| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200119930 01 10/18/01 (YOUNG) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ KINDERGARDEN UNSTOP (2) TWO TOILETS IN THE AREA. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 | |||
| FM-200122697 /01 11/3/01 YOUNG CAFETERIA/TUNNEL 1ST FL. 1. ASBESTOS ASSESSMENT REQUIRED. 2. FLOODED TUNNEL TO BE PUMPED OUT. 3. REPAIR RUPTURED 1" LINE FEEDING UNIVENT. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/30/01. CHARLES BUCHANAN - SAFETY (202)576-5582 (RG) | |||
| FM-200104193 01 11/9/01 YOUNG BASEMENT BOILER ROOM INSTALL REFRIGERANT MONITOR FOR R-123 CHILLER. NO MONITOR CREATES SAFETY HAZARD. | |||
| FM-200118041 01 11/9/01 (YOUNG) ASBESTOS ASSESSMENT REQ. OUTSIDE BUILDING SURVEY AND REPAIR INSTALL OUTSIDE LIGHTS. (WHEN LIGHTS ARE DUE TO COME ON AT NIGHT HALF DO AND HALF DONT. WILL STAY ON A WHILE AND TRIP THE BREAKER IN THE BASEMENT. ASBESTOS CODE A - CLEAR FOR REPAIR ON 08/30/01. SYLVIA GRIMES - SAFETY (202)576-5583 | |||
| FM-200207038 02 5/10/02 Young 1. Asbestos Assessment Reqd. 1G/Maintenance Office 2. Repair or replace door to the maintenance office, and repair the lock. Asbestos Code A - Clear for repairs on 05/03/02. DCPS Safety - Ronald Edwards (RG 05/06/02) | |||
| FM-200205305 02 6/12/02 (Young) 1. Asbestos assessment required. 1st Floor/Kindergarten bathroom: Need plumber to unstop teachers toilet; staff tried to unstop toilet with no success. (25 ft snake could not reach the problem) Asbestos code A - Clear for repairs on 04/05/02. DCPS Safety - Ronald Edwards (202) 576-6693 (RG 04/08/02 ) | |||
| FM-200210874 02 7/11/02 (Young) ***Very Very URGENT*** First floor/Main entrance door: Key is in damaged conditioned; key is cracked in the center. Possibility of breaking off completely in cylinder if continued use. | |||
| FM-200116159 01 7/30/02 YOUNG 1ST FLOOR - CENTER ENTRANCE DOOR & DOORS ON STAIRS ASBESTOS ASSESSMENT REQUIRED SURVEY & SECURE THE DOORS WITH LOCKS & KEYS. NOTE: THESE DOORS NEED LOCKING AT TIMES SO UNKNOWNS CAN NOT ENTER. ASBESTOS CODE B 10/12/01 BY HORNE ENGINEER ROGER KAGER Asbestos Code A - Clear for repairs on 7/16/02 DCPS Safety, R. Edwards (RE -7/16/02) | |||
| FM-200219588 /02 11/15/02 Young Center #3 Check insulation for asbestos on supply line to univent on second floor and repair or stop water from leaking from this line (pipe) which continuously leaks down onto ceiling on first floor causing ceiling tiles to fall and creating a safety hazard for students. See Mr. Brown Please expedite Asbestos Code A - Clear for repairs on 10/18/02. Horne Engineering - Philp Connolly (RG 10/21/02) | |||
| FM-200220505 02 1/21/03 Young Outside Need the fence put back on track on lower parking lot. The fence has a rolling gate which is off track. Need fixing so cars can be lock in for safety. | |||
| FM-200331337 03 6/13/03 Young Boiler room roof Install guard rail around smoke stack near cooling tower on roof for safety. | |||
| FM-200444745 04 3/4/04 Young Boiler Room Repair or replace domestic hot water heater, will not stay on. Need hot water for kitchen. Urgent !!!! | |||
| FM-200446852 04 6/6/04 Young Urgent !!!! Cafeteria 1) Large peices of plaster fell from wall. There is a large hole in the wall. Have to isolate area in order for students to eat... Asbestos Code A - Clear for repairs on 04/20/04. Horne Engineering - Bjarne Smith (RG 04/20/04) | |||
| FM-200449291 04 6/14/04 Young Chiller Room Check chiller, chiller keep cutting off. Urgent !!!!! | |||
| FM-200451544 04 8/9/04 Young Kitchen Repair univent coil in kitchen water is leaking all over flow. Safety Hazard. | |||
| FM-200338955 /03 10/15/04 (Young) !!!VERY URGENT!!! Playground Area: Bolts that holds light pole has come loose, and leaning. Due to the high winds, staff is fearful that the pole will fall, putting students/staff in danger. | |||
