Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Duke Ellington School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200105569 01 8/24/01 ELLINGTON THIS OCCURS IN THE FOLLOWING AREAS: 1) BASEMENT LEVEL: RESERVIOR ROAD & 36TH STREET 2) FIRST (1ST) FLOOR- RESERVIOR ROAD & 35TH STREET 3) SECOND (2ND) FLOOR - RESERVIOR ROAD & 35TH, 4) FIRST (1ST)FLOOR - RESERVIOR ROAD & 36TH STREET 5) FIRST (1ST) FLOOR - "R" STREET & 35TH 6) THIRD (3RD) FLOOR - "R" STREET & 35TH STREET 7) BASEMENT - "R" STREET & 36TH STREET 8) FIRST (1ST) FLOOR -"R" & 36TH STREET 9) GYMNASIUM AREA - "R" STREET & 36TH STREET. REPAIR OF HANDRAILS THAT ARE UNATTACHED TO WALLS. SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/07/01. March 12, 2001 August 24, 2001 165 days
FM-200122403 /01 11/19/01 (ELLINGTON) ASBESTOS ASSESSMENT REQ. BASEMENT/ ROOM #60 SINK CLOGGED. NEEDS TO BE UNCLOGGED. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/26/01. CHARLES BUCHANAN - SAFETY (202)576-5582 (RG) October 25, 2001 November 19, 2001 25 days
FM-200122406 /01 11/19/01 (ELLINGTON) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ NEAR ASST. PRINCIPALS OFFICE CLOGGED WATER FOUNTAIN. NEEDS TO BE UNCLOGGED. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/26/01. CHARLES BUCHANAN - SAFETY (202)576-5582 (RG) October 25, 2001 November 19, 2001 25 days
FM-200122404 /01 11/19/01 (ELLINGTON) ASBESTOS ASSESSMENT REQ. 2ND FLOOR/ COUNSELORS OFFICE SINK WATER RUNS CONTINUESLY. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/26/01. CHARLES BUCHANAN - SAFETY (202)576-5582 (RG) October 25, 2001 November 19, 2001 25 days
FM-200122402 /01 11/19/01 (ELLINGTON) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ HALLWAY FOUNTAIN PRESSURE NEEDS ADJUSTING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/26/01. CHARLES BUCHANAN - SAFETY (202)576-5582 (RG) October 25, 2001 November 19, 2001 25 days
FM-200108506 01 11/27/01 ELLINGTON PEST CONTROL PROBLEM. 1) MAIN OFFICE 2) ELLINGTON FUN ROOM ACROSS 3) CAFETERIA 4) HEALTH UNIT HEALTH AND SAFETY HAZARD. April 16, 2001 November 27, 2001 225 days
FM-200107973 01 11/27/01 ELLINGTON PEST CONTROL PROBLEM. 1) DANCE STUDIO 2) BASEMENT HALLWAY - # 1, #2 AND ROOM 24 HEALTH AND SAFETY. April 9, 2001 November 27, 2001 232 days
FM-200122411 /01 12/1/01 (ELLINGTON) ASBESTOS ASSESSMENT REQ. 2ND FLOOR/ RADIO STUDIO 2 DOORS INSIDE NEED TO BE REKEYED. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/26/01. CHARLES BUCHANAN - SAFETY (202)576-5582 (RG) November 29, 2001 December 1, 2001 2 days
FM-200120213 01 1/9/02 (ELLINGTON) ASBESTOS ASSESSMENT REQ. 1ST FLOOR AND BASEMENT 1) MAIN OFFICE- NO WATER PRESSURE IN FACE BOWL 2) 1ST FLOOR WOMENS BATHROOM- NOT WORKING PROPERLY. 3) BOYS BATHROOM (DANCE STUDIO)- COMMODE NOT FLUSHING AND URINAL HAS MISSING SCREWS, IT LEAKS WHEN FLUSHED. 4) BASEMENT GIRLS BATHROOM- NOT FLUSHING PROPERLY. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/21/01. LEROY MINTON - SAFETY (202)576-6691 September 20, 2001 January 9, 2002 111 days
FM-200123981 02 1/11/02 (ELLINGTON) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR/GALLERY REPLACE WORN OUT CYLINDER ON DOOR TO STORAGE CLOSET ON RIGHT SIDE OF GALLERY. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/08/01 RICHARD GIBSON - SAFETY (202)576-5584 January 11, 2002 January 11, 2002 0 days
