Open Repair Requests: October 2006

See Also: All Open Repair Requests at Woodson High School

October 2006 Summary

  • Urgent Requests
    0
  • Routine Requests
    8
  • Total Requests
    8

Detailed Reports

Routine Repair Requests Opened in October 2006 (8)
Description Open Date
FM-200630582 10/6/06 7th Floor- Girls Restroom Repair brick wall. October 6, 2006
FM-200630583 10/6/06 7th Floor- Girls Restroom Re-attach hand sink. October 6, 2006
FM-200630610 10/10/06 Woodson , HD Library Asbestos assesment required. Repair ruptured 1- 1/4 " black pipe supply line on unit in the library. Asbestos Code A - Clear for repairs on 10/19/06. Tidewater - Roger Small (RG 10/23/06) October 10, 2006
FM-200630766 10/13/06 Woodson,H.D. Boiler room Emergency!!!!!!! Repair or repalce burnt out sump pumps, the drop- in pumps are are not working, water is rising over the floor. October 13, 2006
FM-200630870 10/17/06 Interior wall in girls' restroom. Repair masonry wall so that sink can be reattached to to wall. Note: The students are unable to wash their hands. Asbestos Code A - Clear for repairs on 10/19/06. Tidewater - Roger Small (RG 10/24/06) October 17, 2006
FM-200631158 10/23/06 Plaza - Switch leading to the cafeteria freezer - Need the cage weld together. October 23, 2006
FM-200631385 10/26/06 Outside - Repair or replace the fence around the building. October 26, 2006
FM-200631568 10/31/06 Boiler Room - Pump water out of flooded boiler room. Pump problem. Approx: 18" of water on floor. October 31, 2006

© The Washington Post Company