Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Deal Junior High School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200106626 01 8/30/01 DEAL GIRLS GYM AND BOYS GYMNASIUM 1) ASBESTOS ASSESSMENT REQUIRED 2) INSPECT LEAKS TO LACATE ORIGIN - GIRLS GYMNASIUM LEAKING ON WALL IN SW CORNER OF GYM AND WEST WALL BOYS GYM LEAKING AT EAST WALL. POSSIBLE GUTTER DAMAGE. SAFETY HAZARD. ASBESTOS CODE A- CLEAR FOR REPAIRS ON 04/24/01. March 26, 2001 August 30, 2001 157 days
FM-200100502 01 10/9/01 DEAL SCHOOL GIRLS GYMNASIUM REPLACE WIRE MESH SAFETY GLASS TRANSOM ABOVE GIRLS GYMNASIUM ENTRANCE. January 9, 2001 October 9, 2001 273 days
FM-200123000 01 11/9/01 DEAL OUTSIDE - PLAYGROUND BACKBOARD IS LENDING OVER (BENT) ON PLAYGROUND AND IT MIGHT FALL ON SOMEONE. SAFETY HAZARD!!!! ISOLATE EMERGENCY!!!! November 6, 2001 November 9, 2001 3 days
FM-200102549 01 11/27/01 DEAL FIRST (1ST) FLOOR - CORRIDOR NEAR ROOM 102 AND BOYS GYMNASIUM ENTRANCE REPLACE EXIT SIGN. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/18/01. RONALD EDWARDS - SAFETY (202)576-6693 January 31, 2001 November 27, 2001 300 days
FM-200101178 01 12/18/01 DEAL FIRST (1ST) AND SECOND (2ND) FLOOR LANDING STAIRWELL. NEW WING REAR ASBESTOS ASSESSMENT REQUIRED. FURNISH AND INSTALL 12 X 12 FLOOR TILE ON STAIRWELL LANDING HAD A FIRE IN ARE 6/2000. SAFETY HAZARD. ASBESTOS CODE A-CLEAR FOR REPAIRS BY 10/18/01 HORNE ENGINEER : SHARON VOSS January 12, 2001 December 18, 2001 340 days
FM-200127142 02 1/16/02 (DEAL) 1ST FLOOR/ ROOM 110 B !!! EMERGENCY !!! TV MONITOR FELL OFF WALL. WALL WAS FOUND SATURATED WITH MOISTURE POSSIBLY FROM TUNNEL AREA DUE TO UNINSULATED PIPES. SAFETY CONCERNS BECAUSE OTHER MONITORS COULD FALL AND INJURE A STUDENT PREVIOUS W/O SUBMITTED INDICATING POSSIBLE SAFETY CONCERNS DUE TO UNINSULATED PIPES. January 9, 2002 January 16, 2002 7 days
FM-200123083 01 2/4/02 (DEAL) EXTERIOR REMOVE AND CLEAN ALL OVER GROWTH AND BUSHES FROM FENCE ON FIELD, THIS CAUSES A SAFETY HAZARD WITH THE KIDS. November 7, 2001 February 4, 2002 89 days
FM-200111375 01 2/4/02 DEAL BASEMENT KITCHEN 1) REPAIR SCALDING WATER APPARATUS INSUFFICIENT HOT WATER WATER NOT HOT ENOUGH TO CLEAN ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/05/01. LEROY MINTON - SAFETY (202)576-6691 May 29, 2001 February 4, 2002 251 days
FM-200205720 02 4/16/02 Deal ****Urgent**** 3rd Floor Boys Gymnasium The exit sign at the entrance to the boys gym is falling, creating a safety hazard. April 11, 2002 April 16, 2002 5 days
FM-200206163 02 4/29/02 (Deal) !!!Very Very Urgent!!! Main office,2nd & 3rd floor stairwells:: Restore lights in these areas; problem due to storm today. April 19, 2002 April 29, 2002 10 days
FM-200205391 02 4/30/02 (Deal) 1. Asbestos assessment required. Basement/kitchen: Connect electric wiring to newly installed garbage disposal. ASBESTOS CODE A - Clear for repairs on 04/11/02. DCPS Safety - Ronald Edwards (RG-04/11/02) April 3, 2002 April 30, 2002 27 days
FM-200205426 02 5/6/02 (Deal) 1. Asbestos assessment required. 1st floor/boys bathroom: Repair urinal in boys bathroom; urinal is stopped up. The in-house staff attempted to unstop with K-50 for (1) hour. Not successful. Asbestos Code A - Clear For Repairs On 04/04/02. DCPS Safety - Richard Gibson(RG 04/04/02) April 4, 2002 May 6, 2002 32 days
FM-200205395 02 5/7/02 (Deal) 1. Asbestos assessment required. 2nd and 3rd floor/room #226 & 228: Repair/replace water coolers in the above areas; coolers are leaking. ASBESTOS CODE A - Clear for repairs on 04/11/02. DCPS Safety - Ronald Edwards (RG-04/11/02) April 3, 2002 May 7, 2002 34 days
