Closed Repair Requests: April 2006

See Also: All Closed Repair Requests at Woodson High School

April 2006 Summary

  • Urgent Requests
    4
    Average Time Elapsed: 848.2 Days
  • Routine Requests
    11
    Average Time Elapsed: 1,001.1 Days
  • Total Requests
    15

Detailed Reports

Urgent Repair Requests Completed in April 2006 (4)
Description Open Date Close Date Time Elapsed
FM-200618701 06 4/12/06 Very Urgent Third Floor-Teachers Restroom Sink Stopped Up-Snake Out Drain. February 15, 2006 April 12, 2006 56 days
FM-200618118 06 4/12/06 Urgent_ Water coolers are not working on floors1-9 and the ground floor. February 1, 2006 April 12, 2006 70 days
FM-200214474 02 4/14/06 (Woodson, H.D.) !!!Emergency!!! Ground Floor/Swimming pool: Repair concrete ceiling which small portions are gradually falling. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) August 14, 2002 April 14, 2006 1,339 days
FM-200100168 1/6/01 4/18/06 (WOODSON, H.D.) GROUND FLOOR MUSIC ROOM REPAIR BADLY DAMAGED BRICK AROUND MUSIC BAND ROOM DOOR NOTE: LOOSE BRICK POSES A SAFETY HAZARD FORMERLY GR-20000334 Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Tony Marcolin (RG 03/11/03) January 6, 2001 April 18, 2006 1,928 days

Routine Repair Requests Completed in April 2006 (11)
Description Open Date Close Date Time Elapsed
FM-200618245 06 4/3/06 Woodson, H.D. Auditorium Repair or replace steam traps on radiator. Size 1-1/2" February 3, 2006 April 3, 2006 59 days
FM-200618340 06 4/3/06 Woodson Boiler Room Repair or replace 1-3/4" domestic hot water line. No hot water in Building. February 6, 2006 April 3, 2006 56 days
FM-200504771 05 4/12/06 (Woodson, H.D.) !!!EMERGENCY!!! Third floor/Boys' Restroom. Repair commode water is continuously leaking from bottom. April 26, 2005 April 12, 2006 351 days
FM-200118823 01 4/14/06 WOODSON, H.D. EXTERIOR - OUTSIDE 1) ASBESTOS ASSESSMENT REQUIRED. 2) REPAIR EXTERIOR HOLES OUTSIDE OF PLAZA. EMERGENCY!!! ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/30/01. HORNE ENGINEERS - STEPHEN CALDWELL August 30, 2001 April 14, 2006 1,688 days
FM-200117985 01 4/14/06 (WOODSON,H.D.) ASBESTOS ASSESSMENT REQ. GROUND FLOOR/ GYM BRICK UP WALL BEHIND WATER FOUNTAIN IN THE GYM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/22/01 HORNE ENGINEERS- DONALD MAGLIENTI August 21, 2001 April 14, 2006 1,697 days
FM-200117986 01 4/14/06 (WOODSON,H.D.) ASBESTOS ASSESSMENT REQ. 2ND AND 3RD FLOORS BRICK OFF WALL ON THE 2ND AND 3RD FLOOR BEHIND WATER COOLER. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/22/01 HORNE ENGINEERS- DONALD MAGLIENTI August 21, 2001 April 14, 2006 1,697 days
FM-200108108 01 4/18/06 H.D. WOODSON (1) ASBESTOS ASSESSMENT REQUIRED. PLAZA ROOF; REPAIR LARGE HOLE IN CEILING. PIPE WAS REPAIRED, NEED MASONS TO DO CEMENT WORK. ASBESTOS CODE A- CLEAR FOR REPAIRS ON 03/03/01. (SAME AS WORK ORDER #FM-200102782) April 11, 2001 April 18, 2006 1,833 days
FM-200102865 2/5/01 4/18/06 WOODSON, HD PRINCIPAL, ATTENDANCE, LIBRARY & OUTSIDE PRINCIPALS OFFICE INSTALL ACCESS PANNELS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/19/01. HORNE ENGINEERING - SHARON VOSS (RG) February 5, 2001 April 18, 2006 1,898 days
FM-200118984 01 4/19/06 WOODSON, H.D. Plaza Outside Pricipals Office Patch hole left from repair of broken pipe. Do not make further penetrations. September 2, 2001 April 19, 2006 1,690 days
FM-200621573 06 4/20/06 Basement-Boy's Restroom: Repair or replace the light switch, it's hanging off the wall. April 20, 2006 April 20, 2006 0 days
FM-200619856 06 4/26/06 Woodson Room #407 Repair or replace 3/4" leaking steam line in classroom #407. March 14, 2006 April 26, 2006 43 days

© The Washington Post Company