Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Cooke H.D. Elementary School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200115528 01 9/25/01 H.D. COOKE SECOND FLOOR - ROOM 200 ASBESTOS ASSESSMENT REQD 1) DOOR WILL NOT CLOSE PROPERLY. SAFETY AND SECURITY HAZARD. ASBESTOS CODE A - ABATED ON 08/29/01. (SRH) July 21, 2001 September 25, 2001 66 days
FM-200120399 01 11/6/01 (COOKE, H.D.) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ ROOM 313 FAUCET LEAKS CONSTANTLY (WATER RUNNING). ASBEATOS CODE A - CLEAR FOR REPAIRS ON 9/24/01. LEROY MINTON - SAFETY (202)576-6691 (RG) September 24, 2001 November 6, 2001 43 days
FM-200122970 01 12/13/01 (COOKE, H.D.) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ SOUTH SIDE STAIRWELL D HALL AND STAIRWELL DOOR SLAMS SHUT. SAFETY HAZARD. ASBESTOS CODE A-CLEAR FOR REPAIR BY HORNE ENGINEER: SAM EBRAHIM November 6, 2001 December 13, 2001 37 days
FM-200116328 01 12/17/01 Cooke DCPS Remove window guard covering transome on entrance Requester Phone: 576-6397 Requestor Phone: 576-6397 CODE A-CLEAR FOR REPAIR BY DCPS SAFETY RE 8/7/01. July 31, 2001 December 17, 2001 139 days
FM-200201533 02 1/30/02 (COOKE,H.D.) ASBESTOS ASSESSMENT REQUIRED 2ND FLOOR PARENT CENTER AND TWO CLASSROOM DOORS PAINT DOOR LEADING TO PARENT CENTER POC: MR. PARKER (202)438-1455 ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/24/02 SHEILA HOWARD - SAFETY (202)576-5584 (RG)-01/24/02 January 23, 2002 January 30, 2002 7 days
FM-200113079 01 2/11/02 (COOKE, H.D.) 1. ASBESTOS ASSESSMENT REQUIRED. 2ND FLOOR/NEW PARENT CENTER: CARPENTER REMOVE COAT RACK FROM WALL, NEED PLASTER TO FINISH WALL. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/07/01. RONALD EDWARDS - SAFETY (202)576-669 (RG) June 11, 2001 February 11, 2002 245 days
FM-200124232 /01 2/13/02 (COOKE, H.D.) ASBESTOS ASSESSMENT REQUIRED 2ND & 3RD FLOORS/RMS 200, 205 & 307 PAINT NEW DOORS PLACED @ RMS 200, 205 & 307. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/04/01. RONALD EDWARDS - SAFETY (202)576-6693 (RG) November 30, 2001 February 13, 2002 75 days
FM-200202666 02 2/25/02 (COOKE,H.D.) ***URGENT*** 3RD FLOOR BOYS & GIRLS RESTROOMS IN NEW WING OF BUILDING 1) URINALS IN BOYS 3RD FLOOR RESTROOM NEEDS UNSTOPPING 2) TOILETS IN GIRLS 3RD FLOOR RESTROOM NEEDS SNAKING OUT February 8, 2002 February 25, 2002 17 days
FM-200202667 02 2/25/02 (COOKE,H.D.) ***URGENT*** BASEMENT LEVEL BOYS RESTROOM 1) SNAKE OUT TOILET IN BOYS RESTROOM 2) INSTALL "P" TRAP ON SINK AND REPLACE FAUCETS February 8, 2002 February 25, 2002 17 days
FM-200203529 02 4/23/02 (Cooke,H.D.) 3rd Floor Mens Restroom Unclog both toilets in the mens & principals restroom ASBESTOS CODE A - CLEAR FOR REPAIRS ON 03/06/02. RICHARD GIBSON - SAFETY (202)576-5584 (RG 03/06/02) February 27, 2002 April 23, 2002 55 days
FM-200210595 02 7/2/02 Cooke,H.D. ****Emergency**** 3rd Floor Hallway Electric Panel Box The panel box is emitting a sizzling sound like something frying inside---need someone to check [safety hazard]. June 28, 2002 July 2, 2002 4 days
FM-200215193 02 8/27/02 Cooke,H.D. ****Urgent**** Basement Girls' Restroom 3rd toilet on the left side has very low water pressure. Waste will not pass through the pipes. August 21, 2002 August 27, 2002 6 days
FM-200109699 01 9/12/02 COOKE, H.D. OUTSIDE - GROUNDS REPAIR RETAINING WALL OF SMALL-PLAYGROUND, WALL IS READY TO FALL. LOCATED ON EULID STREET SIDE OF PLAYGROUND. SAFETY HAZARD. May 8, 2001 September 12, 2002 492 days