FM-200124038 /01 4/17/02 (ELLINGTON) ASBESTOS ASSESSMENT REQUIRED BASEMENT/CAFETERIA GARBAGE DISPOSAL IS NOT WORKING, KEEPS GOING ON & OFF (NEEDS CHECKING BY PLUMBER). (MR. LOW THINKS THAT ELECTRICAL SHOULD LOOK AT THINGS---IT SEEMS TO HIM THAT IS MIGHT BE A PROBLEM IN THE BREAKER). ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/08/01 RICHARD GIBSON - SAFETY (202)576-5584 November 29, 2001 April 17, 2002 139 days
FM-200203212 02 4/30/02 (Ellington) Health Code Violation: (Urgent) 1. Asbestos Assessment Required. Ground Floor/Kitchen: Repair or Replace garbage disposal; existing garbage disposal is inoperable. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/21/02. DCPS - SAFETY - RICHARD GIBSON (RG 02/21/02) February 21, 2002 April 30, 2002 68 days
FM-200206814 02 4/30/02 Ellington !!! Urgent !!! Second (2nd) Floor - Room #265 Need Roofing crew to Survey roof leak water leaking from curling auto classroom. April 29, 2002 April 30, 2002 1 day
FM-200207903 02 5/22/02 (Ellington) Fire code violation: Stairwell to Dance studio: Exit light out. Asbestos Code A - Clear for repairs on 05/17/02. DCPS Safety - Richard Gibson (RG 05/17/02) May 16, 2002 May 22, 2002 6 days
FM-200207901 02 5/22/02 (Ellington) Fire code violation: Dance Studio-A: Exit light out. Asbestos Code A - Clear for repairs on 05/17/02. DCPS Safety - Richard Gibson (RG 05/17/02) May 16, 2002 May 22, 2002 6 days
FM-200204271 02 6/5/02 (Ellington) ****Urgent**** 1st Floor Room 105 There is a leaking drain line in room 105---the dirty water coming from the ceiling is being caught in trash baskets & buckets. Code A-clear for repair by Horne Egineer on ( Troy Wilcome) 3/13/02 (CEB) March 11, 2002 June 5, 2002 86 days
FM-200206294 02 6/7/02 Ellington ****Urgent**** Ground Floor Kitchen Grease trap is backing up in the kitchen again! April 23, 2002 June 7, 2002 45 days
FM-200100080 /6/01 6/19/02 ELLINGTON CORNER OF BUILDING SOUTH SIDE REPAIR CRACKS IN SIDEWALK NOTE: SAFETY HAZARD--POSSIBLE INJURIES FORMERLY GR-20000234 January 6, 2001 June 19, 2002 529 days
FM-200202327 02 6/23/02 (ELLINGTON) ***URGENT*** 2ND FLOOR GIRLS RESTROOM & TEACHERS LOUNGE 1) THE HANDICAPPED COMMODE (VERY LAST COMMODE) NEEDS SNAKING 2) THE 2ND FLOOR TEACHERS LOUNGED FACE BOWL NEEDS TO BE SNAKED (WATER IS TURNED OFF TO ISOLATE THE PROBLEM) February 1, 2002 June 23, 2002 142 days
FM-200212698 02 8/29/02 (Ellington) !!!Urgent!!! Ground Floor/Outside cafeteria: Re-anchor existing pipes; anchors have come loose, and pipes have fallen. Need to be re-anchored. July 23, 2002 August 29, 2002 37 days
FM-200121018 01 10/16/02 (ELLINGTON) ASBESTOS ASSESSMENT REQ. OUTSIDE/ FRONT OF BUILDING & REAR OF BUILDING STEPS LIGHTS-SOME ARE WORKING AND SOME ARENT. REAR- LIGHT MAY HAVE A SHORTAGE AND IT KNOCKS OF THE SUMP PUMP. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/06/01. LEROY MINTON - SAFETY (202)576-6691 October 4, 2001 October 16, 2002 377 days
FM-200206278 02 11/1/02 Ellington !!! Emergency !!! First (1st) Floor - Main Office Lobby Expose wiring are showing and the panel cover is fallen down. Health and Safety Hazard. April 22, 2002 November 1, 2002 193 days
FM-200116069 01 3/3/03 (ELLINGTON) 1. ASBESTOS ASSESSMENT REQUIRED. GROUNDS/35TH STREET SIDE: REPAIR OR REPLACE RAILING; TEMPORY SLEEVE TO SUPPORT RAILING HAS BROKEN. POC: Sheila Howard (202) 576-8962 ASBESTOS CODE A - CLEARED FOR REPAIRS ON 7/31/01. R. EDWARDS SAFETY OFFICE (202) 576-6693. July 27, 2001 March 3, 2003 584 days
