Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Gibbs Elementary School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200117098 01 8/27/01 (GIBBS) 19TH & ROSEDALE STREET: REPLACE BROKEN WIRE MESH GLASS IN EXTERIOR DOORS IN KITCHEN, DUE TO VANDALISM. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY SG 8/10/01. August 10, 2001 August 27, 2001 17 days
FM-200119884 01 9/26/01 (GIBBS) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ ROOM 312 REPLACE A BROKEN WINDOW PANE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 September 17, 2001 September 26, 2001 9 days
FM-200122218 /01 10/31/01 GIBBS !!!!URGENT!!! FIRST FLOOR - COUNSELORS OFFICE IN STORAGE ROOM 1) LOCK ON STORAGE ROOM DOOR IS STUCK, SHE CANT GET IN TO GET TESTING MATERIALS THAT IS NEEDED FOR TODAY. October 29, 2001 October 31, 2001 2 days
FM-200111310 01 12/5/01 (GIBBS) 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/CHAIR ROOM: WIRE FROM LIGHT SWITCH, EXPOSED. STUDENTS ENTER THE ROOM TO OBTAIN CHAIRS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/14/01. LEROY MINTON - SAFETY (202)576-6691 May 25, 2001 December 5, 2001 194 days
FM-200123865 /01 1/8/02 (GIBBS) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR/ROOM 121 CLASS ROOM DOOR NEEDS REPAIR--IT IS HARD TO OPEN THE DOOR AND IT NEEDS REALIGNMENT. ASBESTOS CODE A-CLEAR FOR REPAIR ON11/29/01 BY DCPS SAFETY CEB November 27, 2001 January 8, 2002 42 days
FM-200123864 /01 2/4/02 (GIBBS) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR/ROOM 101 PANIC BAR WILL NOT RELEASE MAKING THE EXIT DOOR HARD TO GET OUT OF, CREATING A FIRE CODE VIOLATION. ASBESTOS CODE A-CLEAR FOR REPAIR ON11/29/01 BY DCPS SAFETY CEB November 27, 2001 February 4, 2002 69 days
FM-200202437 02 2/8/02 (GIBBS) ASBESTOS ASSESSMENT REQUIRED FLOORS 1, 2 & 3/FIRE DOORS INSTALL WIRE-GLASS & LIGHT KITS IN 26 NEW METAL DOORS ON THE 1ST, 2ND & 3RD FLOORS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/05/02. RICHARD GIBSON - SAFETY (202)576-5584 February 5, 2002 February 8, 2002 3 days
FM-200203548 02 2/27/02 (Gibbs) ***Urgent*** 3rd Floor Reading Lab "A" A child broke the window glass in reading Lab A and needs to be replaced. February 27, 2002 February 27, 2002 0 days
FM-200117395 01 4/11/02 GIBBS PLAYGROUND REMOVE PLAYGROUND EQUIPMENT BURNED BY VANDALS. SAFETY HAZARD FOR CHILDERN. August 14, 2001 April 11, 2002 240 days
FM-200209206 02 6/7/02 Gibbs ****Urgent**** Exterior Grounds Due to storm, a tree has fallen down on the east-side of the building and needs removal. POC: Mr. Manigan June 7, 2002 June 7, 2002 0 days
FM-200205428 02 9/3/02 Gibbs Third Floor 1) Restoration required on the floor tile in the hallway. The work to be performed by DCPS Structural Maintenance. Poc: William Moody - 202-439-8268 Asbestos Code A - Clear For Repairs On 04/04/02. DCPS Safety - Sheila R Howard(RG 04/04/02) April 4, 2002 September 3, 2002 152 days
FM-200208696 02 9/4/02 Gibbs ****Urgent**** Outside Drain Near Boiler Room Exit Door Drain is backed up and harboring mosquitos [health hazard]. May 30, 2002 September 4, 2002 97 days
FM-200212651 02 9/15/02 Gibbs First Floor - Room 128 1) Broken floor tile called in by principal Charles Buchanan, DCPS Safety took the call. Poc: Linda Satterwaite Asbestos Code A - Clear for repairs. Abated on 07-31-02 (LM) per Leroy Minton confirmation. Safety Office 202-576-8962. July 23, 2002 September 15, 2002 54 days
