Description Open Date
FM-200207572 5/10/02 Cardozo 1. Asbestos Assessment Reqd. 3rd Floor Room 302 [Band Room] Survey and assess for replacement of metal door & frame and locks. Both door and frame have been damaged, and the lock is sticking. and lock cylinder has been tampered with and needs replacement. Asbestos Code A - Clear for repairs on 05/16/02. DCPS Safety - Leroy Minton Jr. (RG 05/16/02) May 10, 2002
FM-200207573 5/10/02 Cardozo ****Urgent**** 1. Asbestos Assessment Reqd. Basement Auto Shop Furnish & install electrical service in storage room for computer connections--using power strip through the door opening. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 05/14/02 May 10, 2002
FM-200207574 5/10/02 Cardozo ****Urgent**** 1. Asbestos Assessment Reqd. Sub-basement Armory Furnish & install electrical service in storage room for computer connections--using extension cord. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 05/14/02 May 10, 2002
FM-200207576 5/10/02 Cardozo ****Urgent**** 1. Asbestos Assessment Reqd. Basement Tunnel by Parking Lot 1. Furnish & install a new metal door and frame for basement tunnel exterior door entrance [will need new heavy-duty security locks]. The old door, lock and door-frame has been damaged, and the frame is no longer firmly connected to the brick wall--it is out of square, making the door hard securely lock the door. Asbestos Code A - Clear for repairs on 05/16/02. DCPS Safety - Leroy Minton Jr. (RG 05/16/02) May 10, 2002
FM-200212933 7/25/02 Cardozo ****Urgent**** 1. Asbestos Assessment Reqd. Ground Floor Tunnel [Northwest Area] 2. Replace leaking galvanized domestic cold water pipes and valve. There are a total of five (5) each leaking pipes and/or stuck valves: 3 leaking pipes are 3/4" diameter 1 leaking pipe is 2" diameter 1 leaking pipe is 3" diamter Pipes are flooding the tunnel from the constant dripping---can not stop water flow at the valves. Asbestos code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 8/06/02 DCPS Charles Buchanan July 25, 2002
FM-200216441 9/4/02 Cardozo Asbestos Assessment Reqd. Basement Auto Shop Replace or repair electrical wiring for outside lighting on the parking lot for security and safety. Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) September 4, 2002
FM-200218147 9/24/02 Cardozo Asbestos Assessment Reqd. Basement & Ground Levels Rooms 1, 3, 11, 13 & Woodshop Furnish and install a/c units in computer labs and woodshop. Asbestos Code A - Clear for repairs on 10/18/02. DCPS Safety - Leroy Minton Jr. (RG 10/21/02) September 24, 2002
FM-200221239 11/19/02 Cardozo By girls gym rear steps- south east side Repair plaster walls and ceiling that has fallen from roof leak. Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Safety on 11/21/02 Charles E. Buchanan November 19, 2002
FM-200221256 11/19/02 Cardozo Hall east side Repair plaster wall that has an indention and cracks thru plaster. Asbestos Code A-clear for repair by Horne Engineer Sharon Voss DCPS Safety on 11/21/02 Charles E. Buchanan November 19, 2002
FM-200228251 4/3/03 Cardozo URGENT Ground hall Furnish and install electrical gang box receptacles at four (4) locations for security metal detectors and x-ray machines. Locatios: Northwest hall # 6, southwest hall by # 10, southeast hall by # 15 and northwest hall by # 9 two (2) duplex receptacles each. April 3, 2003
FM-200228252 4/3/03 Cardozo URGENT All exterior doors Replace pad locks and slide bolts. 1. Padlocks, master lock, Long shackley keyed a like (20) 2. Padlocks, master lock, keyed alike 1KA-2246 (20) 3. Slide bolts, large (24) 4. Screws, mounting box. April 3, 2003
FM-200228255 4/3/03 Cardozo URGENT Ground floor lobby doors Repair metal gate doors. Code A - Clear for repairs on 04/03/03. DCPS Safety - Richard Gibson (RG) April 3, 2003
FM-200228256 4/3/03 Cardozo URGENT First floor by room 109 REplace non working panic bar. April 3, 2003
FM-200338268 9/30/03 Cardozo Attic Over Auditorium 1) Assess ducts insulation. Code 'A' cleared for repairs 12/29/04. DCPS Safety R. Edwards (RE-12/29/04) Abatement conducted by EnviroBate Global; Air Monitoring conducted by USA Environmental Inc. Damaged asbestos duct insulation repaired and encapsulated. Debris cleanup from surrounding surfaces and encapsulation applied. DCPS Safety R. Edwards (RE-12/29/04) Note: Damage was caused by previous roof leak. Evidence of a form of roof repair is obvious from the excess tar that dripped onto the damaged duct surface. Recommend reinspection of the repaired area during inclement weather. (RE-DCPS Saftey) September 30, 2003