FM-200202326 02 3/3/03 (ELLINGTON) ***URGENT*** ASBESTOS ASSESSMENT REQUIRED BASEMENT/SUB-BASEMENT DANCE STUDIO 2ND FLOOR GIRLS RESTROOM 1) BOYS RESTROOM HAS BROKEN PARTITIONS WHICH NEED REPAIR OR REPLACEMENT (THEY ARE TORN AWAY FROM THE FLOOR) 2) GIRLS 2ND FLOOR RESTROOM NEEDS BROKEN PARTITIONS REPAIRED OR REPLACED Asbestos Code A - Clear for repairs on 06/07/02. DCPS Safety - Ronald Edwards (RG06/10/02) Note: repaired anda replaced toilet in girls restroom and dance studio February 1, 2002 March 3, 2003 395 days
FM-200207277 02 3/20/03 Ellington !!! Urgent !!! Grounds/Parking Lot - 36th Street Parking Lot area needs fill dirt and gravel. Parking lot has lots of Pot Holes. May 7, 2002 March 20, 2003 317 days
FM-200210403 02 3/20/03 (Ellington) !!!Very Very Urgent!!! Outside grounds: Request sign to indicate dog waste is a hazard. (Attention: Tyrone Jones. June 26, 2002 March 20, 2003 267 days
FM-200106553 01 3/20/03 ELLINGTON FRONT OF BUILDING ENTRANCE HANDI-CAP RAMP BRICKS ARE FALLING APART FROM THE MUD WHICH HAS DRY. SAFETY HAZARD. March 23, 2001 March 20, 2003 727 days
FM-200330067 03 5/14/03 ELLINGTON !! URGENT !! First Floor - Cafeteria 1. Repalce hot water heater in the cafeteria . May 12, 2003 May 14, 2003 2 days
FM-200202325 02 6/23/03 (ELLINGTON) ***URGENT*** VARIOUS AREAS OF SCHOOL 1) BASEMENT/SUB-BASEMENT: LEAKING URINAL IN BOYS RESTROOM DUE TO FAULTY HARDWARE 2) GIRLS RESTROOM: A COMMODE IS NOT FLUSHING & NEEDS TO BE SNAKED 3) HEALTH SUITE: TWO TOILETS IN UINISEX RESTROOM HAVE LEAKING BECAUSE OF FAULTY HARDWARE 4) DANCE STUDIO/MAIN OFFICE: FAULTY HARDWARE CAUSING LEAKING FROM FLUSH MECHANISM. BOYS RESTROOM: A URINAL IS LEAKING & ALSO NEEDS TO BE REANCHORED TO THE WALL. February 1, 2002 June 23, 2003 507 days
FM-200119970 01 6/23/03 (ELLINGTON) ASBESTOS ASSESSMENT REQ. SCIENCE LABS 2ND FLOOR NEED PLUMBERS TO SNAKE OUT DRAINS AND REPAIR WATER LINES TO RESTORE WATER TO SCIENCE LABS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 September 17, 2001 June 23, 2003 644 days
FM-200201338 02 6/30/03 (ELLINGTON) ASBESTOS ASSESSMENT REQUIRED 1ST, 2ND, 3RD, BASEMENT & SUB-BASEMENT 1) 1ST FLOOR: INSTALL 2 WATER FOUNTAINS; ADJUST WATER TEMP. IN 2 EXISTING WATER FOUNTAINS (WATER IS WARM); 2) 2ND FLOOR: INSTALL 3 WATER FOUNTAINS; ADJUST WATER TEMP. IN 2 EXISTING FOUNTAINS (WATER IS WARM); 3) 3RD FLOOR: ADJUST WATER TEMP. IN FOUNTAIN (WATER IS WARM); 4) BASEMENT HALLWAY: INSTALL 2 WATER FOUNTAINS & ADJUST WATER TEMP. IN 1 EXISTING FOUNTAIN (WATER IS WARM); BASEMENT CAFETERIA: INSTALL 2 WATER FOUNTAINS; 5) SUB-BASEMENT: GYM: INSTALL 1 WATER FOUNTAIN & ADJUST WATER TEMP. IN EXISTING FOUNTAIN (WATER IS WARM); SUB-BASEMENT DANCE STUDIO: INSTALL 1 WATER FOUNTAIN & ADJUST WATER TEMP. IN EXISTING FOUNTAIN (WATER IS WARM) CODE A CLEAR FOR REPAIR-HORNE ENGINEERING STEPHEN CALDWELL 01-22-02 DCPS SAFETY SHEILA R. HOWARD 01-22-02 January 18, 2002 June 30, 2003 528 days
FM-200217975 02 7/29/03 Ellington, Duke Basement - Gym - room 254 1. Drinking fountains not working in these areas , need electrical power installed . Asbestos Code A - Cleared for repairs on 10-21-02 (LM 10/24/02) Leroy Minton Jr. Safety Office 202-576-8962. September 20, 2002 July 29, 2003 312 days
FM-200442210 04 1/8/04 (Ellington) !!!URGENT!!! Basement: Please restore electricity in this area, lights are out on one side. Breaker shuts off each time it re-set. January 5, 2004 January 8, 2004 3 days