FM-200207230 02 6/3/02 Deal 3rd Floor Girls' Restroom Replace extention drain line under sink. The line is rusted and both sinks cannot be used. Asbestos Code A - Clear for repairs on 05/07/02. DCPS Safety - Richard Gibson (RG) May 6, 2002 June 3, 2002 28 days
FM-200208361 02 6/3/02 Deal !!! Emergency !!! Outside - Rear of the Playground Handrail is broken and need the welder to come. Sharp jag edge is sticking out. Student hurt themself. Health and Safety Hazard. May 23, 2002 June 3, 2002 11 days
FM-200209007 02 6/12/02 (Deal) Fire code violation: Page 2 of 3 1. Asbestos assessment required. 2nd Floor/Room #206: Door closer broken on exit door next to room #206. Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG) June 5, 2002 June 12, 2002 7 days
FM-200209049 02 6/12/02 (Deal) Fire code violation; Page 3 of 3 Basement Kitchen/Cafeteria: Door closer broken on door. Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG 06/06/02) June 5, 2002 June 12, 2002 7 days
FM-200208991 02 6/12/02 (Deal) Fire code violation: Page 1 of 3 1. Asbestos assessment required. 3rd Floor/Girls gym: Light fixture broken; electrical hazard. Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG) June 5, 2002 June 12, 2002 7 days
FM-200208997 02 6/12/02 (Deal) Fire code violation: Page 1 of 3 1. Asbestos assessment required. 3rd Floor/New wing: Door closer broken in room #326. Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG) June 5, 2002 June 12, 2002 7 days
FM-200209005 02 6/12/02 (Deal) Fire code violation: Page 2 of 3 3rd Floor/New wing: Lock broken on door in room #322. Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG) June 5, 2002 June 12, 2002 7 days
FM-200209037 02 6/12/02 2-Damaged Floor Fire code violation: Page 2 of 3 1. Asbestos assessment required. 2nd Floor: Exit light out next to room #203 Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG) June 5, 2002 June 12, 2002 7 days
FM-200210404 02 7/5/02 (Deal) ****Very Very Urgent**** 2nd Floor/Room #206: Light ballast leaking hazardous fluid; unable to have class in that area. (Leaking fluid has very bad odor) Asbsetos Code A - Clear for repairs on 6/27/02 DCPS Safety, L. Minton (RE - 6/27/02 June 26, 2002 July 5, 2002 9 days
FM-200206957 02 7/15/02 1. Asbestos assessment required. 2nd floor/corridor by Rm. #203: Exit sign and emergency lights are out; unable to locate cause. Asbestos Code A - Clear for repairs on 05/02/02. DCPS Safety - Ronald Edwards (RG 05/03/02) May 1, 2002 July 15, 2002 75 days
FM-200212525 02 7/26/02 Deal ****Urgent**** 1st & 2nd Floor Corridors Exit signs and emergency lights are out---fuse stat blows whenever replaced. Need electrician to check and correct problem. July 22, 2002 July 26, 2002 4 days
FM-200208994 02 8/2/02 (Deal) Fire code violation: Page 1 of 3 1. Asbestos assessment required. 2nd Floor: Breech in wall; work order in for repair. Asbestos Code A - Clear for repairs on 06/05/02. DCPS Safety - Leroy Minton Jr. (RG) June 5, 2002 August 2, 2002 58 days
FM-200224093 03 1/17/03 (Deal) !!!VERY URGENT!!! 3rd Floor/Boys Gym: Install temporary lighting. January 16, 2003 January 17, 2003 1 day
FM-200205398 02 3/11/03 (Deal) 1. Asbestos assessment required. 3rd floor/girls gym: A few ceiling tiles are hanging loosely from ceiling. Safety concern is tile could fall and injure a student, also, tile may be asbestos containing materials. Code A-clear for repair by Honre Engineer ( Roger Kager ) on 4/05/02 April 3, 2002 March 11, 2003 342 days
