Closed Repair Requests: July 2002

See Also: All Closed Repair Requests at Woodson High School

July 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 2 Days
  • Routine Requests
    5
    Average Time Elapsed: 111.8 Days
  • Total Requests
    6

Detailed Reports

Urgent Repair Requests Completed in July 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200212506 02 7/24/02 Woodson,H.D. ****Urgent**** 3rd, 4th, 5th, 6th & 7th Floors 1. Replace missing hardware (knobs), and repair non-working urinals & commodes; 2. Water running and will not cut off in the ground floor boys' locker- room, team room & sink in room 302. July 22, 2002 July 24, 2002 2 days

Routine Repair Requests Completed in July 2002 (5)
Description Open Date Close Date Time Elapsed
FM-200212451 02 7/24/02 Woodson SHS (room 702) 1. Asbestos assessment is needed. 2. Repair drain line in univent POC: Carnal Bradley 202 438-7437 cell phone Asbestos Code A - Clear for repairs on 07/19/02. Horne Engineering - Roger Kager (RG 07/19/02) July 19, 2002 July 24, 2002 5 days
FM-200212396 02 7/25/02 Woodson H.D. Floors - 7th,6th,5th, and 4th Boys and Girls Restroom. 1) Urinals not working ,will not flush and commodes not working and will not flush. 2) 4 commodes and one leaking. 3) 4 Urinals are leaking. 4) Need (6) paper towels racks and (4) toilet seats. July 18, 2002 July 25, 2002 7 days
FM-200122422 /01 7/29/02 (WOODSON, H.D.) OUTSIDE/ PARKING LOT REPAIR OR REPLACE GATE 11FT. x 8FT. October 26, 2001 July 29, 2002 276 days
FM-200122691 /01 7/29/02 (WOODSON, H.D.) GROUNDS/ TENNIS COURT REPAIR OR REPLACE GATE TO TENNIS COURT. October 31, 2001 July 29, 2002 271 days
FM-200213253 02 7/29/02 Woodson Boiler Room Check and make the necessary repairs to #1 and #2 compressors on chiller #1 the compressors will not activate after going through the timing cycle, both chillers are needed during extremly HOT temperature. EMERGENCY!!!!! July 29, 2002 July 29, 2002 0 days