FM-200449233 04 6/15/04 (Ellington) !!!VERY URGENT!!! 2nd Floor/Teachers Lounge: Replace tank top toilets with sloan flush valves system, as soon as possible. (Energy Savers Toilets) Once again, tank top toilets are stopped up, drain sewer lines are backing up on floor, and sewer water leaking down in the Assist. Principal's Office. Plumbers cleared drain twice in the month of May 2004. June 10, 2004 June 15, 2004 5 days
FM-200454023 04 12/9/04 Ellington Basement ramp overhead door Door on ramp in bank bldg. on 36tst Street side, need steel plated rod across the bottom of overhead, to stop rodents from entering bldg. Two holes at bottom overhead door on each end. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 8, 2004 December 9, 2004 92 days
FM-200453928 04 12/10/04 Ellington First floor Studio # 117 ceiling and walls need painting. Room # 120 need plastering and painting. Theater office # 118 need painting. Office # 115 ceiling and walls need plastering and painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453925 04 12/10/04 Ellington Second floor Classroom #265, counselor #265A and lavatory need plastering and painting. Lavatory need painting. Library areas , reading room ceiling and walls need plastering and painting. Information desk area ceiling and walls need plastering and painting. Two storage rooms need painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453924 04 12/10/04 Ellington Second floor Classroom #260 need painting. Room 262 ceiling and walls over top of window frame need plastering and painting the other ceiling and walls need painting. Room 264 and 264A ceiling and walls need painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453915 04 12/10/04 Ellington Second floor Classroom # 208, teacher lounge, and women lavatory ceilng and walls need plastering and painting. Mens lavatory need painting. Replace ceramic tile in womens lavatory. Room 215A ceiling and walls in room and lavatory need painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453905 04 12/10/04 Ellington Second floor Classroom # 228, 201 and 205 ceiling and walls need plastering and painting. Room 212 need painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453904 04 12/10/04 Ellington Third floor classrooms Classroom # 311, 314 and 301 ceiling and walls need plastering and painting. Room 309 closets need plastering and painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453903 04 12/10/04 Ellington Basement Classroom # 21B, 22A 27 and 16A ceiling and walls need plastering and painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453902 04 12/10/04 Ellington Basement classrooms and health suite Classroom # 2A and 2B ceiling and walls need painting. Classroom # 1 ceiling and walls need painting. Health suite, nurse station ceiling and walls need painting. Sick bey room ceiling and walls need painting and lavatory. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453901 04 12/10/04 Ellington Cafeteria areas Cafeteria ceiling and walls need plastering and painting. Kitchen area ceiling and walls need painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453900 04 12/10/04 Ellington Sub basement gym and dance studio Gym, dressing room and stairwell leaving into gym ceiling and walls need plastering and painting. Dance studio, dressing room, lavatories and stairwell ceiling and walls need plastering and painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200453926 04 12/10/04 Ellington Second floor Library areas: Office ceiling painting. Lavatory need painting. Room 220 and 216 ceiling and walls need painting. Two Storage room ceiling and walls needs painting. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) September 3, 2004 December 10, 2004 98 days