| FM-200454338 04 12/8/04 Young First floor Repair panic bar to exit door in area. Will not secure door, must slide bolt on it to secure from outside. Asbestos Code A - Clear for repairs on 09/13/04. DCPS Safety - Leroy Minton Jr. (RG 09/13/04) | |||
| FM-200459417 04 12/15/04 Young URGENT Exterior grounds Replace leaking water main valves. | |||
| FM-200453781 04 12/27/04 Young Plastering is needed in center 2 badly bay window. P.S. is due to moisture from outside leaking when has been repair. Asbestos Code A - Clear for repairs on 09/02/04. DCPS Safety - Leroy Minton Jr. (RG 09/03/04) | |||
| FM-200459685 /04 1/5/05 YOUNG LOADING DOCK-STOARGE RM. REPLACE LOCK ON DOOR Asbestos Code A - Clear for repairs on 12/22/04. DCPS Safety - Leroy Minton Jr. (RG 12/22/04) | |||
| FM-200103274 01 7/25/05 YOUNG KINDERGARTEN 1ST FLOOR INSPECT BRICK WORK (POSSIBLE FUNGUS). BLACK SPOTS ARE PROTRUDING THROUGHOUT THE WALL. Code A - NO ACM IMPACT PER LEROY MINTON OF DCPS SAFETY 04-05-01 (DCPS SAFETY SHEILA R. HOWARD 11-29-01) | |||
| FM-200510403 05 8/15/05 (Young) "URGENT" Exterior Rear/Loading dock. Repair lock on door, staff cannot secure building. | |||
| FM-200448564 04 10/15/05 YOUNG AUDITORIUM URGENT!!!! UNstop ot reroute drain line located behind stage on the wall. 3" drain line is clogged and leaking down on to stage causing damage to flooring. | |||
| FM-200459133 04 10/15/05 Young First floor center 1 T-starte area Repair conrete wall in storeroom. Wall was burst open to fix leak in wall. Asbestos Code A - Clear for repairs on 12/03/04. DCPS Safety -Richard Gibson (RG 12/03/04) | |||
| FM-200503366 05 10/15/05 Young First fl. Store room Ceiling Repair Concrete Ceiling Asbestos Code A - Clear for repairs on 03/29/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200339065 /03 12/14/05 Young Playground Remove graffitti from building. URGENT | |||
| FM-200458901 04 1/23/06 Young First floor music room Repair or replace door, crack at the top, hinges and is very loose, might fall. Asbestos Code A - Clear for repairs on 12/02/04. DCPS Safety - Leroy Minton Jr. (RG 12/03/04) | |||
| FM-200515177 05 1/24/06 Urgent: Unstop mop sink in the custodian closet next to the kitchen. | |||
| FM-200515176 05 1/25/06 Urgent: Unstop 2 urinals in boys bathroom on the second floor. Unstop the urinal in boys locker room and boys bathroom in the hallway leading to the gym. | |||
| FM-200515537 /05 1/25/06 Urgent: Repair leak in the ceiling in the main office Asbestos Code A - Clear for repairs on 11/17/05. Tidewater - Philp Connolly (RG 11/21/05 | |||
| FM-200116669 01 2/3/06 YOUNG OUTSIDE - BASEMENT DOOR ACROSS FROM M. BROWN ASBESTOS ASSESSMENT REQUIRED SURVEY & REPLACE LARGE METAL DOOR LEADING INTO BASEMENT TUNNELS. DOOR IS VERY HARD TO OPEN DUE TO WEAR & TEAR. NEED A CROW BAR TO OPEN IT. URGENT ASBESTOS CODE B10/12/01 BY HORNE ENGINEER ROGER KAGER Asbestos Code A - Clear for repairs on 7/17/02 DCPS Safety - R. Edwards (RE - 7/17/02) | |||
| FM-200202051 02 2/3/06 (YOUNG) ASBESTOS ASSESSMENT REQUIRED 1ST & 2ND FLOORS/GYM LOBBY & STAIRWAY #4 REPAIR OR REPLACE DOOR CLOSER ON DOORS TO THE 1ST FLOOR GYM & 2ND FLOOR STAIRWAY #4 Asbestos Code A - Clear for repairs on 7/15/02 DCPS Safety R. Edwards, (RE - 7/15/02) | |||
| FM-200618994 06 3/27/06 First Floor-Principal Office Very Urgent Replace or repair the flush valve assemble-The bathroom is out of order. | |||
| FM-200620539 06 4/3/06 Urgent First & Second Floor-Teachers Restroom Repair the stop valve-Teachers can't use bathroom because water is cut off. | |||
| FM-200208270 02 4/14/06 Young 1. Asbestos Assessment Reqd. Male Teachers' Restroom Repair the cement wall behind the urinals in the men teachers' restroom [was broken out in order to repair pipe leaks]. The plumbing work was completed and the masonry repair now needs to take place. Asbestos Code A - Clear for repairs on 05/28/02. DCPS Safety - Sheila R Howard (RG 05/28/02) | |||
