| FM-200117098 01 8/27/01 (GIBBS) 19TH & ROSEDALE STREET: REPLACE BROKEN WIRE MESH GLASS IN EXTERIOR DOORS IN KITCHEN, DUE TO VANDALISM. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY SG 8/10/01. | |||
| FM-200119884 01 9/26/01 (GIBBS) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ ROOM 312 REPLACE A BROKEN WINDOW PANE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 | |||
| FM-200122218 /01 10/31/01 GIBBS !!!!URGENT!!! FIRST FLOOR - COUNSELORS OFFICE IN STORAGE ROOM 1) LOCK ON STORAGE ROOM DOOR IS STUCK, SHE CANT GET IN TO GET TESTING MATERIALS THAT IS NEEDED FOR TODAY. | |||
| FM-200111310 01 12/5/01 (GIBBS) 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/CHAIR ROOM: WIRE FROM LIGHT SWITCH, EXPOSED. STUDENTS ENTER THE ROOM TO OBTAIN CHAIRS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/14/01. LEROY MINTON - SAFETY (202)576-6691 | |||
| FM-200123865 /01 1/8/02 (GIBBS) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR/ROOM 121 CLASS ROOM DOOR NEEDS REPAIR--IT IS HARD TO OPEN THE DOOR AND IT NEEDS REALIGNMENT. ASBESTOS CODE A-CLEAR FOR REPAIR ON11/29/01 BY DCPS SAFETY CEB | |||
| FM-200123864 /01 2/4/02 (GIBBS) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR/ROOM 101 PANIC BAR WILL NOT RELEASE MAKING THE EXIT DOOR HARD TO GET OUT OF, CREATING A FIRE CODE VIOLATION. ASBESTOS CODE A-CLEAR FOR REPAIR ON11/29/01 BY DCPS SAFETY CEB | |||
| FM-200202437 02 2/8/02 (GIBBS) ASBESTOS ASSESSMENT REQUIRED FLOORS 1, 2 & 3/FIRE DOORS INSTALL WIRE-GLASS & LIGHT KITS IN 26 NEW METAL DOORS ON THE 1ST, 2ND & 3RD FLOORS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/05/02. RICHARD GIBSON - SAFETY (202)576-5584 | |||
| FM-200203548 02 2/27/02 (Gibbs) ***Urgent*** 3rd Floor Reading Lab "A" A child broke the window glass in reading Lab A and needs to be replaced. | |||
| FM-200117395 01 4/11/02 GIBBS PLAYGROUND REMOVE PLAYGROUND EQUIPMENT BURNED BY VANDALS. SAFETY HAZARD FOR CHILDERN. | |||
| FM-200209206 02 6/7/02 Gibbs ****Urgent**** Exterior Grounds Due to storm, a tree has fallen down on the east-side of the building and needs removal. POC: Mr. Manigan | |||
| FM-200205428 02 9/3/02 Gibbs Third Floor 1) Restoration required on the floor tile in the hallway. The work to be performed by DCPS Structural Maintenance. Poc: William Moody - 202-439-8268 Asbestos Code A - Clear For Repairs On 04/04/02. DCPS Safety - Sheila R Howard(RG 04/04/02) | |||
| FM-200208696 02 9/4/02 Gibbs ****Urgent**** Outside Drain Near Boiler Room Exit Door Drain is backed up and harboring mosquitos [health hazard]. | |||
| FM-200212651 02 9/15/02 Gibbs First Floor - Room 128 1) Broken floor tile called in by principal Charles Buchanan, DCPS Safety took the call. Poc: Linda Satterwaite Asbestos Code A - Clear for repairs. Abated on 07-31-02 (LM) per Leroy Minton confirmation. Safety Office 202-576-8962. | |||
| FM-200209650 02 11/1/02 (Gibbs) ****Emergency**** 1st Floor/Near room #128: Light fixture hanging from ceiling, wires expose. (This is a safety hazard) | |||
| FM-200217899 02 1/22/03 Gibbs ****Urgent**** 1st Floor Boys' Restroom Repair broken/cracked urinal. Water is running onto the floor daily. POC: Mr. Manigan | |||
| FM-200119882 01 1/23/03 (GIBBS) ASBESTOS ASSESSMENT REQ. 3ND FLOOR/ CORRIDOR REPLACE ONE (1) PORCELIAN WATER FOUNTAIN WITH A NEW WATER COOLER (WALL MOUNTED). This work order was a Code - A until it was discovered wall penetration became necessary. Exploratory necessary / Leroy Minton Jr. Safety Office (202)-576-6289. Asbestos Code A - Clear for repairs on 12/07/02. Horne Engineering -Philp Connolly (RG 12/12/02) | |||
