March 2003 Summary

  • Urgent Requests
    0
  • Routine Requests
    5
  • Total Requests
    5

Detailed Reports

Routine Repair Requests Opened in March 2003 (5)
Description Open Date
FM-200226512 3/4/03 Woodson, H.D. First floor greenhouse Make necessary roof repairs. Approximately twelve (12) sections of lexan along with metal support brackets have warped or fallen out as a result of the snow storm, and now exposed to the element of nature. March 4, 2003
FM-200226633 3/6/03 H.D. Woodson Boiler Room Repair/Replace burned out univent motor in classroom ,on the second floor. March 6, 2003
FM-200226702 3/7/03 WOODSON REPAIR AND REMOVE FLOOR TILE AMP AREA 102. Asbestos Code A - Clear for repairs on 03/10/03. No floor tiles was observed in stated work area. Horne Engineering - Tony Marcolin (RG 04/08/03) March 7, 2003
FM-200226703 3/7/03 WOODSON REPAIR URINALS , SINK THAT ARE NOT WORKING. Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Tony Marcolin (RG 03/11/03) March 7, 2003
FM-200226704 3/7/03 WOODSON CHECK FOR LEAD BASE PAINT IN THE KITCHEN AREA . Lead & Asbestos Code A - Clear for repairs on 03/07/03. Horne Engineering - Edward Rodriguez (RG 03/10/03) March 7, 2003