Urgent Open Repair Requests
See Also: All Open Repair Requests at Davis Elementary School
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200444006 2/12/04 Davis Basement Lunchroom Repair broken bench on two lunchroom tables. Asbestos Code A - Clear for repairs on 02/12/04. DCPS Safety - Richard Gibson (RG 02/12/04) | |
| FM-200451029 7/28/04 Davis Second floor new wing bricks court yard Safety hazard for childred outside bricks need to be pointed, when it rain water comes through the wall and go down the steps. | |
| FM-200455465 9/22/04 Davis. URGENT Roof Unclog two drains on roof. | |
| FM-200456483 10/5/04 Davis First floor auditorium Side wall need to be repaired, big pieces of plaster is falling off the wall. Supervisor need to check this request. Asbestos Code A - Clear for repairs on 10/05/03. DCPS Safety - Leroy Minton (RG 10/06/04) | |
| FM-200503807 4/11/05 ( DAVIS ) Second Floor - New wing bricks courtyard 1) Safety hazard for children outside bricks need to be pointed when it rain water comes through the wall and go down the steps. | |
| FM-200510929 8/23/05 (Davis) Asbestos Assessment Required. First floor, Principal's office. Install carpet in principal's office. Asbestos Code A - Clear for repairs on 08/23/05. DCPS Safety - Richard Gibson (RG) | |
| FM-200511419 8/26/05 (Davis) "Urgent" Asbestos Assessment Required. Basement, Art room # 16. Replace ceiling tile due to bad leak. Asbestos Code A - Clear for repairs on 08/26/05. DCPS Safety - Richard Gibson (RG) | |
| FM-200511421 8/26/05 (Davis) "Emergency" Basement, Room #114. Door broke off hinges and fell. Note: Safety hazard ! Asbestos Code A - Clear for repairs on 08/26/05. Tidewater - Rodney Distance (RG 08/30/05) | |
| FM-200512626 9/15/05 Davis Urgent Asbestos Assessment Required Basement-Art Room Replace 2x4 ceiling tiles Pipe in ceiling has been repaired Asbestos Code A - Clear for repairs on 09/15/05. DCPS Safety - Richard Gibson (RG) |