FM-200338107 03 12/14/04 Ellington !!!VERY URGENT!!! Subject: Keys for faculty members 15 copies of same keys for these areas, faculty bathroom, teacher lounge and resource room. : September 26, 2003 December 14, 2004 445 days
FM-200451812 04 12/23/04 Ellington, Duke Fire Code Violation Second floor Across from 260 exit sign need cover. 200 IFV 907.20.1 Asbestos Code A - Clear for repairs on 08/19/04. DCPS Safety - Leroy Minton Jr. (RG 08/20/04) August 6, 2004 December 23, 2004 139 days
FM-200451811 04 12/23/04 Ellington, Duke Fire Code Violation Second floor Next 205 d exit sign out. 200 IFV 907.20.1 Asbestos Code A - Clear for repairs on 08/19/04. DCPS Safety - Leroy Minton Jr. (RG 08/20/04) August 6, 2004 December 23, 2004 139 days
FM-200102723 01 7/25/05 ELLINGTON SUB-BASEMENT - DANCE STUDIO REPAIR OR REPLACE METAL BARS PULLING FROM THE WALLS. SAFETY HAZARD. Asbestos Code A - Clear for Repair ON 03/13/01. Horne Engineering - Dan Will February 1, 2001 July 25, 2005 1,635 days
FM-200203224 02 11/3/05 (Ellington) Health Code Violation: (Urgent) Ground floor: Repair light fixture in walk in freezer. February 21, 2002 November 3, 2005 1,351 days
FM-200115069 01 11/3/05 (ELLINGTON) HEALTH CODE VIOLATION: BASEMENT CAFETERIA/KITCHEN: ICE MAKER LEAKING WATER ON FLOOR, CREATING A SAFETY HAZARD. July 11, 2001 November 3, 2005 1,576 days
FM-200505547 05 11/15/05 Ellington Urgent !!! Exterior - Dance Studio 1) Snake drains around Dance Stuido. Drains are stopped up. May 16, 2005 November 15, 2005 183 days
FM-200445176 04 11/18/05 (Ellington) !!!URGENT!!! Basement/1st Hallway Area: Repair or replace water fountain on 1st hallway near classroom #108, also, hallway near back exit door. Asbestos Code A - Clear for repairs on 03/15/04. Horne Engineering - Bipin Nanavaty (RG 03/15/04) March 10, 2004 November 18, 2005 618 days
FM-200330052 03 11/18/05 (Ellington) !!!VERY URGENT!!! Kitchen: No hot water in the kitchen. May 12, 2003 November 18, 2005 921 days
FM-200203216 02 11/18/05 (Ellington) Health Code Violation: (Urgent) 1. Asbestos Assessment Required. Ground Floor/Kitchen: Install an additional service sink for washing hands; need approximately two (2) sinks. Code-A clear for repiar by horne engineer ( Stephen Caldwell ) 3/06/02 CEB February 21, 2002 November 18, 2005 1,366 days
FM-200336525 03 11/18/05 (Ellington) !!!URGENT!!! Basement/Cafeteria, & Kitchen: Drain water is seeping through hole in walls where pipes are installed, causing flooding on floors in cafeteria, and kitchen area. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Ray Agnant (RG 09/29/03) August 28, 2003 November 18, 2005 813 days
FM-200336751 03 11/18/05 (Ellington) !!!VERY URGENT!!! Kitchen: Clean out line to grease trap; grease backing up in kitchen. September 3, 2003 November 18, 2005 807 days
FM-200503927 05 11/18/05 (Ellington) HEALTH CODE VIOLATION: Kitchen: Repair leak from faucet, and increase hot water temperature at (2) compartment sink. (80 degree F) Asbestos Code A - Clear for repairs on 04/13/05. DCPS Safety - Richard Gibson (RG) April 12, 2005 November 18, 2005 220 days
FM-200336530 03 12/14/05 (Ellington) !!!URGENT!!! Sub-Basement/Dance Studio: Drain spouse line outside needs concrete flooring to stop drain water from sinking into the ground near building, causing flooding to office in the Dance Studio. August 28, 2003 December 14, 2005 839 days