| FM-200618500 06 5/15/06 Asbestos Assessment Required. "Urgent" Need electrician to install electrical outlet for photocopying machine in the teachers' lounge. Note: This is a matter of urgency. The photocopying machine is presently located in the "Health Suite", it has to be moved asap!!! Asbestos Code A - Clear for repairs on 02/09/06. Tidewater - Thomas Johnson (RG 02/10/06) | |||
| FM-200506111 05 5/19/06 Young Center One Paint and Plaster the Ceiling Lead & Asbestos Code A - Clear for repairs on 05/31/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200513814 /05 6/2/06 Young Urgent Outside-Court by Custodian Office Repair hole in fence | |||
| FM-200513815 /05 6/2/06 Young Urgent Outside-Around Playground Repair fence | |||
| FM-200513187 05 6/21/06 Young Boiler Room Provide pull chain on safety relief valves on Boilers Per DC Boiler Inspector | |||
| FM-200620746 06 8/2/06 Young Boiler Room Repair or replace domestic hot water heater and 1" gas line going to heater. No hot water in Building. Urgent !!! | |||
| FM-200625314 06 8/28/06 Broken Storm Drain Cover On Playground Area. (Safety Hazard) | |||
| FM-200513427 05 1/24/07 Young First Floor - Main Office - Admin Office - Counselor's Office Asbestos and Mold Assessment Check plaster walls, ceiling tile and pipe lines in areas of concern. Code A - clear for repairs as of 10/03/05 by Sylvia Grimes safety. | |||
| FM-200515480 /05 1/24/07 Asbestos Assessment Required. First floor, Teachers' Lounge. "Urgent" Need electricians to do a survey & install an electrical outlet in the teachers' lounge, for a xerox copy machine. | |||
| FM-200514223 /05 1/24/07 Young Lunch Room Need large ladder or cherry picker to reach light globe and ceiling tiles. Pieces are falling down and could fall on someone. Asbestos Code A - Clear for repairs on 10/25/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200218136 02 1/24/07 Young Asbestos Assessment Reqd. 1st Floor Cafeteria Replace/repair ceiling tile in the cafeteria. Asbestos Code A - Cleared for repairs on 12-02-02 (LM / 12-02-02) Leroy Minton Jr. / Safety Office 202-576-8962 | |||
| FM-200459732 /04 1/24/07 YOUNG THROUGH-OUT BUILDING REPLACE DOOR CLOSERS IN BUILDING First Fl. Art room 110 Replace 8" deck-mounted kitchen faucet. Asbestos Code A - Clear for repairs on 12/22/04. DCPS Safety - Leroy Minton Jr. (RG 12/22/04) | |||
| FM-200214083 02 1/24/07 Young 1. Asbestos Assessment Reqd. 1st floor Room 34 [Lunch Room] 2. Replace fallen ceiling tiles---ceiling height approx. 15ft from floor. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Richard Gibson (RG 08/22/02) | |||
| FM-200458704 /04 1/24/07 Young EMERGENCY First floor lunchroom Need wall repair it is buckle out and it could fall. Asbestos Code A - Clear for repairs on 11/26/04. DCPS Safety - Ronald Edwards (RG 11/29/04) | |||
| FM-200621313 06 1/24/07 Asbestos Assessment Required. 1st Floor- Boys bathroom next to Kindergarten Need carpenter to replace partition, may have been vandalized. Asbestos Code A - Clear for repairs on 04/13/06 DCPS Safety - Richard Gibson (RG) | |||
| FM-200203129 02 1/24/07 (Young) Asbestos Assessment Reqd. 1st floor/ Main lobby, inside gym, lobby leading to center Repair or replace panic bar on following doors. (Need securing from outside when unlocked) Asbestos Code A, clear for repairs on 6/05/02 DCPS Safety, R. Edwards (RE - 6/05/02 | |||
| FM-200226893 03 1/30/07 Young Boiler Room P.M Chiller Asbestos Code A - Clear for repairs on 03/18/04. DCPS Safety - Richard Gibson (RG 03/18/04) | |||
| FM-200701201 07 3/20/07 2nd fl. 5th grade Special Ed - safety glass not installed properly - No putty around glass. Glass is loose in frame Asbestos Code A - Clear for repairs on 03/08/07. Tidewater - Kenny Long (RG 03/13/07) | |||
| FM-200701252 07 3/20/07 2nd fl. Double doors in hallway missing safety glass - Right side door glass measures 8x30 inches. Asbestos Code A - Clear for repairs on 03/08/07. Tidewater - Kenny Long (RG 03/13/07) |