Closed Repair Requests: September 2003

See Also: All Closed Repair Requests at Woodson High School

September 2003 Summary

  • Urgent Requests
    4
    Average Time Elapsed: 102.2 Days
  • Routine Requests
    13
    Average Time Elapsed: 18.4 Days
  • Total Requests
    17

Detailed Reports

Urgent Repair Requests Completed in September 2003 (4)
Description Open Date Close Date Time Elapsed
FM-200228116 03 9/10/03 (Woodson, H.D.) !!!VERY URGENT!!! Outside grounds/Near Boiler room/Driveway: Metal cage hanging from the structure of the wall. Re-anchor cage to wall, as this cage is swaying back and forth, making it very dangerous for staff and students. April 2, 2003 September 10, 2003 161 days
FM-200224437 03 9/12/03 Woodson, H.D. Kitchen Repair leaking line under sink causing flooding. URGENT January 23, 2003 September 12, 2003 232 days
FM-200336851 03 9/12/03 (Woodson, H.D.) !!!URGENT!!! (Woodson, H.D.) Ground Floor/Cafeteria: Floor drains backing up in the custodials office. September 4, 2003 September 12, 2003 8 days
FM-200336850 03 9/12/03 (Woodson, H.D.) !!!URGENT!!! Ground Floor/Kitchen: Pipe leaking from three (3) compartment sink, flooding the kitchen floors. This sink is used to wash food, kitchen utensils, and other items. (Unable to shut water off) 09/09/2003: Engineer called in to report conditions are the same. September 4, 2003 September 12, 2003 8 days

Routine Repair Requests Completed in September 2003 (13)
Description Open Date Close Date Time Elapsed
FM-200333984 03 9/1/03 H.D Woodson Pool Pump Room First Floor Check on pool water and filter system August 30, 2003 September 1, 2003 2 days
FM-200333980 03 9/1/03 H.D Woodson Pool Room First Floor Working on dehumidifier with contractor and Mr. Curtis Emerson August 30, 2003 September 1, 2003 2 days
FM-200336491 03 9/2/03 Woodson Boiler Room Repair or replace #3 and #4 sump pump, not working. August 28, 2003 September 2, 2003 5 days
FM-200335869 03 9/9/03 Woodson,H.D. Boiler Room Repair or replace #3 and #4 sump pump, pumps not working. August 20, 2003 September 9, 2003 20 days
FM-200336958 03 9/17/03 Woodson H.D. Boiler room Repair chiller, will not start ,off on high motor temp. September 8, 2003 September 17, 2003 9 days
FM-200337857 03 9/23/03 Woodson, H.D. Boiler Room Boiler Room flooded. Pump water from flooded Boiler Room. September 23, 2003 September 23, 2003 0 days
FM-200337948 03 9/26/03 Woodson, HD Emergency !! Plaza - Main Office 1) Replace large window due to storm damage. September 24, 2003 September 26, 2003 2 days
FM-200336012 03 9/29/03 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Activity Hallway: Double doors not closing properly. Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 August 21, 2003 September 29, 2003 39 days
FM-200336018 03 9/29/03 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Cafeteria Stairwell #3: Broken door hardware. Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 August 21, 2003 September 29, 2003 39 days
FM-200336011 03 9/29/03 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Music & Band Hall: Double doors not closing properly. Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 August 21, 2003 September 29, 2003 39 days
FM-200335977 03 9/29/03 (Woodson, H.D.) FIRE CODE VIOLATION: Ground Floor/Receiving Hallway: Breach in door. Asbestos Code A - Clear for repairs on 08/21/03. Horne Engineering - Tony Marcolin (RG 08/22/03) August 21, 2003 September 29, 2003 39 days
FM-200335976 03 9/29/03 (Woodson, H.D.) FIRE CODE VIOLATION: Plaza/Stairwell #1: Exit door not closing properly. Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 August 21, 2003 September 29, 2003 39 days
FM-200338077 03 9/30/03 Woodson Boiler Room Check chiller, will not come on. Both down. September 26, 2003 September 30, 2003 4 days