Closed Repair Requests: May 2002

See Also: All Closed Repair Requests at Woodson High School

May 2002 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 17.5 Days
  • Routine Requests
    3
    Average Time Elapsed: 127 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in May 2002 (2)
Description Open Date Close Date Time Elapsed
FM-200205293 02 5/7/02 (Woodson, H.D.) 1. Asbestos assessment required. Plaza/Teachers restroom with soda machine: Toilet leaks when flushed; flooding and running out in the stairwell. Asbestos code A - Clear for repairs on 04/05/02. DCPS Safety - Ronald Edwards (202) 576-6693 (RG 04/08/02 ) April 2, 2002 May 7, 2002 35 days
FM-200208739 02 5/31/02 (Woodson, H.D.) !!!Very Urgent!!! 4th Floor/Stairwell #2: Disorderly student kicked the window out. May 31, 2002 May 31, 2002 0 days

Routine Repair Requests Completed in May 2002 (3)
Description Open Date Close Date Time Elapsed
FM-200205864 02 5/7/02 Woodson Pump Room Repair leaking expansion joint to #2 chiller in pump room. No insulation on pipe. !!!!! EMERGENCY !!!!!! April 16, 2002 May 7, 2002 21 days
FM-200113170 01 5/13/02 WOODSON, H.D. GYM, GIRLS LOCKER ROOM, CORRIDOR, ELECTRICAL CLOSET (BEHIND GYM), BOYS LOCKER ROOM. 1) LIGHTING REPLACEMENT 2) REMOVE LIGHTING, REPLACE SURFACE MOUNTED T-12 LAMP FLUORESCENT, REMOVE EXISTING ELECTRIC PANELS. (SCOPE OF WORK AT SERVICE CENTER) CENTENNIAL CONTRACTORS POC: PROJECT MANAGER - RONALD THOMAS : 202-635-0482 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/20/01. June 13, 2001 May 13, 2002 334 days
FM-200206076 02 5/14/02 H.D. Woodson A/C Pump room, Chiller room, B/R Technician needed to open (3) pneumatic zones to supply chill water to class rooms, main office, gymnasium. Zones needed to supply chill water to various areas of the facility. Emergency April 18, 2002 May 14, 2002 26 days

© The Washington Post Company