| FM-200226178 03 3/18/03 Gibbs Thirdt floor - room 302 Windows broken out Safety hazard. | |||
| FM-200227286 03 3/31/03 Gibbs Outside Rosedale street Around dumpster pipes and fence needs removed. Safety Hazard | |||
| FM-200224280 03 3/31/03 Gibbs First floor - Kgn Front door to classroom and their bathroom is falling off the hinges. Asbestos Code A-clear for by Safety Office on 01/29/03 Charles Buchanan | |||
| FM-200222375 /02 4/25/03 Gibbs Principal's office,1st floor, room 121, and vice Principal' office 1. Asbestos assessment required., 2. Repair or replace stopped up coils in the following areas, Principal's office ,room 121,and the vice Principal's office,engineer attemped to back flush with no success. 3. Principal's office check status of pneumatic valve (HVAC Shop) Point of contact: Mr. C. Bradley (202) 438-7437 Please call proir to going to tthe site. Asbestos Code B by Horne Engineer Philp Connolly DCPS Charles Buchanan on 12/30/02 Code A - Asbestos abated on 02/10/03 PER Ronald Edwards - Safety confrimation (RG 02/12/03) | |||
| FM-200208069 02 4/29/03 Gibbs ****Urgent**** Outside Playground Remove playground equipment which poses safety hazards. | |||
| FM-200333749 03 7/24/03 (Gibbs) !!!VERY URGENT!!! Boiler Room: Water building up; sump pump is not pumping water out; water has flooded the floor. | |||
| FM-200216326 02 8/7/03 (GIBBS) Asbestos Assessment Reqd. 1st & 2nd Floors/Library & Pre-K Area Install window a/c units in pre-k and library areas [units are on site]. POC: Mr. Manigan Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) | |||
| FM-200332970 03 8/8/03 (Gibbs) !!!VERY URGENT!!! 1st Floor/Hallway: Exposed wire in main hallway that needs to be removed. (Safety Hazard) | |||
| FM-200334622 03 8/27/03 Gibbs Outside kitchen Need grates fabricated for driveway to kitchen, is missing. Safety Hazard A kid has gotten hurt. | |||
| FM-200338271 03 10/3/03 Gibbs Third floor room 304 Lock on classroom door keep jamming causing a safety violation for kids. | |||
| FM-200218802 02 3/9/04 Gibbs !!!VERY URGENT!!! Asbestos Assessment Required. Second floor - Room 200 Classroom door needs repaired, will not close. | |||
| FM-200227958 03 3/10/04 (Gibbs) 1st Floor Kindergarten/Room #103: Restroom door is falling. (Hinges needed) !!Safety Hazard!! code A-clear for repair by DCPS Charles Buchanan on 4/02/03 | |||
| FM-200332968 03 3/10/04 (Gibbs) !!!VERY URGENT!!! 1st Floor/Back Door on Rosedale Street Side: Repair or replace door that has a large hole in it. This must has been caused in an attempted break-in. This hole is large enough to reach the lock inside to open the door; door need to be secured. Asbestos Code A - Clear for repairs on 07/08/03. Horne Engineering - Philp Connolly (RG 07/08/03) | |||
| FM-200227289 03 3/10/04 Gibbs URGENT First floor kitchen The rear doors are damaged need repair or replacing will not open. Fire C0de Violation. | |||
| FM-200227089 03 3/10/04 (Gibbs) !!!VERY URGENT!!! Asbestos Assessment Required. 1st Floor/Kitchen: Repair or replace kitchen exterior door; unable to lock. Asbestos Code A - Clear for repairs on 03/19/03. Horne Engineering - Bipin Nanavaty (RG 03/20/03) | |||
| FM-200219650 /02 3/10/04 (Gibbs) !!!VERY URGENT!!! Room #101/Kindergarten room: As light switch was turned on, fire ignighted from the ballast. There is a burning smell present, and sparks appear each time lights switch is turned on. | |||
| FM-200445448 04 3/30/04 Gibbs Roof Repair or replace cooling tower busted water supply line. Size: 1 1/2" P S: This water fills up the roof and runs down in the top floor classroom. Urgent !!!!! | |||
