Urgent Open Repair Requests

See Also: All Open Repair Requests at Amidon Elementary School

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200206638 4/25/02 Amidon Boiler Room ,classrooms and offices ACM and Lead Abatement. 1) Demolition of boilers and all associated equipment,piping and electrical to same equipment. Change steam traps and valves inside classrooms and offices. Install new boilers,equipment,lights,electrical panels,doors and windows. Plumbing,sinks,hot water heaters and drain. Paint mechanical rooms. New controls,insulation and concrete pads. Poc: Matt Murry - 301-252-5521 Mike Williams - Jacobs Engineering. Permit allowed to be issued, DCPS Safety has evaluated the asbestos abatement scope of work (DCPS Safety-Sheila R.Howard (04-30-02) April 25, 2002
FM-200206764 4/29/02 Amidon ****Urgent**** 1st Floor Multi-purpose Room A leak from the roof, over the multi-purpose room, is flooding the floor. Code A - Clear for repairs on 04-29-02 by Horne Engineering / Bipin Nanavarty. Leroy Minton Jr. Safety Office 202-576-8962. April 29, 2002
FM-200206839 4/30/02 ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Multi-Purpose Room, Gymnasium & Lobby 2. Patch holes in the ceiling. When it rains or storms, there is flooding from the water coming in through the holes. Code A-clear for repair by Horne Engineer by ( Z Mahmood ) on 4/26/02 ( CEB ) Lead Based Paint Code A - Clear for repairs on 5/7/02 Lead level 1; No lead based paint to be impacted Horne Engineering - Bipin Nanavaty (RE - 5/08/02) April 30, 2002
FM-200206929 4/30/02 Through-out building: Please upgrade and/or check electricity in building for installation of our air conditioners that are on-site. Asbestos Code A - Clear for repairs on 05/01/02. DCPS Safety - Ronald Edwards (RG 05/02/02) April 30, 2002
FM-200218783 10/3/02 Amidon Boys and gym bathrooms Need someone to please come out to replaster the ceiling in boys restroom by the main office have a hole in ceiling and in the gym teachers bathroom bathroom, the ceiling is falling down. Asbestos Code A - Clear for repairs on 10/09/02. DCPS Safety - Leroy Minton Jr. (RG 10/10/02) October 3, 2002
FM-200500435 1/14/05 Amidon URGENT SAME AS FM-200501894 First and second floor Leaks in various areas in the bldg. Mold is forming in the lobby. Code A - clear for repairs as of 3/17/05 Sylvia Grimes Safety office January 14, 2005
FM-200513645 10/7/05 Amidon Urgent Repair lights on the outside of the building against the wall. October 7, 2005
FM-200513758 10/12/05 Amidon Urgent First Floor-Kitchen and Teachers Lounge Install electrical socket for the A/C units October 12, 2005
FM-200516386 12/13/05 Amidon Room #206 and #210 Repair or replace control switch on heating unit in room #206 and #210. Rooms are cold. Urgent !!!!! December 13, 2005
FM-200620064 3/17/06 Very Urgent Second Floor-Boy's Restroom Re-mount sink to the wall Note: Water was cut off. March 17, 2006
FM-200625859 7/18/06 AMIDON RTU Urgent!!! Repair roof top unit compressors will not engage. both units are down July 18, 2006
FM-200630979 10/19/06 Playground equipment be placed off limits until repairs are completed. The following needs replacement or repair: (1) replace 3 metal decks (2) Adjust 3 rung ladders (3) Install 3 missing post caps. (4) replace loose and missing safety tiles - approximately 50 tiles. (5) repair gate and holes in fence to limit access by unauathorised persons. October 19, 2006
FM-200700007 1/27/07 Old Princi[al Office/Buisness Manager Office/Main Office/Stairway Landing Correct flow problems with heating units indicated above. In Health Suite, electronic valve stem is broken. Urgent !!!! January 27, 2007