April 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 50 Days
  • Routine Requests
    9
    Average Time Elapsed: 81.7 Days
  • Total Requests
    10

Detailed Reports

Urgent Repair Requests Completed in April 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200203175 02 4/11/02 (Woodson, H.D.) **Urgent** 1. Asbestos Assessment Required. Ground floor/Hallway: Exit signs were torn of the wall; needs to be replaced immediately. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/21/02 HORNE ENGINEER: ROGER KAGER February 20, 2002 April 11, 2002 50 days

Routine Repair Requests Completed in April 2002 (9)
Description Open Date Close Date Time Elapsed
FM-200205534 02 4/9/02 H.D. Woodson Marking of baseball field April 8, 2002 April 9, 2002 1 day
FM-200104342 01 4/9/02 WOODSON, H.D. BASEMENT - BOILER ROOM 1) ASBESTOS ASSESSMENT REQUIRED 2) INSTALL NEW HAND-WASH SINK WITH NEW FAUCET AND ALL CONTROL. VALUES FOR HOT AND COLD WATER. REPLACING OLD SINK NOT WORKING. Asbestos Code A - Clear for Repair February 26, 2001 April 9, 2002 407 days
FM-200205633 02 4/15/02 H.D. Woodson Boiler room Unstop floor drain blockage in boiler room. Floor is flooding. April 9, 2002 April 15, 2002 6 days
FM-200112125 01 4/16/02 WOODSON, H.D. 1) REPLACE (0) STAINED CEILING TILE (2X4) REPLACE (22) MISSING OR BROKEN (2X4), IN LOCKER ROOM. 2) REPLACE (0) STAINED CEILING TILE (12X12) REPLACE (0) MISSING OR BROKEN (12X12) 3) REPAIR OR REPLACE LIGHT FIXTURES AS NEEDED. (CEILING TILE REPLACEMENT PROJECT) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/18/01 ASBESTOS CODE A-CLEAR FOR REPAIR BY 11-16-01 HORNE ENGINEER: SHARON VOSS June 4, 2001 April 16, 2002 316 days
FM-200205779 02 4/17/02 Woodson SHS Ground Floor - Cafeteria 1) Center set of lights inside cafeteria wont turn on. ### Sat 9 testing today !!! April 15, 2002 April 17, 2002 2 days
FM-200206024 02 4/18/02 H.D. Woodson School Marking of baseball field for game at 4:00 April 18th April 18, 2002 April 18, 2002 0 days
FM-200206103 02 4/19/02 H.D. Woodson School Marking of baseball field for game at 1:00 April 19th April 19, 2002 April 19, 2002 0 days
FM-200206684 02 4/26/02 H.D. Woodson School Marking of baseball field for game at 3:15 April 26th April 26, 2002 April 26, 2002 0 days
FM-200206672 02 4/29/02 Woodson Sr. 1) Unstop floor drains. Water backing up. April 26, 2002 April 29, 2002 3 days