| FM-200340872 03 4/8/04 Gibbs First floor kitchen Sink in kitchen is leaking at the trap causing safety problem. | |||
| FM-200446619 04 4/13/04 GIBBS boiler room URGENT ATTENTION is needed Repair/replace inoperable sump pumps boiler room will flood. | |||
| FM-200334561 03 4/19/04 (Gibbs) FIRE CODE VIOLATIONS: Through-Out: Fire extinguishers cabinet, safety glass on 1st, 2nd, & 3rd floor. | |||
| FM-200450528 04 7/20/04 Gibbs Boiler Room Replace wires from panel box to sump pump in Boiler Room. Wire shorted out. URGENT !!!!!! Boiler Room will be flooded if work not done soon. | |||
| FM-200457737 04 1/27/05 Gibbs Room 124 in the ceiling. Asbestos assessment required. Replace ruptured 3/4" return line in the ceiling. Asbsesos Code A cleared for repairs 12/02/04 DCPS Safety R. Edwards (R. Edwards 12/29/04) | |||
| FM-200502847 05 4/4/05 Gibbs URGENT First, second and third floor restrooms Hot and cold faucets need replacement or fixed throughout building. | |||
| FM-200505289 05 5/31/05 ( GIBBS ) URGENT!!! Outside on Playground 1) Repair hole in fence. ( a child can get cut ) | |||
| FM-200453256 04 7/13/05 Gibbs First floor cafeteria Ceiling tile is wet from roof leak, need to be replaced or repair.Front door needs repairing. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Richard Gibson (RG 08/27/04) | |||
| FM-200221032 /02 10/20/05 (Gibbs) !!!URGENT!!! Heardstart class/Room: Replace wire mesh glass, kicked out by student. | |||
| FM-200221031 /02 10/20/05 (Gibbs) !!!URGENT!!! 3rd Floor/Learning center: Students kicked window out. | |||
| FM-200510668 05 11/28/05 Gibbs Fire Code Violation Third Floor-Safety glass missing from ext. cabinet rm. 300 | |||
| FM-200338950 /03 12/14/05 Gibbs First floor Stairs E St. side Steps broken needs R/R. Safety hazard | |||
| FM-200516368 /05 1/20/06 Very Urgent: Outside on the 19th and Rosedell St. side of the building there is a hang roof over top of the handicap ramp. Over hang has dropped and electrical wires are hanging.. | |||
| FM-200449192 04 1/30/06 (Gibbs) !!!VERY URGENT!!! Basement Office: Restroom toilet needs new spud, water is running on-to floor. | |||
| FM-200514884 /05 1/31/06 Urgent: First Floor-Boys Restroom - No running water in sinks, faucet is broken. | |||
| FM-200514883 /05 1/31/06 Urgent: First Floor-Repair toilet in kitchen restroom. | |||
| FM-200505043 05 1/31/06 ( GIBBS ) URGENT!!! First Floor - Teachers Restroom 1) Repair toilet, it will not flush and keeps running over | |||
| FM-200227232 03 2/2/06 (Gibbs) !!!VERY URGENT!!! 1st Floor/Kitchen: Leaking under sink where dishes are washed. Unable to locate shut-off valve; water is flooding the floors. | |||
| FM-200119832 01 2/3/06 (GIBBS) 1ST FLOOR/ GIRLS AND BOYS BATHROOM NEEDS LATCHES PUT ON BATHROOMS PARTITIONS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/14/01. LEROY MINTON - SAFETY (202)576-6691 | |||
| FM-200449193 04 2/3/06 (Gibbs) !!!VERY URGENT!!! 2nd Floor/Girls Restroom: Toilet needs new handle assessmbly. | |||
| FM-200503422 05 2/9/06 ( Gibbs ) URGENT! First Floor - Hall on Rosedale Side 1) Repair Exit door, it's falling off Code A-clear for repair by DCPS Charles Buchanan on 6/15/05 | |||
| FM-200503423 05 2/9/06 ( Gibbs ) Asbestos Assessment Required URGENT! (1) Repair roof leak, and replace ceiling tile. (2) #124 remove wet carpet ceiling tiles & floor tiles (3) # 301 302 303 remove stained 1x1 and replace. (4) 2nd fl computer rm remove 1x1 stained ceiling tiles and repl 1x1 ceiling tiles near stairwell. (5) eight pieces of floor tiles 2nd fl hall near computer Rm Code A-clear for repair by DCPS Charles Buchanan on 6/15/05 | |||