FM-200213530 02 9/23/02 Cooke,H.D. Main Office Repair or replace 24,000 BTU window A/C unit. URGENT!!!!!! August 5, 2002 September 23, 2002 49 days
FM-200219725 /02 1/14/03 Cooke, H.D. - T-9 Large playground Remove broken part of metal basketball pole. Jaggededges left in ground. Safety Hazard October 21, 2002 January 14, 2003 85 days
FM-200219112 02 1/14/03 (Cooke, H.D.) 1. Asbestos assessment required. Basement/Room #107: Custodian office doors were broken into by fire dept; unale to secure custodian office and room #107. Asbestos Code A - Clear for repairs on 10/11/02. DCPS-Safety - Leroy Minton Jr. (RG 10/15/02) October 9, 2002 January 14, 2003 97 days
FM-200203349 02 2/14/03 (Cooke, H.D.) Asbestos assessment req. 2nd floor/ Northside stairwell Remove and replace wooden hand rail. Hand rail coming apart and injuring hands. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/25/02. HORNE ENGINEERIN - SHARON VOSS (RG 02/26/02) February 22, 2002 February 14, 2003 357 days
FM-200120403 01 2/24/03 (COOKE, H.D.) ASBESTOS ASSESSMENT REQ. HAND-RAIL COMING FROM WALL: RAIL NEEDS TO BE BOLT TO WALL. ASBEATOS CODE A - CLEAR FOR REPAIRS ON 9/24/01. LEROY MINTON - SAFETY (202)576-6691 (RG) September 24, 2001 February 24, 2003 518 days
FM-200221204 /02 3/26/03 Cooke, H.D. - T-9 Basement boys restroom Pipe leaking from ceiling. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Safety on 11/21/02 Charles E. Buchanan November 18, 2002 March 26, 2003 128 days
FM-200220303 /02 4/28/03 Cooke, H.D. - T-9 Driveway Repair or replace gate so it will close and lock. For safety, to keep cars from driving on playground. October 30, 2002 April 28, 2003 180 days
FM-200329639 03 5/7/03 (Cooke, H.D.) Playground/Equipment: New type slide, vandalized with many jaggered edges. (Safety hazard) May 6, 2003 May 7, 2003 1 day
FM-200455810 04 10/7/04 Cooke, HD First floor rooms 108 and 202 Electrical outlets need to be install in the room 108 . There are no outlets in the room 108 and a outlet for AC units need to be install. nd room 202 need outlet fo AC. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) September 27, 2004 October 7, 2004 10 days
FM-200119915 01 2/3/06 (COOKE, H.D.) ASBESTOS ASSESSMENT REQ. BASEMENT/ KITCHEN REMOVE SINGLE FACE BOWL AND INSTALL SLOP SINK. REQUEST IS FROM HEALTH CODE INSPECTORS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 September 17, 2001 February 3, 2006 1,600 days
FM-200124227 /01 2/3/06 (COOKE, H.D.) ASBESTOS ASSESSMENT REQUIRED 3RD & 2ND FLOOR 1) NEWLY HUNG DOORS IN BACK OF CLASSROOM 307; PUT GLASS PANES IN 2) COATROOM (2ND FLOOR-RM 200) NEEDS GLASS PANE PLACED IN NEWLY HUNG DOOR @ FRONT ENTRANCE ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/04/01. RONALD EDWARDS - SAFETY (202)576-6693 (RG) November 30, 2001 February 3, 2006 1,526 days
FM-200215215 02 9/13/06 Cooke,H.D. 1. Asbestos Assessment Reqd. 2nd Floor Classroom 200 2. When the new fire door was installed at classroom 200, no frame to hold the safety glass was installed and, therefore, we cannot see into the classroom. Install frame and safety glass in the new fire door. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) August 21, 2002 September 13, 2006 1,484 days
FM-200448119 04 9/13/06 Cooke, H.D. Boiler Room Repair or replace B & G Serial #100 Circulating pump motor for hot water. Motor is bad. No hot water in Building. Urgent !!!! May 19, 2004 September 13, 2006 847 days
FM-200443396 04 9/13/06 Cooke, H.D. Multi-purpose Room Repair 1 1/2" leaking return line. Urgent !! January 30, 2004 September 13, 2006 957 days