FM-200338327 03 12/14/05 Ellington Front exteror og bldg. Replace or repair concrete and metal face cap. This request is urgent. October 1, 2003 December 14, 2005 805 days
FM-200113162 01 2/3/06 ELLINGTON ROOM #251A ASBESTOS ASSESSMENT REQUIRED (1) STRUCTURAL MAINTENANCE- SURVEY AND DETERMINE ELECTRICAL LOAD FOR WINDOW AIR CONDITIONING UNIT. (2) INSTALL ONE (1) AIR CONDITIONING UNIT WHICH IS ON SITE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/19/01. RONALD EDWARDS - SAFETY (202)576-6693 June 13, 2001 February 3, 2006 1,696 days
FM-200122405 /01 2/3/06 (ELLINGTON) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ NEAR GIRLS BATHROOM HALLWAY SINK NEEDS NEW HARDWARE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/26/01. CHARLES BUCHANAN - SAFETY (202)576-5582 (RG) October 25, 2001 February 3, 2006 1,562 days
FM-200123550 /01 2/3/06 (ELLINGTON) ASBESTOS ASSESSMENT REQUIRED SUB-BASEMENT/GYMNASIUM NEED 2 RIMS INSTALLED IN GYMNASIUM. (HAVE ONE RIM ON HAND) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/28/01 LEROY MINTON - SAFETY (202)576-6691 November 16, 2001 February 3, 2006 1,540 days
FM-200122407 /01 2/3/06 (ELLINGTON) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ GIRLS BATHROOM WATER PRESSURE CANT BE ADJUSTED. NEEDS A KIT. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/26/01. CHARLES BUCHANAN - SAFETY (202)576-5582 (RG) October 25, 2001 February 3, 2006 1,562 days
FM-200124048 /01 2/3/06 ELLINGTON !!!! EMERGENCY !!!! KITCHEN/CAFETERIA GARAGE DISPOSAL IS SHOOTING OUT SPARKS. SAFETY HAZARD. November 29, 2001 February 3, 2006 1,527 days
FM-200121247 /01 4/14/06 ELLINGTON CAFETERIA AREA EXPLORATORY DEMILITION IN CAFETERIA. (1) ASBESTOS ASSESSMENT REQUIRED (2)REPAIR 6" STEAM LINE IN CEILING OF CAFETERIA ( LINE IS INSULATED). (3) INSULATE PIPE IN FLOOR OF ROOM 56 (4) BACK FILL HOLE AND REPAIR CONCRETE FLOOR IN ROOM 56 NOTE: BOILER HAD TO BE SHUT DOWN AND THIS IS THE ONLY OPERATIONAL BOILER IN BUILDING! ENVIROBATE (IT GROUP) 703-461-6848 ASBESTOS CODE -A ABATED ON 10-18-01. PER LEROY MINTON CONFIRMATION. (LM) SAFETY OFFICE 202-576-8962. October 10, 2001 April 14, 2006 1,647 days
FM-200449968 04 5/4/06 Ellington Second floor library area Rod that hold light fixture is coming away from bracket on ceiling need repairing. ASAP. Asbestos Code A - Clear for repairs on 07/07/04. DCPS Safety - Leroy Minton Jr. (RG 07/21/04) July 1, 2004 May 4, 2006 672 days
FM-200623910 06 8/18/06 Ellington Boiler Room Repair or replace chiller. Unit need to be reset after set temperature has been reach and unit shut off. Additionally chiller relay is arching and motor making loud noise. Unit is turn off at present. Chiller cools auditorium. Only chiller on site. Urgent !!!!! June 6, 2006 August 18, 2006 73 days
FM-200622795 06 8/22/06 Ellington Chiller Repair or replace rupture chill water line on chiller. Urgent !!!!!! May 17, 2006 August 22, 2006 97 days
FM-200341536 /03 8/25/06 Ellington Room #16A Asbestos assessment required on Room #16A floor area. Repair or replace what appears to be a rupture heating line under floor area. Floor is very hot. Asbestos Code 'A' cleared for repairs 12/29/04. DCPS Safety R. Edwards (RE-12/29/04). Abatement conducted by Goel Constuction; Air Monitoring by USA Environmental Inc. Asbestos Code A - Clear for repairs on 12/16/03. Horne Engineering - Edward Rodriguez (RG 12/17/03) December 13, 2003 August 25, 2006 986 days
