Urgent Open Repair Requests

See Also: All Open Repair Requests at Duke Ellington School

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200217113 9/10/02 Ellington ****Urgent**** Asbestos Assessment Reqd. 3rd Floor Room 309 Water is leaking from the ceiling. Asbestos Code A - Clear for repairs on 09/11/02. Horne Engineering - Bipin Nanavaty (RG 09/12/02 September 10, 2002
FM-200220872 11/13/02 Wilson, W. First floor - Kitchen Install new floor inside walk-in box. (Sheet metal personnel needed.) Asbestos Code A - Clear for repairs on 04/29/03. DCPS Safety - Leroy Minton Jr. (RG 04/29/03) November 13, 2002
FM-200221415 11/20/02 Ellington, Duke Sub-basement gym The floor in gym is buckling and needs repair or need a new floor. Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002
FM-200221416 11/20/02 Ellington, Duke Sub-basement gym Paint peeling from the walls in the staircase leading down to the gym. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002
FM-200221419 11/20/02 Ellington, Duke Basement dance studio Paint peeling from the wall in the girls dressing room. Need painting. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez/ Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002
FM-200221421 11/20/02 Ellington, Duke Sub-basement dance studio Dance rails are down and need to be mounted in dance studio (2) two. Asbestos Code A- Cleared for repairs on 04-19-03 by Leroy Minton Jr (LM/01-15-04) Safety Office. 202-576-8962. November 20, 2002
FM-200221425 11/20/02 Ellington, Duke Sub-basement dance studio Walls are peeling paint and plaster need repair. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Sheryll James DCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002
FM-200221431 11/20/02 Ellington, Duke Basement - Nurse's office The office walls and ceiling needs painting, because the walls and ceiling are peeling. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002
FM-200221433 11/20/02 Ellington, Duke Basement - hallways The hallways need to be painted. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward Rodriguez DCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002
FM-200221445 11/20/02 Ellington, Duke Basement level The pipes are peeling in the hallway by the R St. entrance. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/ Edward RodriguezDCPS Safety Charles E. Buchanan on 11/26/02 November 20, 2002
FM-200221842 12/2/02 (Ellington) Hot method floor tile removal AMP 231 and AMP 302. 1. Asbestos assessment required. Second floor - room 203 The steps entering into the room is broken and need repair. Asbestos Code A - Abated and cleared for repairs on 12-16-02 (LM) per Leroy Minton Jr. confirmation. Safety Office (202) 576-8962. December 2, 2002
FM-200222090 12/4/02 (Ellington) In theater, back stage at the right a electrical socket is not working. Asbestos Code A-clear for repair by DCPS on 12-09-02 Safety Charles Buchanan Howard James 202-282-05662 Jone Walker 202-342-7589 December 4, 2002
FM-200336527 8/28/03 (Ellington) !!!URGENT!!! Sub-Basement/Dance Studio: Drain water from the out-side exterior is backing up in building, coming through office; flooring needs repairing. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Ray Agnant (RG 09/29/03) August 28, 2003
FM-200337527 9/15/03 (Ellington) !!EMERGENCY!!! Asbestos Assessment Required. R-Street Stairs/3rd Floor: Repair or replace handrails that are badly damaged. (Neighborhood Commisioner attended a meeting in the school, and she observed the danger of the broken handrails) Asbestos Code A - Clear for repairs on 09/15/03. Horne Engineering - Bipin Nanavaty (RG 09/17/03) September 15, 2003
FM-200455526 9/23/04 (Ellington) Cafeteria: Provide plywood, or drywall to cover walls inside cafeteria due to existing damage. Asbestos Code A - Clear for repairs on 09/24/04. DCPS Safety - Richard Gibson (RG) September 23, 2004
FM-200503799 4/11/05 Ellington Photo Lab Asbestos assessment required for surrounding floor tile and pipe insulation. Excavation of floor may be necessary. Investigate and repair steam leak coming into Photo Lab via pipe chase. Code A-clear for repair by DCPS Charles Buchanan on 4/25/05 IF excavation is needed call Safety Office 202 576 8962 April 11, 2005
FM-200506633 6/12/05 Ellington Boiler Room Service chiller, Chiller is during the same thing when contractor came last week (nothing). Urgent !!!!! June 12, 2005
FM-200514874 10/31/05 Urgent-Repair leaking skylight in the sub-basement gym October 31, 2005
FM-200514876 10/31/05 Urgent-Water leaking from the hallway ceiling on the 3rd fl. peeling plaster from the ceiling across from rm. 311. October 31, 2005
FM-200516898 12/22/05 Asbestos Assessment Required. "Urgent" Second floor stairwell near studio. Replaster 20 ft. ceiling because large loose pieces of plaster are falling Note: This is a safety hazard. Asbestos Code A - Clear for repairs on 12/27/05. Tidewater - Tony Marcolin (RG 01/03/06) December 22, 2005
FM-200700120 1/31/07 Classroom #8 Repair or replace heating unit. Appears to have a bad motor. Unit is located about 8' (ft) off floor, only unit in area. Urgent !!! January 31, 2007
FM-200700709 2/21/07 Boiler Room - Repair or replace inoperatable blower motor on Boiler #2. Building needs (3) boilers to proper heating on cold days. Note: Boilers #3 and #5 has leaking sections. Urgent !!!! February 21, 2007
FM-200700953 2/27/07 Dressing Rooms 1stFloor (Girls and Boys) Repair or replace univent in each area. (Bad motor) Urgent !!!! February 27, 2007

© The Washington Post Company