Urgent Open Repair Requests

See Also: All Open Repair Requests at Coolidge High School

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200216065 65 8/28/02 Coolidge/Frank Williams Center ***Urgent**** Roof leak is coming through the gym ceiling when it rains, and causing a leaking problem in room 316. The cause of the roof leak has not been identified. The fall school session starts on next Tuesday and we would like the problem not to expand into other areas. August 28, 2002
FM-200216149 49 8/29/02 (Coolidge) ***Urgent*** Front side of building/3rd Floor: Water leaking from roof down in-to room #309. August 29, 2002
FM-200444523 2/27/04 Coolidge First floor Please repair or replace the floor in the following areas: Rooms 109-118-126 and armory damage from leas new theating unit were install by contractor or contruction. Please inforce these major concerns as emergency. Safety hazard Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Bipin Nanavaty (RG 03/01/04) February 27, 2004
FM-200444860 3/5/04 Coolidge Tunnel Area Repair or replace 1 1/2" busted steam supply line in tunnel. Pipe is leaking under electrical vault and several classrooms do not have heat. Urgent !!! March 5, 2004
FM-200448005 5/17/04 Coolidge Room #113 Install on site window A/C unit in classroom window. Iron grate needs to be cut and support brackets need to be fabricated by welders. (1) 12,000 BTU's unit on site. Provide electrical up-grade Urgent !!!!! May 17, 2004
FM-200451111 7/29/04 (Coolidge) !!!VERY URGENT!!! Asbestos Assessment Required. 3rd Floor/Hallway Leaking from roof into 3rd floor hallway. Asbestos Code A - Clear for repairs on 08/11/04. DCPS Safety - Leroy Minton Jr. (RG 08/17/04) July 29, 2004
FM-200458274 11/15/04 Coolidge Frank Williams center Electronic scroeborad in new gym not working need electrical person- connection checked on replaced system needed for basketball games. URGENT November 15, 2004
FM-200460019 12/23/04 COOLIDGE SECOND & THIRD FL. RMS.217, 222,316, & 318 REPAIR OR REPLACE FLOORS IN ABOVE ROOMS. Code A - Clear for repairs on 04/07/05 by Leroy Minton Jr. (LM/04-07-05) Safety Office 202-576-8962. December 23, 2004
FM-200500222 1/7/05 Coolidge Throughout bldg. Total doors replacement of all classroom doors and locks. Asbestos Code A - Clear for repairs on 06/27/05. DCPS Safety - Leroy Minton Jr. (RG 06/27/05) January 7, 2005
FM-200502015 2/25/05 Coolidge Gym Replace light ballast, fuses to 10 light fixtures. Asbestos Code A - Clear for repairs on 03/04/05. DCPS Safety - Charles Buchanan (RG 03/04/05) February 25, 2005
FM-200505184 5/6/05 Coolidge Bookroom Install four 3-inch shut off valves on 4 gas lines located in Book Room on ground floor to be used to isolate areas of the building in case of emergency. Urgent !!!! May 6, 2005
FM-200514065 10/21/05 Coolidge Urgent Repair Wall Coplin Fell Down From the Roof By The Roof Drain Down By The Dumpster. October 21, 2005
FM-200516039 12/5/05 Sub-Basement - Women Custodial Locker Room - Roof Repairs - Ceiling collapsed,walls and lockers are being deteriorate,ceiling lights in danger of shorting from water. Asbestos Code A - Clear for repairs on 12/05/05. Tidewater - Philp Connolly (RG 12/19/05) December 5, 2005
FM-200618619 2/13/06 Very Urgent Third Floor-Rm. 300 (Storage Closet) Investigate and repair the roof leak, roof drains may be clogged. February 13, 2006
FM-200619974 3/15/06 Very Urgent Replace broken exterior door glasses throughout the frank williams center March 15, 2006