Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Aiton Elementary School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200110834 01 10/12/01 (AITON) "VERY URGENT" STAIRWELL CLOSE TO ELEVATOR: NO ELECTRICITY IN STAIRWELL NEAR ELEVATOR. ALL LIGHTS ARE OUT FROM THE 1ST TO THE 4TH FLOOR. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/23/01. May 23, 2001 October 12, 2001 142 days
FM-200109994 01 11/2/01 AITON ROOF SECURE FLASHING TO FRONT OF BUILDING. PIECE IS APPROXIMATELY 12 FEET IN LENGTH AND HAS COMPLETELY SEPARATED FROM BUILDING. DAMAGE AND SAFETY HAZARD. May 10, 2001 November 2, 2001 176 days
FM-200123784 /01 12/6/01 AITON PARKING LOT ROLLING GATE NEEDS REPAIR. IT WILL NOT CLOSE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/26/01. RICHARD GIBSON - SAFETY (202)576-5584 (RG) November 26, 2001 December 6, 2001 10 days
FM-200123679 /01 1/29/02 (AITON) ASBESTOS ASSESSMENT REQUIRED 3RD & 4TH FLOORS/CUSTODIAN CLOSET REPLACE FAUCETS IN CUSTODIAN CLOSET ON 3RD AND 4TH FLOORS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/20/01. SYLVIA GRIMES - SAFETY (202)576-5583 (RG) November 20, 2001 January 29, 2002 70 days
FM-200121710 /01 1/30/02 (AITON) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ KINDERGARDEN #1 REPLACE MISSING FIRE DOOR TO CLASSROOM. THERE IS NO DOOR ON SITE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/20/01. SYLVIA GRIMES - SAFETY (202)576-5583 (RG) October 16, 2001 January 30, 2002 106 days
FM-200126875 02 2/4/02 (AITON) FIRE CODE VIOLATION: PAGE (1 OF 4) 4TH FLOOR/MS. SHEARD: DOOR NEEDS HARDWARE AND ADJUSTING. CODE A CLEAR FOR REPAIR-DCPS SAFETY RONALD EDWARDS 01-11-02 (SRH) January 7, 2002 February 4, 2002 28 days
FM-200113530 01 2/20/02 AITON OUTSIDE CAFETERIA 1. ASBESTOS ASSESSMENT REQUIRED. NEED TO HAVE CAGES PUT AROUND AC UNITS IN CAFETERIA DUE TO VANDALISM BY KIDS THROWING ROCKS AT THEM AND STANDING ON TOP TO GET ON ROOF. CODE A -CLEAR FOR REPAIR BY DCPS SAFETY RONALD EDWARDS 01-11-02. (SRH) June 5, 2001 February 20, 2002 260 days
FM-200204945 02 4/1/02 Aiton Kitchen To unhook all equipment in the Kitchen to prepare for the movement of the equipment for the Spring break 2002 floor tile abatement. POC: William Moody (202) 439-8268 Asbestos Code A - Clear For Repairs On 03/26/02. DCPS Safety - Sheila R Howard (RG 03/26/02) March 26, 2002 April 1, 2002 6 days
FM-200202463 02 6/13/02 (AITON) 1. ASBESTOS ASSESSMENT REQUIRED. 3RD FLOOR/BOYS RESTROOM: REPLACE MISSING FIRE DOOR TO RESTROOM; THERE IS NO DOOR ON SITE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/22/02. DCPS - SAFETY - SHEILA R. HOWARD (RG 02/22/02) February 5, 2002 June 13, 2002 128 days
FM-200213937 02 8/20/02 Aiton ****Urgent**** 2nd & 3rd Floors/Teachers' Lounge & 3rd Floor Corridor 1. Replace leaking valve in the teachers' lounge; and 2. Repair/replace leaking water fountain in 3rd-floor corridor. August 9, 2002 August 20, 2002 11 days
FM-200214088 02 8/20/02 Aiton ****Urgent**** 1. Asbestos Assessment Reqd. 2nd Floor Teachers' Lounge Toilet 2. Repair/replace valve on commode--water is continuously running. August 12, 2002 August 20, 2002 8 days
FM-200214089 02 11/21/02 Aiton F-110.1 Fire Code Violation Room - 301 1) Hole in wall above T.V. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) August 12, 2002 November 21, 2002 101 days
FM-200225270 03 2/10/03 (Aiton) !!!URGENT!!! 1st Floor/Custodian office: Key will not turn in lock. February 5, 2003 February 10, 2003 5 days
FM-200337048 03 9/9/03 (Aiton) !!!EMERGENCY!!! All Bathrooms Through Out the Building: Scalding hot water running from sinks where students wash hands. Water is very hot, and staff has a concern for those who could be injured. (Burned) September 8, 2003 September 9, 2003 1 day
FM-200450383 04 8/19/04 (Aiton) FIRE CODE VIOLATION: Asbestos Assessment Required. 4th Floor/Room #410: Door missing. Asbestos Code A - Clear for repairs on 07/22/04. DCPS Safety - Leroy Minton Jr. (RG 07/28/04) July 16, 2004 August 19, 2004 34 days
