Open Repair Requests: March 2005

See Also: All Open Repair Requests at Woodson High School

March 2005 Summary

  • Urgent Requests
    0
  • Routine Requests
    5
  • Total Requests
    5

Detailed Reports

Routine Repair Requests Opened in March 2005 (5)
Description Open Date
FM-200502170 3/2/05 Woodson Perform PM to Chiller and all equipment. March 2, 2005
FM-200502320 3/8/05 Woodson Pool Area Repair or replace dehumidifier air handler has a busted pipe in Pool Area. March 8, 2005
FM-200502838 3/17/05 Woodson Gym Mechanical Room Repair or replace electrical controls for motors to the condensate return tank in the mechanical room in Gym. Spec-35H516-72 Amp-6/4.5-4.3 Frame 56J Ser- F792 HZ-60 HP- 1/2-DP Volts 115/208-250 PH-1 RPM 1725 Class-B March 17, 2005
FM-200502839 3/17/05 Woodson Laundry room/ Gym Area Repair or replace electrical controls for motors to the condensate return tank in the mechanical room in Gym area. Spec-35H516-72 Amp-8.6/4.5-4.3 Frame 56J Ser- F792 HZ-60 HP- 1/2-DP Volts 115/208-230 PH-1 RPM 1725 Class-B March 17, 2005
FM-200502840 3/17/05 Woodson Auditorium Mechanical Room Repair or replace electrical controls for motors to the condensate return tank in the mechanical room rear of stage area. Spec-35H516-72 Amp-8.6/4.5-4.3 Frame 56J Ser- F792 HZ-60 HP- 1/2-DP Volts 115/208-230 PH-1 RPM 1725 Class-B March 17, 2005

© The Washington Post Company