Closed Repair Requests: June 2003

See Also: All Closed Repair Requests at Woodson High School

June 2003 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 151 Days
  • Routine Requests
    5
    Average Time Elapsed: 154 Days
  • Total Requests
    6

Detailed Reports

Urgent Repair Requests Completed in June 2003 (1)
Description Open Date Close Date Time Elapsed
FM-200224436 03 6/23/03 Woodson, H.D. Third floor - Boys bathroom Toilet backing up into corridor. URGENT January 23, 2003 June 23, 2003 151 days

Routine Repair Requests Completed in June 2003 (5)
Description Open Date Close Date Time Elapsed
FM-200112389 01 6/5/03 H.D. WOODSON 3RD FL. ROOM 301 STRUCTURAL MAINT. PLEASE DETERMINE WHETHER THE EXISTING ELECTRICAL CAPACITY WILL HANDLE THE INSTALLATION OF 1 (ONE) 23,000 BTU WINDOW AC UNIT FOR STUDENTS USING THE BARBER SHOP. NO UNIT IS ON SITE. June 5, 2001 June 5, 2003 730 days
FM-200329393 03 6/5/03 Woodson, H.D. Repair electric cover plate make sure new plate is seal with no holes. May 2, 2003 June 5, 2003 34 days
FM-200331205 03 6/6/03 H.D. Woodson School Cut field with big tractor June 4, 2003 June 6, 2003 2 days
FM-200331881 03 6/18/03 H.D. Woodson School Exterior Grounds 1. Cut field with big tractor June 16, 2003 June 18, 2003 2 days
FM-200332157 03 6/21/03 H.D Woodson Pool Room First Floor Pool was down do to electrical power outage. Pool is now back on-line June 19, 2003 June 21, 2003 2 days