Description Open Date Close Date Time Elapsed
FM-200119563 01 9/22/01 (BROOKLAND) !!!!!! URGENT !!!!!! REMOVE BROKEN KEY FROM LOCK CYLINDER, THIS STORAGE ROOM IS USED TO STORE COMPUTERS. A TECHNICIAN IS IN THE BUILDING TO SET UP THE COMPUTERS. (ITS URGENT THAT I HAVE ACCESS TO THIS ROOM!!!!!!!!) September 20, 2001 September 22, 2001 2 days
FM-200100843 11/01 1/7/02 BROOKLAND PROVIDE THE FOLLOWING SAFETY VALVES, EXISTING VALVES WILL NOT RESET AND HOT WATER CONSTANTLY RUNS. SERIAL #715, MODEL: M-8-STD, WATTS: 21.22 3/4 #RD XL, SET: 150-PSI, MAX HRT, INPUT: TEMP, BTU/HR. RATING: 13.000, PRESS: STEAM BTU/HR. MB-V-ASME-777.600. HC-20000029. January 11, 2001 January 7, 2002 361 days
FM-200210651 02 7/15/02 (Brookland) Fire code violation: Page 1 of 1 Music Room: 1. Rear exit won't open Asbestos Code A - Clear for repairs, on 7/02/02 DCPS Safety - R. Edwards (RE- 7/02/02) July 1, 2002 July 15, 2002 14 days
FM-200216887 02 9/6/02 Brookland ****Very Urgent**** 2nd Floor Common Area Water supply line has a very heavy leak. September 6, 2002 September 6, 2002 0 days
FM-200217635 02 9/19/02 (Brookland) ***URGENT*** Shepherd Street side: Cylinder came completely out of the door located in the back of the building. September 17, 2002 September 19, 2002 2 days
FM-200223718 03 1/10/03 (Brookland) !!!VERY URGENT!!! 1st floor/Special Education room: Univent inoperable; unable to turn on, no heat. Repair or replace shaft and or shaft bearings in ceiling univent. January 10, 2003 January 10, 2003 0 days
FM-200210645 02 2/10/03 (Brookland) Fire code violation: Page 1 of 1 1. Asbestos assessment required. 3rd Floor/6th Gr: Water leaking near light. # Ceiling tile and duct sealant removal AMP Room 176. Code A Clear for Repair-Asbestos Abatement Date 07-26-02 confirmed by Leroy Minton, Jr. DCPS Safety-Sheila R. Howard 07-26-02. July 1, 2002 February 10, 2003 224 days
FM-200501297 05 5/9/05 Brookland First floor Ground floor exit door and 12th St. side exit door Need screws in the rear exit door closer on ground floor, and realign exit door located at 12th St. side exit door (unable to open 1 side). Asbestos Code A - Clear for repairs on 02/25/05. DCPS Safety - Leroy Minton Jr. (RG 02/25/05) February 7, 2005 May 9, 2005 91 days
FM-200225094 03 5/17/05 (Brookland) !!!VERY URGENT!!! Ground Floor/Cafeteria: There are three (3) large partitions to divide cafeteria in-to sections when needed. One partition is damaged, and unable to move; request these partitions be repaired, as rodents are nesting behind that broken partition. Asbestos Code A - Clear for repairs on 02/04/03. - If the track needs to be replaced or repaired, STOP WORK and contact DCPS Safety Office Horne Engineering - Troy Wilcome (RG 02/05/03) February 3, 2003 May 17, 2005 834 days
FM-200456936 /04 8/1/05 Brookland Exterior Grounds 1) Change safety rails. Poc - Oscar Mebane - 202-345-0688 October 18, 2004 August 1, 2005 287 days
FM-200450278 04 12/7/05 (Brookland) FIRE CODE VIOLATION: Asbestos Assessment Required. 3rd Floor/West Stairwell: Missing door closer Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Ricardo Eley (RG 07/22/04) July 14, 2004 December 7, 2005 511 days
FM-200450313 04 12/27/05 (Brookland) FIRE CODE VIOLATION: Asbestos Assessment Required. Basement/Boys Bathroom: Broken door closer. Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Ricardo Eley (RG 07/22/04) July 15, 2004 December 27, 2005 530 days
FM-200450322 04 12/27/05 (Brookland) FIRE CODE VIOLATION: Asbestos Assessment Required. Note: The above inspector's investigation reveals, school is experiencing a lot of ceiling leakage due to the large a/c unit on the roof. The leaking is heavy around piping, under a/c unit on roof, down through the ceiling to the 3rd, and 2nd floors of the schools. Asbestos Code A - Clear for repairs on 07/21/04. ( Repair of a/c unit ONLY ) DCPS Safety - Ricardo Eley (RG 07/22/04) DO NOT WORK ON CEILING July 15, 2004 December 27, 2005 530 days
