Closed Repair Requests: July 2002
See Also: All Closed Repair Requests at Woodson High School
July 2002 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200212506 02 7/24/02 Woodson,H.D. ****Urgent**** 3rd, 4th, 5th, 6th & 7th Floors 1. Replace missing hardware (knobs), and repair non-working urinals & commodes; 2. Water running and will not cut off in the ground floor boys' locker- room, team room & sink in room 302. |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200212451 02 7/24/02 Woodson SHS (room 702) 1. Asbestos assessment is needed. 2. Repair drain line in univent POC: Carnal Bradley 202 438-7437 cell phone Asbestos Code A - Clear for repairs on 07/19/02. Horne Engineering - Roger Kager (RG 07/19/02) | |||
| FM-200212396 02 7/25/02 Woodson H.D. Floors - 7th,6th,5th, and 4th Boys and Girls Restroom. 1) Urinals not working ,will not flush and commodes not working and will not flush. 2) 4 commodes and one leaking. 3) 4 Urinals are leaking. 4) Need (6) paper towels racks and (4) toilet seats. | |||
| FM-200122422 /01 7/29/02 (WOODSON, H.D.) OUTSIDE/ PARKING LOT REPAIR OR REPLACE GATE 11FT. x 8FT. | |||
| FM-200122691 /01 7/29/02 (WOODSON, H.D.) GROUNDS/ TENNIS COURT REPAIR OR REPLACE GATE TO TENNIS COURT. | |||
| FM-200213253 02 7/29/02 Woodson Boiler Room Check and make the necessary repairs to #1 and #2 compressors on chiller #1 the compressors will not activate after going through the timing cycle, both chillers are needed during extremly HOT temperature. EMERGENCY!!!!! |