May 2003 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 38.5 Days
  • Routine Requests
    13
    Average Time Elapsed: 45.4 Days
  • Total Requests
    15

Detailed Reports

Urgent Repair Requests Completed in May 2003 (2)
Description Open Date Close Date Time Elapsed
FM-200228751 03 5/19/03 (Woodson, H.D.) !!!VERY URGENT!!! Auditorium: Provide electrical services to lights in the auditorium. Assess ceiling and attic insulation for acm. Asbestos Code A - Clear for repairs on 04/18/03. Horne Engineering - Sharon Voss (RG 04/23/03) April 14, 2003 May 19, 2003 35 days
FM-200228694 03 5/23/03 (Woodson, H.D.) !!!URGENT!!! 5th Floor/Room #502: Leaking in the ceiling. Asbestos Code A - Clear for repairs on 04/14/03. Horne Engineering - Edward Rodriguez (RG 04/15/03) April 11, 2003 May 23, 2003 42 days

Routine Repair Requests Completed in May 2003 (13)
Description Open Date Close Date Time Elapsed
FM-200329319 03 5/5/03 Woodson Physcial Heating Plant, B/R Please check newly installed Bell & Gasset Hot Water circulating pump, circulating pump is leaking at mechanical seal. Pump needed for domestic Hot Water to Main Kitchen & Facility sanitation purposes. May 1, 2003 May 5, 2003 4 days
FM-200329552 03 5/5/03 Oxon Run Mark baseball field for softball game May 6 @ 4:00 H.D. Woodson vs Ballou May 5, 2003 May 5, 2003 0 days
FM-200329708 03 5/7/03 Woodson School Cut field with big tractor May 7, 2003 May 7, 2003 0 days
FM-200329459 03 5/7/03 H.D.Woodson Boiler room Replace Leaking tubes is the # 2 boiler,the firebox is filled with water, this boiler was used to heat domestic hot water. May 5, 2003 May 7, 2003 2 days
FM-200216398 02 5/13/03 (Woodson, H.D.) Fire code violation: Basement/Auditorium: Door lock is broken. September 3, 2002 May 13, 2003 252 days
FM-200227874 03 5/14/03 (Woodson) !!!EMERGENCY!!! 3rd Floor/Girls restroom: Commode stopped up, and running over, as other toilets are flushed, all other toilets over-flow, and water, fecal matter, and other runs from the seventh floor too the bottom. March 28, 2003 May 14, 2003 47 days
FM-200329344 03 5/14/03 (Woodson, H.D.) HEALTH CODE VIOLATION: Kitchen: Repair water leakage from back of ice machine. May 1, 2003 May 14, 2003 13 days
FM-200330222 03 5/15/03 H.D Woodson Boiler Room Basement Replace hot water circulating pump and adjust aquastat higher May 15, 2003 May 15, 2003 0 days
FM-200330323 03 5/21/03 Woodson, H.D. Plaza Principals restroom Repair lock on door. Principal unable to gain entry. May 19, 2003 May 21, 2003 2 days
FM-200330667 03 5/23/03 Woodson, H.D. Basement - Cafeteria Level 1) One side of the cafeteria, there is no electric. Soda Machine can not keep sodas cold. ( no power) May 23, 2003 May 23, 2003 0 days
FM-200225859 03 5/26/03 Woodson,H.D. Boiler room Asbestos assessment required Replace leaking tubes in the # 1 boiler (engineer will identify) Asbestos Code A - Clear for repairs on 02/19/03. Horne Engineering - Bipin Nanavaty (RG 02/20/03) February 14, 2003 May 26, 2003 101 days
FM-200222258 02 5/27/03 (Woodson, H.D.) Replace kicked out door panels in the following area's: Room #407, 507, girls locker room and office. Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Tony Marcolin (RG 03/11/03) December 9, 2002 May 27, 2003 169 days
FM-200330799 03 5/28/03 Woodson Sr. Ground Floor - Custodial Office 1) Electrical Panel Box - Phaser is out that runs univents. May 28, 2003 May 28, 2003 0 days

© The Washington Post Company