FM-200450312 04 12/27/05 (Brookland) FIRE CODE VIOLATION: Asbestos Assessment Required. Basement/Computer Lab: Defective door closer to computer lab. Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Ricardo Eley (RG 07/22/04) July 15, 2004 December 27, 2005 530 days
FM-200450277 04 12/27/05 (Brookland) FIRE CODE VIOLATION: Asbestos Assessment Required. Door to Roof: Hardware missing. Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Ricardo Eley (RG 07/22/04) July 14, 2004 December 27, 2005 531 days
FM-200450269 04 12/27/05 (Brookland) FIRE CODE VIOLATION: Asbestos Assessment Required. 3rd Floor/Room #302-C: Breach in wall inside the above room. Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Ricardo Eley (RG 07/22/04) July 14, 2004 December 27, 2005 531 days
FM-200505937 05 2/21/06 (Brookland) "Urgent" First floor, front and rear exterior doors near principal's office. Repair or Replace exterior doors by trash bin, due deterioration. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) May 25, 2005 February 21, 2006 272 days
FM-200511710 05 4/11/06 Brookland Urgent First, Second, and Third Floors-Lobby, 2nd and 3rd FL. Common Areas Repair and /or Replace water fountains September 1, 2005 April 11, 2006 222 days
FM-200504721 05 5/17/06 Brookland - Pre K 1st floor, Center B 1st floor , Mrs. Pender room 1st floor , and Music room Ground floor. Replace missing ceiling tile in the above areas. Asbestos Code A - Clear for repairs on 04/27/05 by Leroy Minton Jr. to install missing ceiling tiles. DCPS Safety - Richard Gibson (RG) Please Note: Most of the white, 2' x 4' ceiling tiles throughout this facility are asbestos containing, However, the white, 2' x 4' ceiling tiles that need to be replaced are non-asbestos containing as they have been replaced not so long ago, apparently due to same same water damage/leaks in the past. Only replace the missing ceiling tiles. Any questions see Mr. Bibs, the building custodian. (Leroy Minton Jr.) April 26, 2005 May 17, 2006 386 days
FM-200450469 04 5/17/06 Brookland Kindergarden, Learning Center A Replace drip pan, size 57 1/4" X 4 1/4" in Learning Center A. Condensation is leaking on the carpet. URGENT !!!!! July 20, 2004 May 17, 2006 666 days
FM-200624297 06 6/21/06 Brookland 1st Floor Kgn Room Asbestos assessment required Repair rupture line on univent in Kgn. Room. Urgent !!!! Asbestos Code A - Clear for repairs on 06/13/06. Tidewater - Kenny Long (RG 06/14/06) SEE ASSESSMENTS June 14, 2006 June 21, 2006 7 days
FM-200626559 06 9/11/06 1st Floor- Kitchen Asbestos assessment required Repair leaking pipe in ceiling. It is damaging the floor. Asbestos Code A - Cleared for repairs on 08/01/06 by tidewater/Kenny Long (LM-08/01/06) Safety Office 202-576-8962. July 31, 2006 September 11, 2006 42 days
FM-200227848 03 9/26/06 Brookland Front lawn Install new marquee sign on front lawn of building. Asbestos Code A - Cleared for repairs on 04-22-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. March 28, 2003 September 26, 2006 1,278 days
FM-200618659 06 10/4/06 Very Urgent First Floor-Exit Door(left side) Hydraulic door closers need to be repaired or replaced February 14, 2006 October 4, 2006 232 days
FM-200517219 06 1/27/07 Brookland Pre-K NO HEAT URGENT Repair or replace univent motor. Pre-K children are cold classroom can not be used. January 7, 2006 January 27, 2007 385 days
FM-200515152 05 1/27/07 Urgent: Repair two urinals in the boys restroom and one urinal flush valve in the girls restroom on the third floor November 7, 2005 January 27, 2007 446 days
FM-200515151 05 1/30/07 Urgent: Power panel switch is broken on the second floor in the girls restroom hallway. November 7, 2005 January 30, 2007 449 days
FM-200511709 05 1/31/07 Brookland Urgent First Floor-Gr.FL. Exit Door and 12th St. Side Exit Door Repair/Replace door exit door located at 12th St. side slams close very quickly it is a very serious safety hazard. Code A-clear for repair by DCPS Charles Buchanan on 9/9/05 September 1, 2005 January 31, 2007 517 days