FM-200330320 03 9/13/06 (Cooke, H.D.) !!!VERY URGENT!!! 2nd Floor/Parent Center: Drains backing up, Hot water running downstairs in the custodial office, flooding the floors. May 19, 2003 September 13, 2006 1,213 days
FM-200226941 03 9/13/06 (Cooke, H.D.) !!!URGENT!!! Room #213: Very old door has fallen, and removed from the area. (This is a very old door that did not require hinges, door is held by pins) Asbestos Code A-clear for repair by DCPS charles Buchanan on 3/19/03 March 12, 2003 September 13, 2006 1,281 days
FM-200226873 03 9/13/06 (Cooke, H.D.) !!!IURGENT!!! New side/Room #213: Replace or remount class room door that has fallen off door frame. Concern for Pre-K students walking through this door. Asbestos Code A - Clear for repairs on 03/12/03. Hone Engineering - Bipin Nanavaty (RG 03/13/03) March 11, 2003 September 13, 2006 1,282 days
FM-200221206 /02 9/13/06 Cooke, H.D. - T-9 Basement stage Pipe leaking from ceiling. The ceiling is leaking water on stage, causing damage to the floor. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Safety on 11/21/02 Charles E. Buchanan November 18, 2002 September 13, 2006 1,395 days
FM-200221150 /02 9/13/06 Cooke, H.D. Third floor - Room 303 Re-anchor electrical outlet to wall. Outlet hasbeen pull from wall. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Safety on 11/21/02 Charles E. Buchanan November 18, 2002 September 13, 2006 1,395 days
FM-200220909 /02 9/13/06 Cooke, H.D. - T-9 Ground floor - Hall South side 12 x 12 tile is breakin-up, three pieces missing has left a hole in floor. Safety Hazard in hall. Asbestos Code A-clear for repair by Horne Engineer Troy Wilcome on 11/15/02 DCPS Charles E. Buchanan November 13, 2002 September 13, 2006 1,400 days
FM-200220512 02 9/13/06 Cooke, H.D. T-9 First floor new wing exit hall Flourescent light fixture has electrical malfunction. Exit hallway is dark causing a safety and security risk. November 1, 2002 September 13, 2006 1,412 days
FM-200218791 02 9/13/06 Cooke, H.D. Basement - Girls bathroom Repair ceiling and area about one foot by two feet has fallen due to age. Asbestos Code A - Clear for repairs on 10/16/02. DCPS-Safety - Leroy Minton Jr. (RG 10/17/02) October 3, 2002 September 13, 2006 1,441 days
FM-200218123 02 9/13/06 Cooke,H.D. Asbestos Assessment Reqd. 2nd Floor Room 201 The entrance door does not close properly---the door is not level. Asbestos Code A - Cleared for repairs on 02-04-03 by Leroy Minton Jr (LM/02-05-03) Safety Office (202) 576-8962. September 23, 2002 September 13, 2006 1,451 days
FM-200217283 02 9/13/06 Cooke, H.D. Asbestos Assessment Req. Basement Art Room 102 Install electric outlet for a kiln [pottery oven] 34x29x31/voltage & phase 208 sp. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. September 11, 2002 September 13, 2006 1,463 days
FM-200505922 05 9/13/06 (Cooke, H.D.) "Urgent" First floor, Cafeteria/Auditorium. Remove curtains from H.D. Cooke and hang them at K.C. Lewis, where H.D. Cooke is now being housed. Note: Need by June 1, 2005. May 24, 2005 September 13, 2006 477 days
FM-200212296 02 9/13/06 Cooke,H.D. Library Exterior The handrail on the outside of the library is detached from the cement base in four places posing a safety problem. If someone happens to lean on the rail--they might fall and injure themselves. Asbestos Code A - Clear for repairs on 01/31/03. Horne Engineering - Troy Wilcome (RG 02/04/03) July 16, 2002 September 13, 2006 1,520 days