FM-200204037 02 3/26/03 Deal Basement/ Boiler Room Repair or replace 3" steam line with hole in it. Leaking very badly. No insulation in this area. Code A-clear for repair by DCPS Safety Charles Buchanan ( ) on 3/15/02 (CEB) March 7, 2002 March 26, 2003 384 days
FM-200329321 03 5/15/03 Deal Exterior field Replace top railing and missing poles to fence. Someone came over fence entered school from playground door. Safety issue. May 1, 2003 May 15, 2003 14 days
FM-200206092 02 5/29/03 (Deal) !!!!!!!Very Urgent!!!!!! 2nd floor/room #203: Ballast burning; Engineer turned lights off because of electrical smell. Asbestos Code A - Clear for repairs on 4/19/02 Horne Engineering - Sam Ebrahim (RE) April 18, 2002 May 29, 2003 406 days
FM-200332807 03 7/31/03 (Deal) FIRE CODE VIOLATION: Room #200: Door not closing properly. Code A-clear for repair by Charles Buchanan Safety Office on 7/16/03 July 1, 2003 July 31, 2003 30 days
FM-200338130 03 3/1/04 Deal First, second and third floor corridors (new wing) Emergency lights out and one exit sign (2nd floor). Total of lights out 8.Rewire fluorescent fixtures. Insulation on wires brittle and sparking. Replace incadescent fixtures in basement corridor. Safety issue (no lights at bottom of stairs. Asbestos Code A - Clear for repairs on 09/29/03. Horne Engineering - Edward Rodriguez (RG 10/01/03) September 29, 2003 March 1, 2004 154 days
FM-200217287 02 3/5/04 Deal ****Urgent**** Asbestos Assessment Reqd. Stairwell Near Rooms 102 & 203 Repair damaged electrical conduit in the ceiling near room 102 that controls the exit lights on the stairwell by rooms 102 & 203. [Conduit was damaged when Verizon personnel were drilling into the floor. POC: Wilson Hill (Proj. Field Mgr.) Ray Clayton (Proj. Mgr.) 410-271-1257 Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. September 11, 2002 March 5, 2004 541 days
FM-200338128 03 3/5/04 Deal First floor main office and basement corridor Rewire fluorescent fixtures. Insulation on wires brittle and sparking. Replace incadescent fixtures in basement corridor. Safety issue (no lights at bottom of stairs. Asbestos Code A - Clear for repairs on 09/29/03. Horne Engineering - Edward Rodriguez (RG 10/01/03) September 29, 2003 March 5, 2004 158 days
FM-200203690 02 3/6/04 (Deal) ***Urgent*** Outside Grounds Exterior lights are out--need repair. February 28, 2002 March 6, 2004 737 days
FM-200209357 02 3/6/04 Deal ****Urgent**** 1. Asbestos Assessment Reqd. 3rd Floor Boys' Gymnasium 2. Move existing outlet closer to the a/c unit----an extension cord [FCV] is currently in use. Asbestos code A - Clear for repairs, on 6/17/02 DCPS Safety, R. Edwards, (RE - 6/17/02) June 12, 2002 March 6, 2004 633 days
FM-200446066 04 4/6/04 Alice Deal School Weld iron to backboard and pole for support Asbestos Code A - Clear for repairs on 03/30/04. DCPS Safety - Richard Gibson (RG) March 30, 2004 April 6, 2004 7 days
FM-200454041 04 12/8/04 Deal First and second floor boys restroom. auditorium and corridors Replace door closers (missing parts). No closers on site. Asbestos Code A - Clear for repairs on 09/13/04. DCPS Safety - Leroy Minton Jr. (RG 09/16/04) September 8, 2004 December 8, 2004 91 days
FM-200454946 04 12/23/04 Deal Fire Code Violation Exit light not illuminated (Boys gym)(girls gym). Asbestos Code A - Clear for repairs on 09/20/04. DCPS Safety - Richard Gibson. (RG) September 16, 2004 December 23, 2004 98 days
