Open Repair Requests: March 2003
See Also: All Open Repair Requests at Woodson High School
March 2003 Summary
- Urgent Requests
0 - Routine Requests
5 - Total Requests
5
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200226512 3/4/03 Woodson, H.D. First floor greenhouse Make necessary roof repairs. Approximately twelve (12) sections of lexan along with metal support brackets have warped or fallen out as a result of the snow storm, and now exposed to the element of nature. | |
| FM-200226633 3/6/03 H.D. Woodson Boiler Room Repair/Replace burned out univent motor in classroom ,on the second floor. | |
| FM-200226702 3/7/03 WOODSON REPAIR AND REMOVE FLOOR TILE AMP AREA 102. Asbestos Code A - Clear for repairs on 03/10/03. No floor tiles was observed in stated work area. Horne Engineering - Tony Marcolin (RG 04/08/03) | |
| FM-200226703 3/7/03 WOODSON REPAIR URINALS , SINK THAT ARE NOT WORKING. Asbestos Code A - Clear for repairs on 03/10/03. Horne Engineering - Tony Marcolin (RG 03/11/03) | |
| FM-200226704 3/7/03 WOODSON CHECK FOR LEAD BASE PAINT IN THE KITCHEN AREA . Lead & Asbestos Code A - Clear for repairs on 03/07/03. Horne Engineering - Edward Rodriguez (RG 03/10/03) |