Open Repair Requests: July 2006

See Also: All Open Repair Requests at Woodson High School

July 2006 Summary

  • Urgent Requests
    0
  • Routine Requests
    5
  • Total Requests
    5

Detailed Reports

Routine Repair Requests Opened in July 2006 (5)
Description Open Date
FM-200625168 7/3/06 Principal's Office/Back Exit Door - Change Lock July 3, 2006
FM-200625699 7/14/06 Woodson Boiler Room Open boiler drain with a new access hole for cleaning scale. July 14, 2006
FM-200625700 7/14/06 Woodson Boiler Room Repair refractory on Boiler #1 July 14, 2006
FM-200626193 7/24/06 Woodson Boiler Room Repair or replace chill water circulating pump #10 and #11. These pumps serve the auditorium and Gym area. July 24, 2006
FM-200626286 7/24/06 Plaza Area- Exit Door Repair/replace lock; the building was broken into yesterday. Note: The building cannot be secured. July 24, 2006