| FM-200620423 06 3/30/06 Very Urgent Make repairs/replace the front entrance door-Will not close properly Asbestos Code A - Clear for repairs on 03/30/06. Tidewater - Carlos Vera (RG 03/31/06) | |||
| FM-200515004 05 4/25/06 Urgent: Third Floor-Hallway: Repair emergency light, it is out do to a roof leak. | |||
| FM-200214005 02 8/25/06 Gibbs ****Urgent**** 2nd Floor Library Repair or replace leaking convector. | |||
| FM-200448482 04 10/10/06 (Gibbs) Asbestos Assessment Required. 2nd Floor: Replace nosing on steps; needs immediate attention to prevent injury to staff, or student. Asbestos Code A - Clear for repairs on 05/26/04. Horne Engineering - Tony Marcolin ( RG 05/27/04 ) | |||
| FM-200226171 03 1/11/07 Gibbs First floor - 103 Kgn 102, 101, & hallway Mildew smell do to wet ceiling from leaking roof, Kids ie getting sick. Asbestos Code A-clear for repair by DPCS Safety on 2/27/03 Charles Buchanan | |||
| FM-200633937 07 1/29/07 Gibbs Boiler Room Check and repair domestic hot water heater #1 circulating problem. No hot water throughout building. Urgent !!!! Health department will return on Friday January 12, 2007 | |||
| FM-200341666 /03 1/29/07 Gibbs Steps on E St. side Railing is broken need R/R, safety hazard. | |||
| FM-200452177 04 1/31/07 Gibbs First floor front door Can not secure front door, because the bar have come off, this need sudden action. Asbestos Code A - Clear for repairs on 08/13/04. DCPS Safety - Ricardo Eley (RG 08/16/04) | |||
| FM-200452639 04 1/31/07 Gibbs Second Floor - 202 and 207 1) Installing vinyl floor tiles over existing floor tile ( 9x9) , installing hanging blinds and light fixtures and electrical outlets, paint walls. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) | |||
| FM-200452640 04 1/31/07 Gibbs Second Floor - 206 1) Remove all 9x9 floor tile from underneath carpet. Asbestos Code A - Abated on 08/08/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) | |||
| FM-200453255 04 1/31/07 Gibbs First floor front door Front door needs repairing. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Richard Gibson (RG 08/27/04) | |||
| FM-200458745 /04 1/31/07 Gibbs Second floor Stairwell Railing is broken need fixing, a kid was injured. Asbestos Code A - Clear for repairs on 11/29/04. DCPS Safety - Richard GIbson (RG) | |||
| FM-200514882 /05 1/31/07 Urgent: First Floor-Hallway - Door in hallway by rosedale street is falling off the hinges. Asbestos Code A - Clear for repairs on 02/09/06. Tidewater - Tony Marcolin (RG 02/10/06) | |||
| FM-200514885 /05 1/31/07 Urgent: First Floor- Kindergarden Area - Replace ceiling tile it's wet and smell like mildew Asbestos Code A - Clear for repairs on 11/01/05. DCPS Safety - Richard Gibson (RG) | |||
| FM-200449732 04 1/31/07 (Gibbs) !!!VERY URGENT!!! 1st Floor:front door Can not secure front door, because the bar have come off, this need immediadte attention. Asbestos Code A - Clear for repairs on 07/02/04. DCPS Safety - Sylvia Grimes (RG 07/07/04) | |||
| FM-200445099 04 1/31/07 Gibbs First floor chair room Install trap door or access panel in concrete floor inside of chair room near kitchen. NOTE: This work is necessary to cover existing hole in concrete floor that was created to access a steam leak that was capped off but has yet to have been repaired. URGENT Safety Hazard. Asbestos Code A - Clear for repairs on 03/10/04. Horne Engineering - Bjame Smith (RG 03/12/04) |