Open Repair Requests: September 2006

See Also: All Open Repair Requests at Woodson High School

September 2006 Summary

  • Urgent Requests
    0
  • Routine Requests
    7
  • Total Requests
    7

Detailed Reports

Routine Repair Requests Opened in September 2006 (7)
Description Open Date
FM-200628944 9/7/06 Woodson Boiler Room Replace condensate system for Boiler #1 and #2 September 7, 2006
FM-200629632 9/18/06 Unclog grease trap; kitchen area is flooding. September 18, 2006
FM-200629740 9/20/06 Kitchen - Electrical Outlet - Shooting Sparks. September 20, 2006
FM-200629875 9/22/06 Classroom #506 Home Economics Lab Unstop clogged sink. Double sink located on the inside hall wall. Building staff is not able to unstop drain and is requested assistance. Note: Classroom has been placed off limits until repairs are complete. Contact Pedro Macins, Building Engineer September 22, 2006
FM-200629945 9/25/06 Basement- Kitchen Repair/replace broken floor plug. It is out of the floor. September 25, 2006
FM-200630268 9/29/06 Install lights in the gym are. September 29, 2006
FM-200630294 9/29/06 Ground Floor- Armory Repair/replace lock on the storage room. September 29, 2006