FM-200209650 02 11/1/02 (Gibbs) ****Emergency**** 1st Floor/Near room #128: Light fixture hanging from ceiling, wires expose. (This is a safety hazard) June 17, 2002 November 1, 2002 137 days
FM-200217899 02 1/22/03 Gibbs ****Urgent**** 1st Floor Boys' Restroom Repair broken/cracked urinal. Water is running onto the floor daily. POC: Mr. Manigan September 19, 2002 January 22, 2003 125 days
FM-200119882 01 1/23/03 (GIBBS) ASBESTOS ASSESSMENT REQ. 3ND FLOOR/ CORRIDOR REPLACE ONE (1) PORCELIAN WATER FOUNTAIN WITH A NEW WATER COOLER (WALL MOUNTED). This work order was a Code - A until it was discovered wall penetration became necessary. Exploratory necessary / Leroy Minton Jr. Safety Office (202)-576-6289. Asbestos Code A - Clear for repairs on 12/07/02. Horne Engineering -Philp Connolly (RG 12/12/02) September 17, 2001 January 23, 2003 493 days
FM-200226178 03 3/18/03 Gibbs Thirdt floor - room 302 Windows broken out Safety hazard. February 25, 2003 March 18, 2003 21 days
FM-200227286 03 3/31/03 Gibbs Outside Rosedale street Around dumpster pipes and fence needs removed. Safety Hazard March 19, 2003 March 31, 2003 12 days
FM-200224280 03 3/31/03 Gibbs First floor - Kgn Front door to classroom and their bathroom is falling off the hinges. Asbestos Code A-clear for by Safety Office on 01/29/03 Charles Buchanan January 21, 2003 March 31, 2003 69 days
FM-200222375 /02 4/25/03 Gibbs Principal's office,1st floor, room 121, and vice Principal' office 1. Asbestos assessment required., 2. Repair or replace stopped up coils in the following areas, Principal's office ,room 121,and the vice Principal's office,engineer attemped to back flush with no success. 3. Principal's office check status of pneumatic valve (HVAC Shop) Point of contact: Mr. C. Bradley (202) 438-7437 Please call proir to going to tthe site. Asbestos Code B by Horne Engineer Philp Connolly DCPS Charles Buchanan on 12/30/02 Code A - Asbestos abated on 02/10/03 PER Ronald Edwards - Safety confrimation (RG 02/12/03) December 11, 2002 April 25, 2003 135 days
FM-200208069 02 4/29/03 Gibbs ****Urgent**** Outside Playground Remove playground equipment which poses safety hazards. May 20, 2002 April 29, 2003 344 days
FM-200333749 03 7/24/03 (Gibbs) !!!VERY URGENT!!! Boiler Room: Water building up; sump pump is not pumping water out; water has flooded the floor. July 24, 2003 July 24, 2003 0 days
FM-200216326 02 8/7/03 (GIBBS) Asbestos Assessment Reqd. 1st & 2nd Floors/Library & Pre-K Area Install window a/c units in pre-k and library areas [units are on site]. POC: Mr. Manigan Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) September 3, 2002 August 7, 2003 338 days
FM-200332970 03 8/8/03 (Gibbs) !!!VERY URGENT!!! 1st Floor/Hallway: Exposed wire in main hallway that needs to be removed. (Safety Hazard) July 7, 2003 August 8, 2003 32 days
FM-200334622 03 8/27/03 Gibbs Outside kitchen Need grates fabricated for driveway to kitchen, is missing. Safety Hazard A kid has gotten hurt. August 7, 2003 August 27, 2003 20 days
FM-200338271 03 10/3/03 Gibbs Third floor room 304 Lock on classroom door keep jamming causing a safety violation for kids. September 30, 2003 October 3, 2003 3 days
FM-200218802 02 3/9/04 Gibbs !!!VERY URGENT!!! Asbestos Assessment Required. Second floor - Room 200 Classroom door needs repaired, will not close. October 3, 2002 March 9, 2004 523 days
