Urgent Open Repair Requests

See Also: All Open Repair Requests at Gibbs Elementary School

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200216320 9/3/02 (GIBBS) Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors Throughout Building Exterior doors need to be sealed for safety. POC: Mr. Manigan Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) September 3, 2002
FM-200220072 10/25/02 Gibbs Third floor - Room 304 Repair in the wall. Asbestos Code A - Clear for repairs on 10/28/02. DCPS Safety - Leroy Minton Jr. (RG 10/29/02) October 25, 2002
FM-200226014 2/21/03 (Gibbs) !!!URGENT!!! 1st Floor/Room #103: Ceiling leak, possible leak from the roof that is steady dripping. February 21, 2003
FM-200333173 7/10/03 (Gibbs) !!!URGENT!!! Roof Top/East Wing: Please check roof drain on roof, east wing. There is a large amount of standing water on the roof. July 10, 2003
FM-200445169 3/10/04 (Gibbs) !!!URGENT!!! Asbestos Assessment Required. Kitchen Storage Room: Replace entrance door to the kitchen storeroom Code A with condition - Do not disturb the insulation Horne Engineering - Philp Connolly (RG 03/10/04) March 10, 2004
FM-200447171 4/26/04 Gibbs First and third floor custodian closets Doors are falling off need replacing or repairing. Safety hazard Asbestos Code A - Clear for repairs on 04/26/04. Horne Engineering - Ed Rodriguez (RG 04/27/04) April 26, 2004
FM-200448480 5/25/04 (Gibbs) !!!URGENT!!! 1st Floor/Main Office: Airconditioner leaking, and flooding the floor. May 25, 2004
FM-200449194 6/10/04 (Gibbs) !!!VERY URGENT!!! 1st Floor: rooms 126, 206, 124, 128 and library Condensation wetting floors, damaging asbestos floor (9 X 9) tile. Asbestos Code A - Clear for repairs on 07/20/04. ( To stop condensation wetting floors ONLY ) DCPS Safety - Leroy Minton Jr. (RG 07/20/04) !! NOT FOR FLOOR TILES !! June 10, 2004
FM-200455819 9/27/04 Gibbs First floor multi purpose room Stained window panes need to be replace in thru out multi purpose in time for graduation that will be om June 21, 2004. Asbestos Code A - Clear for repairs on 10/04/03. DCPS Safety - Leroy Minton (RG 10/06/04) September 27, 2004
FM-200455830 9/27/04 Gibbs First floor boys restroom Ceiling is peeling in need for repairs. Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/06/04) September 27, 2004
FM-200456072 9/29/04 Gibbs Second floor room 204 Need work permit for renovation for classroom. Asbestos Code A - Clear for repairs on 10/04/03. DCPS Safety - Leroy Minton (RG 10/06/04) September 29, 2004
FM-200456073 9/29/04 Gibbs First floor Assistant principal office Work permit for newly installed lights to be put in. Asbestos Code A - Clear for repairs on 10/04/03. DCPS Safety - Leroy Minton (RG 10/06/04) September 29, 2004
FM-200456075 9/29/04 Gibbs First floor room 131 Need new lights to be installed and room to be painted.4 Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/06/04) September 29, 2004
FM-200458149 11/10/04 Gibbs Outside Concrete sidewalk is safety hazard need repaired, by outside of cafeteria. November 10, 2004
FM-200458741 11/29/04 Gibbs Fourth floor going to the roof Window is broken out need fixing. Asbestos Code A - Clear for pairs on 12/02/04. DCPS Safety - Leroy Minton Jr (RG 12/02/04) November 29, 2004
FM-200502164 3/2/05 Gibbs Third floor hall Need window replace, befor it fall and hurt someone. March 2, 2005
FM-200505643 5/18/05 Gibbs Boiler Room Repair or replace domestic hot water heater. No hot water in building. Hot water heater got wet from flood in boiler room. Urgent !!!!! May 18, 2005
FM-200507252 6/29/05 !!Urgent!! Third Floor Room 300 Replace the glass in the door, its been broken out Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 June 29, 2005
FM-200507443 7/5/05 !!Urgent!! Second Floor - Room 202 Replace the last window on the right, it has been broken July 5, 2005
FM-200507445 7/5/05 Urgent! First Floor - Room 103 Replace broken window July 5, 2005
FM-200507508 7/6/05 URGENT First Floor - Room 131 Top windows need lock grips fixed. July 6, 2005
FM-200507509 7/6/05 URGENT Second Floor - Room 200 Replace/Repair broken window July 6, 2005
FM-200507511 7/6/05 URGENT Third Floor - Room 300 There are three window panes broken, and the class door window is broken out. July 6, 2005
FM-200507512 7/6/05 URGENT Third Floor - Room 304 Replace broken upper window July 6, 2005
FM-200508191 7/20/05 Gibbs Emergency!!! Second Floor Computer Room A pipe burst in the ceiling and water is leaking on the carpet Immediate request for wet vacuum/extractor and two (2) possibly (3) dehumidifiers from Building Service Manager. DCPS Safety (RE) Asbestos Code A - Clear for repairs on 07/20/05. Tidewater - Philp Connolly (RG 07/20/05) July 20, 2005
FM-200512739 9/16/05 Gibbs Playground-Repair broken swings "safety hazard" September 16, 2005
FM-200515005 11/2/05 Urgent: Second Floor-Storage Room: Repair ceiling it is damaged from roof leak Asbestos Code C - on 11/07/05. Tidewater - Philp Connoll (RG 11/09/05) November 2, 2005
FM-200515006 11/2/05 Urgent: A row of lights are out in the kitchen on the first floor. November 2, 2005
FM-200619641 3/8/06 Urgent First Floor-Cafeteria Lights out needs a scalfal to put lights in March 8, 2006
FM-200620958 4/5/06 Gibbs Boiler Room Repair or replace domestic hot water circulating pump. No hot water in building. Urgent !!!!! April 5, 2006
FM-200621303 4/13/06 Asbestos Assessment Required. First floor, All exit doors. Need carpenters to secure all threshold plates on first floor exit doors, this is a safety issue. April 13, 2006
FM-200627699 8/16/06 First Floor/Missing ceiling tile over rm. 102 Asbestos Code A - Clear for repairs on 08/16/06. DCPS Safety - Richard Gibson (RG 08/15/06) August 16, 2006
FM-200629147 9/11/06 1st Floor- Main Lobby Replace wet ceiling tile. Asbestos Code A - Clear for repairs on 09/12/06. DCPS Safety - Richard Gibson (RG) September 11, 2006
FM-200630920 10/18/06 Replace ceiling tile in rm. 121. Ceiling tile damaged due to flood on the third floor. The ceiling list no asbestos HA ou9 Ceiling tile white...with pinholes. Asbestos Code A - Clear for repairs on 10/17/06. DCPS Safety - Charles Buchanan (RG 10/18/06) October 18, 2006
FM-200702203 3/19/07 Location: 2nd Floor Room: 206 Replace broken door glass. The door with the wire. Safety Hazard Asbestos Code A - Clear for repairs on 03/20/07. Tidewater - Shamika Parker (RG 03/21/07) March 19, 2007