FM-200450382 04 8/19/04 (Aiton) FIRE CODE VIOLATION: Asbestos Assessment Required. 4th Floor/Room #408: Door missing. Asbestos Code A - Clear for repairs on 07/22/04. DCPS Safety - Leroy Minton Jr. (RG 07/28/04) July 16, 2004 August 19, 2004 34 days
FM-200224882 03 9/22/04 Aiton Fourth floor - rooms 408 and 410 Door need repair / replace hardware. Asbestos Code A - Clear for repairs on 05/02/03. DCPS Safety - Richard Gibson - (RG 05/05/03) January 30, 2003 September 22, 2004 601 days
FM-200457238 /04 10/23/04 Aiton Kitchen-Locker Room Asbestos assessment required on tile floor of Kitchen Locker Room. Replace 3/4" nipple to leaking convertor in Kitchen Locker Room, can not be isolated. Urgent !!!!!! Code A-clear for repair by DCPS Charles buchanan on 10/25/04 October 21, 2004 October 23, 2004 2 days
FM-200457252 /04 12/7/04 (Aiton) !!!URGENT!!! Asbestos Assessment Required. 1st Floor/Room #103: Leaking from ceiling; bathroom above. Code A-clear for repair by DCPS Charles buchanan on 10/25/04 October 21, 2004 December 7, 2004 47 days
FM-200502732 05 6/6/05 Aiton URGENT!!!!! Head Start Rm 101 Repair Classroom Door March 15, 2005 June 6, 2005 83 days
FM-200456943 /04 8/1/05 Aiton Exterior Grounds 1) Change safety rails. Poc - Oscar Mebane - 202-345-0688 October 18, 2004 August 1, 2005 287 days
FM-200507550 05 9/6/05 !!!!URGENT!!!! First Floor - Hallway Water cooler fountain need to be repaired, it's stopped up and leaking. July 7, 2005 September 6, 2005 61 days
FM-200513864 /05 10/26/05 (Aiton) "Urgent" Playground Area. Unstop drain water stands on the playground.. October 14, 2005 October 26, 2005 12 days
FM-200450384 04 12/27/05 (Aiton) FIRE CODE VIOLATION: Asbestos Assessment Required. 1st Floor/Room #101: Door in need of repair. Asbestos Code A - Clear for repairs on 08/31/04. DCPS Safety - Richard Gibson ( 09/01/04 ) July 16, 2004 December 27, 2005 529 days
FM-200513501 05 2/14/06 Aiton Boiler Room Replace safety valve on Boiler #1 and #2 October 5, 2005 February 14, 2006 132 days
FM-200512627 05 3/21/06 (Aiton) "Urgent First floor, Pre K-1. Replace broken shut-off valve, toilet is constantly running. September 15, 2005 March 21, 2006 187 days
FM-200622375 06 8/9/06 Third Floor-Room 302: Install an electrical line for canon copier/Fax Machine. Asbestos Code A - Clear for repairs on 05/16/06. DCPS Safety - Leroy Minton Jr. (RG 05/17/06) May 9, 2006 August 9, 2006 92 days
FM-200511619 05 12/12/06 Aiton Very Urgent First Floor-Water fountain not working in the pre-k area August 30, 2005 December 12, 2006 469 days
FM-200516331 /05 12/12/06 Urgent: Unstop urinal in the boys restroom on the 4th floor. December 12, 2005 December 12, 2006 365 days
FM-200450162 04 1/5/07 Aiton Second and fourth floor A/C need to be replace in: 1 - second floor - bookroom 2 - second floor teacher lounge 3 - fourth floor room 405, 402, 403 and 410 Asbestos Code A - Clear for repairs on 07/22/04. DCPS Safety - Leroy Minton Jr. (RG 07/28/04) July 13, 2004 January 5, 2007 906 days
FM-200442464 04 1/5/07 (Aiton) !!!URGENT!!! Asbestos Assessment Required. 1st Floor/Main Office: Install outlets on left hand side of wall, as you enter office. Asbestos Code A - Clear for repairs on 01/08/04. Horne Engineering - Troy Wilcome (RG 01/12/04) January 9, 2004 January 5, 2007 1,092 days
FM-200202846 02 1/18/07 (AITON) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR CAFETERIA WELD BROKEN LEG ON CAFETERIA TABLE ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/12/02. RICHARD GIBSON - SAFETY (202)576-5584 February 12, 2002 January 18, 2007 1,801 days
FM-200620264 06 1/30/07 Urgent Replace door glass in stairwell 2 on the 4 floor Asbestos Code A on 03/27/06 Tidewater - Carlos Vera (RG 03/30/06) March 23, 2006 January 30, 2007 313 days
FM-200622347 06 3/7/07 Repair the stairs to the stage in the cafeteria on the first floor. Note: Someone may get hurt a sharp piece is sticking out. Asbestos Code A - Clear for repairs on 0/09/06. Tidewater - Kenny Long (RG 05/10/06) May 9, 2006 March 7, 2007 302 days