Open Repair Requests: January 2006

See Also: All Open Repair Requests at Woodson High School

January 2006 Summary

  • Urgent Requests
    2
  • Routine Requests
    2
  • Total Requests
    4

Detailed Reports

Urgent Repair Requests Opened in January 2006 (2)
Description Open Date
FM-200517269 1/9/06 Woodson Room #210 Asbestos assessment required on line. Repair or replace rupture steam line in ceiling by window in room #210.. Can not be isolated Urgent !!!!! Asbestos Code B - on 01/09/06. Tidewater - Tony Marcolin - (RG 01/10/06) Asbestos Code A - Abated and cleared for repairs on 10/20/06 by Goel Construction (LM/02-08-07) Safety Office 202-576-8962 January 9, 2006
FM-200617385 1/12/06 Sixth floor, Teachers' Lounge Restroom. "Urgent" Repair or Replace restroom lock, staff are unable to unlock door to gain entry into the teachers" restroom. January 12, 2006

Routine Repair Requests Opened in January 2006 (2)
Description Open Date
FM-200617618 1/20/06 Woodson Swimming Pools On going Pool maintenance Chemical treatment, backwash of filter system and pump PM, Vacuum pools and check all related equipment. January 20, 2006
FM-200618035 1/30/06 Emergency! Ground Floor-Bandroom doors are unsecure and all equipment is in the room, door can't be locked. Repair or replace locks on the door. See Mr. Jones January 30, 2006

© The Washington Post Company