Closed Repair Requests: July 2004

See Also: All Closed Repair Requests at Woodson High School

July 2004 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    4
    Average Time Elapsed: 113.8 Days
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Completed in July 2004 (4)
Description Open Date Close Date Time Elapsed
FM-200446862 04 7/7/04 Woodson SHS Emergency !!!! Plaza - Eads Street, Side - Exterior 1) 10 foot gate needs to be re-hung.. Hinges came off from concrete wall. April 20, 2004 July 7, 2004 78 days
FM-200340410 /03 7/27/04 (Woodson, H.D.) Ground floor kitchen and boys toilet Repair toilets kitchen commode needs bolting to floor, Boys urinal need snaking out. November 18, 2003 July 27, 2004 252 days
FM-200445846 04 7/27/04 Woodson, H.D. Ground floor Kitchen Hot water running in double sink. March 25, 2004 July 27, 2004 124 days
FM-200450766 04 7/27/04 Woodson, H.D. Repair plumbing leak in hallway outside main library and multimedia room. July 26, 2004 July 27, 2004 1 day