Closed Repair Requests: September 2003

See Also: All Closed Repair Requests at Woodson High School

September 2003 Summary

  • Urgent Requests
    4
    Average Time Elapsed: 102.2 Days
  • Routine Requests
    13
    Average Time Elapsed: 18.4 Days
  • Total Requests
    17

Detailed Reports

Urgent Repair Requests Completed in September 2003 (4)
Description Open Date Close Date Time Elapsed
FM-200228116 03 9/10/03 (Woodson, H.D.) !!!VERY URGENT!!! Outside grounds/Near Boiler room/Driveway: Metal cage hanging from the structure of the wall. Re-anchor cage to wall, as this cage is swaying back and forth, making it very dangerous for staff and students. April 2, 2003 September 10, 2003 161 days
FM-200336851 03 9/12/03 (Woodson, H.D.) !!!URGENT!!! (Woodson, H.D.) Ground Floor/Cafeteria: Floor drains backing up in the custodials office. September 4, 2003 September 12, 2003 8 days
FM-200336850 03 9/12/03 (Woodson, H.D.) !!!URGENT!!! Ground Floor/Kitchen: Pipe leaking from three (3) compartment sink, flooding the kitchen floors. This sink is used to wash food, kitchen utensils, and other items. (Unable to shut water off) 09/09/2003: Engineer called in to report conditions are the same. September 4, 2003 September 12, 2003 8 days
FM-200224437 03 9/12/03 Woodson, H.D. Kitchen Repair leaking line under sink causing flooding. URGENT January 23, 2003 September 12, 2003 232 days

Routine Repair Requests Completed in September 2003 (13)
Description Open Date Close Date Time Elapsed
FM-200333984 03 9/1/03 H.D Woodson Pool Pump Room First Floor Check on pool water and filter system August 30, 2003 September 1, 2003 2 days
FM-200333980 03 9/1/03 H.D Woodson Pool Room First Floor Working on dehumidifier with contractor and Mr. Curtis Emerson August 30, 2003 September 1, 2003 2 days
FM-200336491 03 9/2/03 Woodson Boiler Room Repair or replace #3 and #4 sump pump, not working. August 28, 2003 September 2, 2003 5 days
FM-200335869 03 9/9/03 Woodson,H.D. Boiler Room Repair or replace #3 and #4 sump pump, pumps not working. August 20, 2003 September 9, 2003 20 days
FM-200336958 03 9/17/03 Woodson H.D. Boiler room Repair chiller, will not start ,off on high motor temp. September 8, 2003 September 17, 2003 9 days
FM-200337857 03 9/23/03 Woodson, H.D. Boiler Room Boiler Room flooded. Pump water from flooded Boiler Room. September 23, 2003 September 23, 2003 0 days
FM-200337948 03 9/26/03 Woodson, HD Emergency !! Plaza - Main Office 1) Replace large window due to storm damage. September 24, 2003 September 26, 2003 2 days
FM-200336012 03 9/29/03 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Activity Hallway: Double doors not closing properly. Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 August 21, 2003 September 29, 2003 39 days
FM-200335976 03 9/29/03 (Woodson, H.D.) FIRE CODE VIOLATION: Plaza/Stairwell #1: Exit door not closing properly. Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 August 21, 2003 September 29, 2003 39 days
FM-200335977 03 9/29/03 (Woodson, H.D.) FIRE CODE VIOLATION: Ground Floor/Receiving Hallway: Breach in door. Asbestos Code A - Clear for repairs on 08/21/03. Horne Engineering - Tony Marcolin (RG 08/22/03) August 21, 2003 September 29, 2003 39 days
FM-200336011 03 9/29/03 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Music & Band Hall: Double doors not closing properly. Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 August 21, 2003 September 29, 2003 39 days
FM-200336018 03 9/29/03 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Cafeteria Stairwell #3: Broken door hardware. Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 August 21, 2003 September 29, 2003 39 days
FM-200338077 03 9/30/03 Woodson Boiler Room Check chiller, will not come on. Both down. September 26, 2003 September 30, 2003 4 days