Urgent Open Repair Requests
See Also: All Open Repair Requests at Deal Junior High School
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200216294 9/3/02 Deal 1st Floor Room 110B Repair breach in wall that was caused by a steam leak. The leak has been repaired. Asbestos Code A - Clear for repairs on 09/03/02. DCPS Safety - Leroy Minton Jr. (RG 09/04/02) | |
| FM-200334139 8/1/03 Deal First floor main office Rewire fluorescent fixtures. Insulation on wires brittle snd sparking. Replace incadescent fixture in basement corridor. Safety issue (no lights at bottom of stairs). Asbestos Code A - Clear for repairs on 08/01/03. Horne Engineering - Troy Wilcome (RG 08/05/03) | |
| FM-200458356 11/16/04 Deal URGENT First, second and third floors classrooms Flourescent tubes needed to light of classes. Ballasts are burnt out. Asbestos Code A - Clear for repairs on 11/18/04. DCPS Safety - Leroy Minton Jr. (RG 11/18/04) | |
| FM-200510958 8/23/05 Browne Urgent Safety Hazard First, Second, and Third Floors Repair doors, locking devices, hinges, and trim on lockers on all corridors. Need enough lockers to give each student. | |
| FM-200513515 10/5/05 Deal Boiler Room Boiler #2 Retread hand hole and weld a metal plate over the hand hole that very bad. Urgent !!!!! | |
| FM-200621996 5/1/06 1st Floor- Near Room 111 Replace safety glass (wire mesh) in transom above exterior door. Section of glass is out- 59.5 x 17.5 | |
| FM-200633492 12/21/06 Kitchen corridor to cafeteria paint and plaster peeling. Water penetration from roof leak. Asbestos Code "A" cleared for repairs 12/29/06--DCPS Safety/Tidewater Lead Code " A" Cleared for repairs ("Lead level 1" no lead based paint inpact) 12/29/06--DCPS Safety/Tidewater | |
| FM-200633576 12/28/06 First Floor - Room 113 - Requesting to have the floor repaired. The floor has developed a large hump at the entrance. (Safety/Tripping Hazard) Asbestos Code A - Clear for repairs on 01/03/07. Tidewater - Roger Small (RG 02/22/07) |