Closed Repair Requests: September 2006

See Also: All Closed Repair Requests at Woodson High School

September 2006 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    10
    Average Time Elapsed: 248.7 Days
  • Total Requests
    10

Detailed Reports

Routine Repair Requests Completed in September 2006 (10)
Description Open Date Close Date Time Elapsed
FM-200625009 06 9/5/06 Seventh floor, Principal's Office. Repair or Replace door knob lock. June 29, 2006 September 5, 2006 68 days
FM-200504197 05 9/7/06 ( WOODSON, H.D. ) Outside - Back of building, near dumpster 1) Bulk Trash pick up. April 18, 2005 September 7, 2006 507 days
FM-200627769 06 9/7/06 Ground Floor/Room in Kitchen area remove bulk trash. August 16, 2006 September 7, 2006 22 days
FM-200625097 06 9/11/06 (Woodson, H.D.) Auditorium and Stairwell. Repair or Replace coil, no heat in the auditorium and stairwell. July 1, 2006 September 11, 2006 72 days
FM-200512229 05 9/11/06 Woodson, H. D. Fire Code Violation Thru-Out - Light fixture covers missing-2003 DC Supp. 110.1(1) September 9, 2005 September 11, 2006 367 days
FM-200511537 05 9/20/06 Woodson, H.D. Music Room Repair/replace leaking pipe in univent on 1st floor in Music room. August 29, 2005 September 20, 2006 387 days
FM-200506059 05 9/21/06 Woodson Girls Locker Room Repair or replace a ruptured heating ciol unit has been isolated. May 27, 2005 September 21, 2006 482 days
FM-200504680 05 9/21/06 Woodson Boiler Room Repair or replace drain line (2 valves) on chiller inchiller room in back of Boiler Room. April 25, 2005 September 21, 2006 514 days
FM-200628485 06 9/29/06 Woodson , H.D. Boiler room Repair chiller, unit will not stay on cut on code # 83 August 30, 2006 September 29, 2006 30 days
FM-200628142 06 9/29/06 Woodson H. D. Wellness Center Repair or replace motor evaportor system August 22, 2006 September 29, 2006 38 days