Closed Repair Requests: July 2003

See Also: All Closed Repair Requests at Woodson High School

July 2003 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    7
    Average Time Elapsed: 168 Days
  • Total Requests
    7

Detailed Reports

Routine Repair Requests Completed in July 2003 (7)
Description Open Date Close Date Time Elapsed
FM-200104599 01 7/2/03 WOODSON, H.D. GROUND FL. ENGINEERS OFFICE REPAIR RUPTURE STEAM COILS IN AHU FOR KITCHEN. March 1, 2001 July 2, 2003 853 days
FM-200332994 03 7/10/03 Woodson, H.D. Second, fourth and fifth floor Replace wire mesh glass broken and knock out. Room 202, storage room broken size 34 3/4 x 36 3/4 Room 411 wire mesh door entry size 52 1/2 x 17 1/2 room can not be secured. Fifth floor moving stair escalator wire mesh sixe 78 x 12 knock out fire code and 411. July 8, 2003 July 10, 2003 2 days
FM-200225731 03 7/11/03 H.D.Woodson boiler room Asbestos assessment required Repair leaking 1 1/2" return line on the # 1 boiler Asbestos Code A - Clear for repairs on 02/14/03. Horne Engineering - Philp Connolly (RG 02/19/03) February 13, 2003 July 11, 2003 148 days
FM-200331533 03 7/18/03 Woodson Boiler Room Repair or replace sump pumps #3 and #4, not working. Emergency !!!!! June 10, 2003 July 18, 2003 38 days
FM-200333580 03 7/22/03 Woodson, H.D. Fourth floor Nee 250 electrical plug for copy machinein the physical room. Moving copy machine from the plaza. July 22, 2003 July 22, 2003 0 days
FM-200333564 03 7/25/03 (Woodson, H.D) Plaza/Principal's Office: Unable to gain entry to the principals closet, and bathroom, need locksmith to change locks. July 22, 2003 July 25, 2003 3 days
FM-200227469 03 7/31/03 Woodson, H.D. Ground floor Auditorium To Support Elenore Holmes Norton, Congress woman's press conference, Electrician is needed to replace bulbs. Bulbs on site. Event date March 24, 2003 1am. March 21, 2003 July 31, 2003 132 days