date Close Date Time Elapsed
FM-200502703 05 3/15/05 Woodson SHS First Floor - Library 1) Three windows need to be replaced. March 15, 2005 March 15, 2005 0 days
FM-200502411 05 3/16/05 Woodson Filteration Room Repair sump pump in filteration room for swimmer pool March 9, 2005 March 16, 2005 7 days
FM-200502835 05 3/17/05 Woodson SHS - Temporary Boiler Installation March 17, 2005 March 17, 2005 0 days
FM-200503050 05 3/28/05 WOODSON H D. Fifth fl. Rm 503 Hallway Near Escalator Repair Broken Window Glass March 21, 2005 March 28, 2005 7 days