FM-200227958 03 3/10/04 (Gibbs) 1st Floor Kindergarten/Room #103: Restroom door is falling. (Hinges needed) !!Safety Hazard!! code A-clear for repair by DCPS Charles Buchanan on 4/02/03 March 31, 2003 March 10, 2004 345 days
FM-200332968 03 3/10/04 (Gibbs) !!!VERY URGENT!!! 1st Floor/Back Door on Rosedale Street Side: Repair or replace door that has a large hole in it. This must has been caused in an attempted break-in. This hole is large enough to reach the lock inside to open the door; door need to be secured. Asbestos Code A - Clear for repairs on 07/08/03. Horne Engineering - Philp Connolly (RG 07/08/03) July 7, 2003 March 10, 2004 247 days
FM-200227289 03 3/10/04 Gibbs URGENT First floor kitchen The rear doors are damaged need repair or replacing will not open. Fire C0de Violation. March 19, 2003 March 10, 2004 357 days
FM-200227089 03 3/10/04 (Gibbs) !!!VERY URGENT!!! Asbestos Assessment Required. 1st Floor/Kitchen: Repair or replace kitchen exterior door; unable to lock. Asbestos Code A - Clear for repairs on 03/19/03. Horne Engineering - Bipin Nanavaty (RG 03/20/03) March 14, 2003 March 10, 2004 362 days
FM-200219650 /02 3/10/04 (Gibbs) !!!VERY URGENT!!! Room #101/Kindergarten room: As light switch was turned on, fire ignighted from the ballast. There is a burning smell present, and sparks appear each time lights switch is turned on. October 18, 2002 March 10, 2004 509 days
FM-200445448 04 3/30/04 Gibbs Roof Repair or replace cooling tower busted water supply line. Size: 1 1/2" P S: This water fills up the roof and runs down in the top floor classroom. Urgent !!!!! March 16, 2004 March 30, 2004 14 days
FM-200340872 03 4/8/04 Gibbs First floor kitchen Sink in kitchen is leaking at the trap causing safety problem. December 1, 2003 April 8, 2004 129 days
FM-200446619 04 4/13/04 GIBBS boiler room URGENT ATTENTION is needed Repair/replace inoperable sump pumps boiler room will flood. April 13, 2004 April 13, 2004 0 days
FM-200334561 03 4/19/04 (Gibbs) FIRE CODE VIOLATIONS: Through-Out: Fire extinguishers cabinet, safety glass on 1st, 2nd, & 3rd floor. August 6, 2003 April 19, 2004 257 days
FM-200450528 04 7/20/04 Gibbs Boiler Room Replace wires from panel box to sump pump in Boiler Room. Wire shorted out. URGENT !!!!!! Boiler Room will be flooded if work not done soon. July 20, 2004 July 20, 2004 0 days
FM-200457737 04 1/27/05 Gibbs Room 124 in the ceiling. Asbestos assessment required. Replace ruptured 3/4" return line in the ceiling. Asbsesos Code A cleared for repairs 12/02/04 DCPS Safety R. Edwards (R. Edwards 12/29/04) November 1, 2004 January 27, 2005 87 days
FM-200502847 05 4/4/05 Gibbs URGENT First, second and third floor restrooms Hot and cold faucets need replacement or fixed throughout building. March 17, 2005 April 4, 2005 18 days
FM-200505289 05 5/31/05 ( GIBBS ) URGENT!!! Outside on Playground 1) Repair hole in fence. ( a child can get cut ) May 9, 2005 May 31, 2005 22 days
FM-200453256 04 7/13/05 Gibbs First floor cafeteria Ceiling tile is wet from roof leak, need to be replaced or repair.Front door needs repairing. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Richard Gibson (RG 08/27/04) August 24, 2004 July 13, 2005 323 days
FM-200221032 /02 10/20/05 (Gibbs) !!!URGENT!!! Heardstart class/Room: Replace wire mesh glass, kicked out by student. November 14, 2002 October 20, 2005 1,071 days