FM-200442295 1/6/04 (Cardozo) Ground Floor/Kitchen: Repair or replace ceramic floor tile that has become loose from adhesive and causing a safety hazard. Asbestos Code A - Clear for repairs on 03/09/04. Horne Engineering - Edward Rodriguez (RG 03/11/04) January 6, 2004
FM-200455027 9/17/04 (Cardozo) !!!URGENT!!! Through-out the Building: Twenty panes of glass needed for fire doors. September 17, 2004
FM-200455773 9/27/04 Cardozo Sub-basement pool area Repair leaking urinal leaking from back on wall. Asbestos Code A - Clear for repairs on 10/12/04. DCPS Safety -Leroy Minton Jr.(RG 10/12/04) September 27, 2004
FM-200501781 2/18/05 (Cardozo) HEALTH CODE VIOLATION: (EMERGENCY) Kitchen: Replace light bulbs, and light switches where needed. Pay attention to cooking, and walk-in freezer. Asbestos Code A - Clear for repairs on 02/22/05. DCPS Safety - Richard Gibson (RG) February 18, 2005
FM-200504253 4/19/05 (Cardozo) remove 2 old air conditioners that are no longer cooling and install 2 new air conditioners that are on site-electrical service in place. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Richard Gibson (RG) April 19, 2005
FM-200512204 9/9/05 Cardozo Urgent Foorball Stadium-Drain in dugout needs a cover September 9, 2005
FM-200512205 9/9/05 Cardozo Urgent Ground Floor-Coach Office Paint peeling from ceiling and wall Lead & Asbestos Code A - Clear for repairs on 10/28/05. Tidewater - Rodney Distance (RG 11/01/05) September 9, 2005
FM-200512382 9/12/05 (Cardozo) "Urgent" Science Labs & Second floor, Rooms 212-214. Replace drain traps in science labs that were removed during mercury spill, also replace faucets on sinks in classrooms 212 and 214. September 12, 2005
FM-200512863 9/20/05 Cardozo Very Urgent Check power, the electric keeps going out in the building September 20, 2005
FM-200513053 9/22/05 Cardozo Urgent Ground Floor-Rm. 11 Replace or Repair door lock September 22, 2005
FM-200513796 10/12/05 (Cardozo) "Urgent" Sub Basement, West Fan Room. Unstop neutralization tank drain pipe-needed for science classroom drainage. Note: Classes can not be held due to drain stoppages and bad odor. Asbestos Code A - Clear for repairs on 10/13/05. Tidewater - Rodney Distance (RG 10/14/05) October 12, 2005
FM-200514069 10/21/05 Cardozo Urgent First Floor-Boys Restroom Snake out 2 commodes. October 21, 2005
FM-200514127 10/22/05 Cardozo Urgent! Dugout and Stadium 1) Four showers not working, water hose bibbs need repair and 1 commode needs to be snaked out. October 22, 2005
FM-200515294 11/8/05 URGENT, GROUND FLOOR KITCHEN - REPLACE KITCHEN SINK FAUCET , DOMESTIC HOT AND COLD WATER VALVES ARE NOT WORKING , NO WATER FLOW . November 8, 2005
FM-200515653 11/21/05 Urgent: Repair or replace the water fountain in the nurse office on the first floor. The fountain does not work. November 21, 2005
FM-200517341 1/11/06 Nurse's Suite. "Urgent" Need plumbers to assess and repair problem, there is no hot water in the nurse's suite. Note: This is a matter of urgency. January 11, 2006
FM-200617982 1/27/06 First floor, Room 144/Supply closet. "Urgent" Repair or Replace broken electrical light switch, wires are exposed.. January 27, 2006
FM-200620364 3/27/06 First floor, Girls' Gymnasium. "Urgent Replace center muellion on gymnasium door. Asbestos Code A - Clear for repairs on 03/27/06. DCPS Safety - Richard Gibson (RG) March 27, 2006
FM-200620560 3/30/06 Ground floor, Gymnasium. "Urgent" Repair or Replace door hinges, currently the door is hanging of off the hinges. Note: This is a safety hazard. Asbestos Code A - Clear for repairs on 03/31/06. Tidewater - Kenny Long (RG 04/03/06) March 30, 2006
FM-200621850 4/26/06 CARDOZO - 3RD FLOOR,314A URGENT-DEAN OF STUDENTS OFFICE , REPLACE TWO LOCKS- ONE-ON INNER OFFICE DOOR( DOOR KNOB ), ONE - ON FRONT DOOR . DEAD BOLT LOCKS NOT WORKING . April 26, 2006
FM-200622187 5/2/06 3RD FLOOR, 306. URGENT- REPLACE OLD WOOD DOOR AND FRAME THAT IS DETERIORING-FRAME IS SPLITING AND HAS BEEN PIECED TOGETHER.CLASSROOM IS USED AS A COMPUTER ROOM . Asbestos Code A - Clear for repairs on 5/05/06. Tidewater - Tony Marcolin (RG 05/10/06) May 2, 2006
FM-200632400 11/21/06 CARDOZO- URGENT - POSSIBLE ELECTRICAL HAZZARD .THRU OUT BUILDING , REPLACE ELECTRICAL OUTLETS THAT HAVE PULLED AWAY FROM PLASTER WALLS IN CLASSROOMS-ANCHORS AND SCREWS ARE NO LONGER HOLDING OUTLET BOXES TO WALLS . PLASTER IS DETERIORATING THRU OUT THE BUILDING. November 21, 2006