FM-200454947 04 12/23/04 Deal Fire Code Violation Exit light not illuminated (rear exit) throughout. Asbestos Code A - Clear for repairs on 09/20/04. DCPS Safety - Richard Gibson. (RG) September 16, 2004 December 23, 2004 98 days
FM-200458507 /04 1/27/05 Deal Custodian Closet-Basement Asbestos assessment required Repair steam leak in custodian closet in basement within cafeteria. Water is leaking bad. Urgent !!!! November 19, 2004 January 27, 2005 69 days
FM-200459293 04 1/27/05 Deal Room #126 Asbestos assessment required on ceiling tile. Repair or replace busted union on a 2 inch steam line leaking very bad inside class room #126. Emergency Area Asbestos Code A - Clear for repairs on 12/16/04. DCPS Safety - Leroy Minton Jr. (RG12/16/04) December 7, 2004 January 27, 2005 51 days
FM-200503269 05 4/11/05 (Deal) "Urgent" First, Second floor/ Rooms 105, 112, 212, Nurse's office. Repair or Replace locks, door knobs and handles, cannot secure doors. Note: The light fixtures take screw in bulbs, the piece that you screw the the bulbs in are missing. March 25, 2005 April 11, 2005 17 days
FM-200101176 01 7/22/05 DEAL GYMNASIUM - SECOND (2ND) FLOOR REPAIR OR REPLACE LIGHT FIXTURES IN BOTH GYMNASIUM, BOYS AND GIRLS. THE LIGHTING IS VERY DARK. GYMNASIUMS FOR BOYS AND GIRLS LIGHTING IS A SAFETY HAZARD. ASBESTOS ASSESSMENT REQUIRED. January 9, 2001 July 22, 2005 1,655 days
FM-200101183 01 7/22/05 DEAL NEW WING GYMNASIUM - SECOND (2ND) FLOOR BOYS AND GIRLS REPLACE CEILING TILES. TILES ARE OLD AND FALLING. (GLUED TO CONCRETE). SAFETY HAZARD. ASBESTOS ASSESSMENT REQUIRED January 12, 2001 July 22, 2005 1,652 days
FM-200106628 01 7/27/05 DEAL EAST TUNNEL 1) ASBESTOS ASSESSMENT REQUIRED 2) SURVEY LEAK IN TUNNEL. POSSIBLY CAUSING WATER SEEPAGE IN CAFETERIA STORAGE AREA. Asbestos Code A - Cleared for repairs on 03-18-03 by Leroy Minton Jr. (LM/03-18-03) Safety Office 202-576-8962. March 26, 2001 July 27, 2005 1,584 days
FM-200513727 /05 10/11/05 (Deal) "Urgent" Kitchen Area. Restore power to oven and stove. October 11, 2005 October 11, 2005 0 days
FM-200219563 /02 10/18/05 Deal Kitchen Repair the following items: 1.) Kitchen - sink leaking (trap and supply line). 2.) Cafeteria - dish washing area supply line leaking. 3.) Girl's restroom by room 208 has urinal hit in two commodes. Asbestos Code A - Cleared for repairs on 10-23-02 (LM 10/24/02) Leroy Minton Jr. Safety Office 202-576-8962. October 17, 2002 October 18, 2005 1,097 days
FM-200217288 02 10/27/05 Deal ****Urgent**** Near Rm. 213, Boys' gym & Cafeteria 1. Leaking from push knob near rm. 213; 2. Water not getting cold in boys' gym; and 3. Cafeteria fountain is clogged up. September 11, 2002 October 27, 2005 1,142 days
FM-200219561 /02 10/27/05 Deal Boys gym and near room 213 Repair or replace water cooler in boys gym. It is not cooling. Water cooler by room 213 is leaking. Asbestos Code A - Clear for repairs on 10/25/02. DCPS-Safety - Leroy Minton Jr. (RG 10/28/02) October 17, 2002 October 27, 2005 1,106 days
FM-200618867 06 4/3/06 Deal Room 226 Replace ruptured heating coil in room 226. No other operational unit in room. Urgent !!!! February 21, 2006 April 3, 2006 41 days
FM-200618856 06 4/3/06 Deal Library Repair or replace thermostatic control valve on univent. Can not be properly isolated. Urgent !!!! February 21, 2006 April 3, 2006 41 days
FM-200622371 06 5/11/06 Basement-Kitchen: Replace receptacles located on floor, cracked up and not working properly. Note: Safety Issue May 9, 2006 May 11, 2006 2 days