FM-200221031 /02 10/20/05 (Gibbs) !!!URGENT!!! 3rd Floor/Learning center: Students kicked window out. November 14, 2002 October 20, 2005 1,071 days
FM-200510668 05 11/28/05 Gibbs Fire Code Violation Third Floor-Safety glass missing from ext. cabinet rm. 300 August 17, 2005 November 28, 2005 103 days
FM-200338950 /03 12/14/05 Gibbs First floor Stairs E St. side Steps broken needs R/R. Safety hazard October 15, 2003 December 14, 2005 791 days
FM-200516368 /05 1/20/06 Very Urgent: Outside on the 19th and Rosedell St. side of the building there is a hang roof over top of the handicap ramp. Over hang has dropped and electrical wires are hanging.. December 12, 2005 January 20, 2006 39 days
FM-200449192 04 1/30/06 (Gibbs) !!!VERY URGENT!!! Basement Office: Restroom toilet needs new spud, water is running on-to floor. June 10, 2004 January 30, 2006 599 days
FM-200514884 /05 1/31/06 Urgent: First Floor-Boys Restroom - No running water in sinks, faucet is broken. October 31, 2005 January 31, 2006 92 days
FM-200514883 /05 1/31/06 Urgent: First Floor-Repair toilet in kitchen restroom. October 31, 2005 January 31, 2006 92 days
FM-200505043 05 1/31/06 ( GIBBS ) URGENT!!! First Floor - Teachers Restroom 1) Repair toilet, it will not flush and keeps running over May 2, 2005 January 31, 2006 274 days
FM-200227232 03 2/2/06 (Gibbs) !!!VERY URGENT!!! 1st Floor/Kitchen: Leaking under sink where dishes are washed. Unable to locate shut-off valve; water is flooding the floors. March 18, 2003 February 2, 2006 1,052 days
FM-200119832 01 2/3/06 (GIBBS) 1ST FLOOR/ GIRLS AND BOYS BATHROOM NEEDS LATCHES PUT ON BATHROOMS PARTITIONS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/14/01. LEROY MINTON - SAFETY (202)576-6691 September 14, 2001 February 3, 2006 1,603 days
FM-200449193 04 2/3/06 (Gibbs) !!!VERY URGENT!!! 2nd Floor/Girls Restroom: Toilet needs new handle assessmbly. June 10, 2004 February 3, 2006 603 days
FM-200503422 05 2/9/06 ( Gibbs ) URGENT! First Floor - Hall on Rosedale Side 1) Repair Exit door, it's falling off Code A-clear for repair by DCPS Charles Buchanan on 6/15/05 March 30, 2005 February 9, 2006 316 days
FM-200503423 05 2/9/06 ( Gibbs ) Asbestos Assessment Required URGENT! (1) Repair roof leak, and replace ceiling tile. (2) #124 remove wet carpet ceiling tiles & floor tiles (3) # 301 302 303 remove stained 1x1 and replace. (4) 2nd fl computer rm remove 1x1 stained ceiling tiles and repl 1x1 ceiling tiles near stairwell. (5) eight pieces of floor tiles 2nd fl hall near computer Rm Code A-clear for repair by DCPS Charles Buchanan on 6/15/05 March 30, 2005 February 9, 2006 316 days
FM-200620423 06 3/30/06 Very Urgent Make repairs/replace the front entrance door-Will not close properly Asbestos Code A - Clear for repairs on 03/30/06. Tidewater - Carlos Vera (RG 03/31/06) March 28, 2006 March 30, 2006 2 days
FM-200515004 05 4/25/06 Urgent: Third Floor-Hallway: Repair emergency light, it is out do to a roof leak. November 2, 2005 April 25, 2006 174 days
FM-200214005 02 8/25/06 Gibbs ****Urgent**** 2nd Floor Library Repair or replace leaking convector. August 12, 2002 August 25, 2006 1,474 days
FM-200448482 04 10/10/06 (Gibbs) Asbestos Assessment Required. 2nd Floor: Replace nosing on steps; needs immediate attention to prevent injury to staff, or student. Asbestos Code A - Clear for repairs on 05/26/04. Horne Engineering - Tony Marcolin ( RG 05/27/04 ) May 25, 2004 October 10, 2006 868 days
