Closed Repair Requests: August 2003

See Also: All Closed Repair Requests at Woodson High School

August 2003 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 2 Days
  • Routine Requests
    11
    Average Time Elapsed: 27.7 Days
  • Total Requests
    12

Detailed Reports

Urgent Repair Requests Completed in August 2003 (1)
Description Open Date Close Date Time Elapsed
FM-200335663 03 8/21/03 (Woodson, H.D.) !!!VERY URGENT!!! Outside Field: Mark foot-ball field for game dated, August 20, 2003. August 19, 2003 August 21, 2003 2 days

Routine Repair Requests Completed in August 2003 (11)
Description Open Date Close Date Time Elapsed
FM-200334729 03 8/10/03 H.D Woodson A.H.U. Exhaust First Floor Check on contractor to see if fan houseing and fan motor has been installed August 8, 2003 August 10, 2003 2 days
FM-200334735 03 8/10/03 H.D Woodon Boiler Room First Floor Installed temporary pump to pump water out of boiler room August 8, 2003 August 10, 2003 2 days
FM-200333227 03 8/12/03 Woodson, H.D. Groundd outside/fence Hole in fence needs patching or replace. Back of building. July 14, 2003 August 12, 2003 29 days
FM-200330076 03 8/19/03 Woodson,H.D. Mechanical above the Auditorium Repair chill water cooling coil for AHU. in the mechanical room directly above the auditorium, coil leaking this coil is needed to cool the auditorium during the cooling season. Emergency!!!! May 13, 2003 August 19, 2003 98 days
FM-200335527 03 8/20/03 H.D. Woodson School Cut grass on field August 18, 2003 August 20, 2003 2 days
FM-200333433 03 8/20/03 Woodson Boiler Room Check #1 and #2 chiller, chiller keep cutting off. Had to reset approx. 10 times. Still having the same problem. July 18, 2003 August 20, 2003 33 days
FM-200332610 03 8/20/03 H.D. Woodson Boiler room Repair or replace (1) of (2) compressors needed for A/C operation. June 27, 2003 August 20, 2003 54 days
FM-200331882 03 8/20/03 Woodson Boiler Room Check compressor #1 and #2 on chiller, chiller down, no power. Dunhan Bush compressor. June 16, 2003 August 20, 2003 65 days
FM-200336034 03 8/21/03 Woodson Pool Pump/Boiler Room Added water to pool, work on pit pumos in boiler room with Booth. One pit pump is working now. Fuses were on site. August 21, 2003 August 21, 2003 0 days
FM-200334428 03 8/21/03 Woodson, H.D. Outside Replace or repair fence large hole by dumpster. August 5, 2003 August 21, 2003 16 days
FM-200336229 03 8/29/03 H.D. Woodson Remove graffitti from entrance to plaza 55th Street side August 25, 2003 August 29, 2003 4 days