Open Repair Requests: September 2002

See Also: All Open Repair Requests at Woodson High School

September 2002 Summary

  • Urgent Requests
    0
  • Routine Requests
    2
  • Total Requests
    2

Detailed Reports

Routine Repair Requests Opened in September 2002 (2)
Description Open Date
FM-200217305 0217305 9/11/02 Woodrow Wilson SHS Basement Pool Pump Room R/R 6" acruwaiter valve on return line. Valve might be bad, won't close when power goes out. Pool dumps when power goes out. September 11, 2002
FM-200218532 0218532 9/30/02 Repair sheet metal work on the back of # 2 boiler, as per A. Colvin , Boiler Inspector. September 30, 2002

© The Washington Post Company