FM-200226171 03 1/11/07 Gibbs First floor - 103 Kgn 102, 101, & hallway Mildew smell do to wet ceiling from leaking roof, Kids ie getting sick. Asbestos Code A-clear for repair by DPCS Safety on 2/27/03 Charles Buchanan February 25, 2003 January 11, 2007 1,416 days
FM-200633937 07 1/29/07 Gibbs Boiler Room Check and repair domestic hot water heater #1 circulating problem. No hot water throughout building. Urgent !!!! Health department will return on Friday January 12, 2007 January 11, 2007 January 29, 2007 18 days
FM-200341666 /03 1/29/07 Gibbs Steps on E St. side Railing is broken need R/R, safety hazard. December 16, 2003 January 29, 2007 1,140 days
FM-200452177 04 1/31/07 Gibbs First floor front door Can not secure front door, because the bar have come off, this need sudden action. Asbestos Code A - Clear for repairs on 08/13/04. DCPS Safety - Ricardo Eley (RG 08/16/04) August 11, 2004 January 31, 2007 903 days
FM-200452639 04 1/31/07 Gibbs Second Floor - 202 and 207 1) Installing vinyl floor tiles over existing floor tile ( 9x9) , installing hanging blinds and light fixtures and electrical outlets, paint walls. Asbestos Code A - Clear for repairs on 08/23/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) August 13, 2004 January 31, 2007 901 days
FM-200452640 04 1/31/07 Gibbs Second Floor - 206 1) Remove all 9x9 floor tile from underneath carpet. Asbestos Code A - Abated on 08/08/04. DCPS Safety - Leroy Minton Jr. (RG 08/23/04) August 13, 2004 January 31, 2007 901 days
FM-200453255 04 1/31/07 Gibbs First floor front door Front door needs repairing. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Richard Gibson (RG 08/27/04) August 24, 2004 January 31, 2007 890 days
FM-200458745 /04 1/31/07 Gibbs Second floor Stairwell Railing is broken need fixing, a kid was injured. Asbestos Code A - Clear for repairs on 11/29/04. DCPS Safety - Richard GIbson (RG) November 29, 2004 January 31, 2007 793 days
FM-200514882 /05 1/31/07 Urgent: First Floor-Hallway - Door in hallway by rosedale street is falling off the hinges. Asbestos Code A - Clear for repairs on 02/09/06. Tidewater - Tony Marcolin (RG 02/10/06) October 31, 2005 January 31, 2007 457 days
FM-200514885 /05 1/31/07 Urgent: First Floor- Kindergarden Area - Replace ceiling tile it's wet and smell like mildew Asbestos Code A - Clear for repairs on 11/01/05. DCPS Safety - Richard Gibson (RG) October 31, 2005 January 31, 2007 457 days
FM-200449732 04 1/31/07 (Gibbs) !!!VERY URGENT!!! 1st Floor:front door Can not secure front door, because the bar have come off, this need immediadte attention. Asbestos Code A - Clear for repairs on 07/02/04. DCPS Safety - Sylvia Grimes (RG 07/07/04) June 24, 2004 January 31, 2007 951 days
FM-200445099 04 1/31/07 Gibbs First floor chair room Install trap door or access panel in concrete floor inside of chair room near kitchen. NOTE: This work is necessary to cover existing hole in concrete floor that was created to access a steam leak that was capped off but has yet to have been repaired. URGENT Safety Hazard. Asbestos Code A - Clear for repairs on 03/10/04. Horne Engineering - Bjame Smith (RG 03/12/04) March 9, 2004 January 31, 2007 1,058 days

© The Washington Post Company