Open Repair Requests: September 2006
See Also: All Open Repair Requests at Woodson High School
September 2006 Summary
- Urgent Requests
0 - Routine Requests
7 - Total Requests
7
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200628944 9/7/06 Woodson Boiler Room Replace condensate system for Boiler #1 and #2 | |
| FM-200629632 9/18/06 Unclog grease trap; kitchen area is flooding. | |
| FM-200629740 9/20/06 Kitchen - Electrical Outlet - Shooting Sparks. | |
| FM-200629875 9/22/06 Classroom #506 Home Economics Lab Unstop clogged sink. Double sink located on the inside hall wall. Building staff is not able to unstop drain and is requested assistance. Note: Classroom has been placed off limits until repairs are complete. Contact Pedro Macins, Building Engineer | |
| FM-200629945 9/25/06 Basement- Kitchen Repair/replace broken floor plug. It is out of the floor. | |
| FM-200630268 9/29/06 Install lights in the gym are. | |
| FM-200630294 9/29/06 Ground Floor- Armory Repair/replace lock on the storage room. |