Urgent Open Repair Requests
See Also: All Open Repair Requests at Burrville Elementary School
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200217280 280 9/11/02 Burrville ****Urgent**** Asbestos Assessment Reqd. 1st Floor Research Room by Adult Learning Center The pipe insulation is breaking down and needs to be replaced because Asbestos Code A - Cleared for repairs on 12-02-02 ( LM / 12-02-02) Leroy Minton Jr. Safety Office 202-576-8962. the condensation is ruining the ceiling tiles. There is also a very strong, moldy odor coming from the tiles from the constant dampness. Asbestos Code A - Cleared for repairs on 09-23-02 (LM / 09-23-02) Leroy Minton Jr. Safety Office (202-576-8962). | |
| FM-200451473 8/4/04 (Burville) Asbestos Assessment Required. Repair carpet in the main office. Asbestos Code A - Clear for repairs on 09/02/04. DCPS Safety - Leroy Minton Jr. (RG 09/03/04) | |
| FM-200623711 6/1/06 Burrville Chiller Repair or replace start control on condenser water pump. Using standby pump, but it will not last. Urgent !!!! | |
| FM-200628476 8/30/06 Burrville Boiler Room Remove both safety valves and cup off and reinstall after hydrostaties is performed on Boiler #1 |
© The Washington Post Company
