| Description | Open Date |
|---|---|
| FM-200227213 213 3/18/03 Brookland Boiler room URGENT Repair or replace electronic ignition on the Lochinvar domestic hot water heater in the boiler room unit is down and there is no hot water. | |
| FM-200333481 7/21/03 Brookland All purpose Room URGENT) Need plumber to locate and repair leak in the all purpose room over the electrical pannel box ( nature of leak unknown) Code A - Clear for repairs per Dr. Saeed Rahimi comfirmed (RG 10/01/03) | |
| FM-200458503 11/19/04 Brookland Main Roof Repair or replace (5) inoperable exhaust fan motors motor appears to be bad. No Nomenclature available. Urgent !!!! | |
| FM-200504041 4/14/05 (Brookland) !!!VERY URGENT!!! Asbestos Assessment Required. Cafeteria Area. Paint Black steps in cafeteria due mayor's visit . Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Leory Minton Jr.(RG 04/19/05) Note: This needs to be done before May 2, 2005. | |
| FM-200504630 4/25/05 Brookland Ground Floor Before and after care center Check duct work and pipe insulation mold spores. Asbestos Code A - Clear for repairs on 04/27/05 by Leroy Minton Jr. to install missing ceiling tiles. DCPS Safety - Richard Gibson (RG) | |
| FM-200504668 4/25/05 Brookland 1st floor Mrs. Pender , Before and after care center 1) Replace 3' of 2" , 3/4" , 1-1/2" Thermo insulation on the supply line of unit in the ceiling. 2) Replace 1' of 1" supply insulation, elbow, union , pneumatic valve. Asbestos Code A - Clear for repairs on 04/27/05 by Leroy Minton Jr. to install missing ceiling tiles. DCPS Safety - Richard Gibson (RG) Please Note: Most of the white, 2' x 4' ceiling tiles throughout this facility are asbestos containing, However, the white, 2' x 4' ceiling tiles that need to be replaced are non-asbestos containing as they have been replaced not so long ago, apparently due to same same water damage/leaks in the past. Only replace the missing ceiling tiles. The ceiling tiles in the Before & After Care Center have all been previously replaced and are non-sabestos containing. Any questions see Mr. Bibs, the building custodian. (Leroy Minton Jr.) | |
| FM-200515150 11/7/05 Urgent: Repair two urinals in the boys restroom on the second floor. | |
| FM-200515464 11/15/05 Urgent: Repair/Replace two urinals in the boys bathroom on the third floor, they are broken. | |
| FM-200515466 11/15/05 Urgent: Repair/Replace one flush valve in the girls bathroom on the third floor, its broken | |
| FM-200622108 5/2/06 Brookland Boiler Room Repair or replace domestic hot water tanks A.O.Smith 50 gallon tanks. There are two tanks leaking from bottom. Urgent !!!! | |
| FM-200622457 5/11/06 Brookland Ground Level and 1st Floor Asbestos assessment required Remove insolation on in-line strainers to air handler and /or ceiling mounted cooling unit. Appears to have flow problems. Approx. (2) units on ground level (15) units on 1st floor. Urgent !!!! Asbestos Code A - Clear for repairs on 05/12/06 Tidewater - Kenny Long (RG 05/15/06) | |
| FM-200624241 6/13/06 Brookland Boiler Room Unstop drain by domestic hot water heater in Boiler Room. Water on Boiler Room floor. Urgent !!!! | |
| FM-200632220 0632220 11/14/06 Repair or replace safety releif valve, leaking not seating on Boiler #1. Certifield by watts regulator Serial #01390 Model #M174A 2" 30lbs BTU3815000 | |
| FM-200633309 0633309 12/14/06 Need welders to fabricate and install catch basin in rear of building near playground. Note: The existing catch basin is in danger of collapsing when stepped on by children. | |
| FM-200700165 0700165 2/2/07 Basement - Boiler Room - # 2 boiler down - Blower fan housing is not working . Causes the burner to go into safety lockout. Trips breaker out send boiler into safety and shuts boiler down. Will not run. # 1 boiler on line and running. |