Open Repair Requests: October 2006
See Also: All Open Repair Requests at Woodson High School
October 2006 Summary
-
Urgent Requests
0 -
Routine Requests
8 -
Total Requests
8
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200630582 10/6/06 7th Floor- Girls Restroom Repair brick wall. | |
| FM-200630583 10/6/06 7th Floor- Girls Restroom Re-attach hand sink. | |
| FM-200630610 10/10/06 Woodson , HD Library Asbestos assesment required. Repair ruptured 1- 1/4 " black pipe supply line on unit in the library. Asbestos Code A - Clear for repairs on 10/19/06. Tidewater - Roger Small (RG 10/23/06) | |
| FM-200630766 10/13/06 Woodson,H.D. Boiler room Emergency!!!!!!! Repair or repalce burnt out sump pumps, the drop- in pumps are are not working, water is rising over the floor. | |
| FM-200630870 10/17/06 Interior wall in girls' restroom. Repair masonry wall so that sink can be reattached to to wall. Note: The students are unable to wash their hands. Asbestos Code A - Clear for repairs on 10/19/06. Tidewater - Roger Small (RG 10/24/06) | |
| FM-200631158 10/23/06 Plaza - Switch leading to the cafeteria freezer - Need the cage weld together. | |
| FM-200631385 10/26/06 Outside - Repair or replace the fence around the building. | |
| FM-200631568 10/31/06 Boiler Room - Pump water out of flooded boiler room. Pump problem. Approx: 18" of water on floor. |
© The Washington Post Company