FM-200622070 06 5/30/06 Deal Boiler Room Repair or replace domestic hot water heater, module will not open the gas valve to start. Also replace the relief valve. No hot water. Urgent !!!!!! May 2, 2006 May 30, 2006 28 days
FM-200620087 06 5/31/06 Deal Classroom #216 Repair or replace busted coil on heating unit. (Leaking into lower level). Can not be isolated. Urgent !!!! March 20, 2006 May 31, 2006 72 days
FM-200515034 05 6/7/06 Urgent: Bulk Trash Pick-Up At Rear Of Building By Rm. 107. November 3, 2005 June 7, 2006 216 days
FM-200227010 03 8/25/06 Deal JHS Second Floor Hallway Second Floor Asbestos Assestment Required Ceiling wall and floor needs to be abated Floor needs to be busted up R/R busted radiator near room 204 below the window Third Floor Radiator going down to the rear exit This unit is isolated not operationing In-House Assessment by Sylvia Grimes DCPS Safety recieved 3/28/03. Area is clear to perform exploratory until pipe insulation is then visible. Sylvia Grimes Asbestos Code A - Clear for repairs on 04/18/03. Horne Engineering - Tony Marcolin (RG 04/18/03) March 13, 2003 August 25, 2006 1,261 days
FM-200630673 /06 10/12/06 Baseball Field. Remove soccer goal from off of baseball field. The welders will be needed to complete this task. Note: A child ran into this pole and was injured. October 11, 2006 October 12, 2006 1 day
FM-200500053 05 12/12/06 Deal Gym Repair light fixtures in boys gym. Replace reflectors in girls and boys gym lights. Preparing for basketball season.12 ceiling tiles in boys gym area. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) January 3, 2005 December 12, 2006 708 days
FM-200618275 06 1/12/07 Field-Cut foul pole to ground level, safety issue February 3, 2006 January 12, 2007 343 days
FM-200453336 04 1/23/07 Deal First floor room 126 Repair door jam. Jam not secure to wall. Difficult to close and secure door. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety -Richard Gibson (RG) August 25, 2004 January 23, 2007 881 days
FM-200619249 06 1/23/07 First Floor-Library (New Wing) Replace ceiling tiles that where damaged due to a steam line bursting. All of the damaged tiles where removed. Asbestos Code A - Clear for repairs on 03/01/06 DCPS Safety - Richard Gibson (RG) March 1, 2006 January 23, 2007 328 days
FM-200515033 05 1/24/07 Urgent: First and Second Floor-By Rooms 204, 208, and 108: Replace (6) electronic ballast in corridors. November 3, 2005 January 24, 2007 447 days
FM-200224824 03 1/27/07 Deal Third floor stairwell Replace wooden handrail. Handrail has splinters all over causing hand splinters for the students. Safety issue. January 29, 2003 January 27, 2007 1,459 days
FM-200633491 21/06 1/27/07 Cafeteria above serving line peeling paint on ceiling. Mr. Greenhill, Custodian states that water from window air condition unit on the 1st floor is causing paint to peel. Asbestos Code "A" cleared for repairs 12/28/06--DCPS Safety/Tidewater Lead Code " A" Cleared for repairs ("Lead level 1" no lead based paint inpact) 12/28/06--DCPS Safety/Tidewater DUPLICATE December 21, 2006 January 27, 2007 37 days
FM-200203205 02 1/27/07 (Deal) Exterior Grounds Repair bent and broken protection railing at the edge of the playground (safety hazard). February 21, 2002 January 27, 2007 1,801 days
FM-200443213 04 1/27/07 Deal Classroom #320 Repair or replace burn out motor on univent. AOB- Volts 115 PH 1, Cycle 60 AMPS- 3.0, HP - 1/6 NO heat in this room. Urgent !!!! January 25, 2004 January 27, 2007 1,098 days