FM-200623595 06 10/24/06 Ellington Penthouse 2nd Floor Repair or replace air handler unit #6 and #7 for Theater Room. Poor air circulation. Need air for graduation. Urgent !!!! May 31, 2006 October 24, 2006 146 days
FM-200221441 /02 11/8/06 Ellington, Duke Basement -Cafeteria Plastering is falling from the wall and ceiling on the left entrance area in the cafeteria (R Street side). Both sides of the cafeteria Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002 November 8, 2006 1,449 days
FM-200623468 06 12/14/06 Sub Basement- Gym A light fixture just fell and nearly hit a student and 6 more are loose. Please evaluate and/or replace as soon as possible. URGENT!!! May 30, 2006 December 14, 2006 198 days
FM-200455841 04 1/17/07 Ellington, Duke Exterior front courtyard For pole lamp, global cover needs replacing, lamp wire and fixtures is j=hanging from lamp fixture. Pole lamp in front courtyard near handicapp ramp. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) September 27, 2004 January 17, 2007 842 days
FM-200336524 03 1/20/07 (Ellington) !!!VERY URGENT!!! Roof Drains: Drains leaking, in-to Gym area, and storagae room, flooding the floors. (Needs to be unstopped. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Ray Agnant (RG 09/29/03) August 28, 2003 January 20, 2007 1,241 days
FM-200512997 05 1/20/07 Ellington Very Urgent Cold water pipe over the nurse door in the hallway is leaking through the joint. September 21, 2005 January 20, 2007 486 days
FM-200335713 03 1/20/07 (Ellington) !!!VERY URGENT!!! Basement/Nurse's Office: Unable to turn lights on; sparks shooting from light fixtures. August 19, 2003 January 20, 2007 1,250 days
FM-200221830 02 1/20/07 (Ellington) 1. Asbestos assessment required. First Floor principals office At the door of the principals office the floor tile is broken and needs repair. Asbestos Code A - Abated and cleared for repairs on 12-16-02 (LM) per Leroy Minton Jr. confirmation. Safety Office (202) 576-8962. December 2, 2002 January 20, 2007 1,510 days
FM-200619583 06 1/20/07 Urgent Classroom 201-Sink is stoped up and needs to be snaked out. March 7, 2006 January 20, 2007 319 days
FM-200619584 06 1/20/07 Very Urgent Repair exterior lights-10 in front of the building-in rear handicap ramp for pole lamp, global cover needs replacing lamp wires and fixtures are hanging from the lamp. DUPLICATE March 7, 2006 January 20, 2007 319 days
FM-200221616 /02 1/20/07 (Ellington) 1. Asbestos assessment required. Room #101: Need an electrical outlet installed. Asbestos Code A - clear for repairs as of 12/3/02 by Horne Engineers Bipin Nanavaty DCPS safety Sylvia Grimes. November 25, 2002 January 20, 2007 1,517 days
FM-200221436 /02 1/20/07 Ellington, Duke Basement - hallways The wall is peeling plaster outside the cafeteria door across from the lockers on the nurses side of the building. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002 January 20, 2007 1,522 days
FM-200503926 05 1/20/07 (Ellington) HEALTH CODE VIOLATION: Kitchen: Remove scaling paint from walls in storeroom, inside kitchen. Lead & Asbestos Code A - Clear for repairs on 05/02/05. DCPS Safety - Richard Gibson (RG) DUPLICATE April 12, 2005 January 20, 2007 648 days
FM-200340325 /03 1/20/07 (Ellington) !!!VERY URGENT!!! Exterior Roof Molding/Roof Shingle: Part of roof shingle gave way near building, back up generator is sout side of building, near reservoir Road; needs repairing as soon as possible. November 14, 2003 January 20, 2007 1,163 days