March 2006 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    4
    Average Time Elapsed: 51.2 Days
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Completed in March 2006 (4)
Description Open Date Close Date Time Elapsed
FM-200619235 06 3/3/06 Repair the lock on the door to room 403 on the fourth floor (glue inside the lock)-Can't get into the classroom March 1, 2006 March 3, 2006 2 days
FM-200619723 06 3/11/06 Ground floor, Kitchen Area. "Emergency Repair or Replace electrical floor outlet. This outlet is located beside the deep fryer. Note: There are exposed wires and sparks shooting from these outlets. March 9, 2006 March 11, 2006 2 days
FM-200620401 06 3/28/06 Ground Level. "Emergency" Need electrician to assess & repair electrical issue. Note: All the lights except the emergency lights are out. . March 27, 2006 March 28, 2006 1 day
FM-200512343 05 3/31/06 Woodson, H. D. Fire Code Violation G Fl. -Breach in wall across from boys locker room-2003 DC Supp. 110.1 Asbestos Code A - Clear for repairs on 09/14/05. Tidewater - Tony Marcolin (RG 09/16/05) September 12, 2005 March 31, 2006 200 days