| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200119572 01 9/17/01 (GREEN) PLAYGROUND !!!!!!!!!!! URGENT !!!!!!!!!!!!!!! REMOVE (2) TWO BOLTS THAT ARE STICKING OUT OF THE GROUND IN THE PLAY AREA. BOLTS CAN CAUSE SERIOUS INJURY IF A STUDENT SHOULD FALL. | |||
| FM-200122789 01 11/19/01 (GREEN) ASBESTOS ASSESSMENT REQ. 1ST AND 2ND FLOOR/ BOYS TOLIET SNAKE OUT (3) URINALS. (1) IN 1ST FLOOR BOYS TOILET AND (1) IN 2ND FLOOR BOYS TOILET. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/02/01. LEROY MINTON- SAFETY (202)576-6691(RG) | |||
| FM-200123622 /01 1/10/02 (GREEN) ASBESTOS ASSESSMENT REQUIRED 2ND FLOOR/STAIRWAY "B" MAIN REHANG STAIRWAY DOOR--HOLES HAVE ENLARGED ON TOP HINGE AND DOOR IS NO LONGER SECURE. DOOR HAS DROPPED, CREATING A SAFETY HAZARD. ASBESTOS CODE A-CLEAR FOR REPAIR ON 12/10/01BY HORNE ENGINEER: Z MAHMOOD | |||
| FM-200203362 02 2/27/02 (Green) 3rd floor/ Hallway at water cooler !!! Very Urgent !!! Repair leaking supply line to cooler. Leak is behind shut-off valve to cooler. | |||
| FM-200209188 02 6/12/02 Green ****Urgent**** Repair sink in room 108 where the water is running from under it onto the classroom floor. | |||
| FM-200206733 02 7/15/02 (Green) 1. Asbestos assessment required. 1st floor/boys toilet: Unstop two (2) urinals in the boys toilet; plunger did not open line. Asbestos Code A - Clear for repairs on 04/26/02. DCPS Safety - Richard Gibson (RG 04/26/02) | |||
| FM-200213991 02 8/27/02 Green ****Urgent**** Kitchen Replace faucet in the main kitchen. There is a steady stream of hot water coming out at all times. | |||
| FM-200219955 /02 10/28/02 Green Urgent!!! New lock and keys for room 107. This room is occupied by the St. John Community School per lease agreement with DCPS. They must be able to secure their property. | |||
| FM-200213992 02 10/31/02 Green ****Urgent**** 2nd & 3rd Floor Boys' and Girls' Restrooms 1. Repair two urinals in the 3rd floor boys' restroom, and snake out 3 toilets in area #314/3rd floor boys' restroom; 2. Snake out 2 urinals in the 2nd floor boys' restroom, and snake out three toilets in the 2nd floor girls' [space 211] girls' restroom; and 3. Repair one urinal in the 1st floor boys' restroom on the lobby level. | |||
| FM-200225130 03 2/4/03 GREEN boiler room "URGENT" BOILER ROOM WILL FLOOD Repair/replace ruptured (2) two inch nipple on discharge line from sump pump. Replace (2) two cracked floor plugs to drains that are no longer used due to boiler room reconstruction. Plugs needed to prevent boiler room from flooding. | |||
| FM-200226540 03 3/20/03 Green Room 304 and 206 Replace safety glass window entrance. Both window size 17 3/3x43 3/4 | |||
| FM-200214794 02 4/11/03 Green F-110.1(8) Fire Code Violation 1st Floor Room 105 Wall breach,replace three cinder blocks . Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/20/02) | |||
| FM-200205881 02 4/29/03 Green Outside - Playground Area Repair Five (5) Section of chain link fence at Playground area. Fence have come from pole. Safety Hazard. | |||
| FM-200206935 02 4/29/03 1. Asbestos assessment required. Outside/back of building: Repair chain link fence back of building, parking area. (Fence size 42") Asbestos Code A - Clear for repairs on 05/01/02. DCPS Safety - Richard Gibson (RG 05/01/02) | |||
| FM-200329441 03 5/2/03 (Green) !!!VERY URGENT!!! 1st Floor/Hallway: Water backing up through water fountain drain, water line has been off, and water continues to run. (Engineer attempting to prevent water from flooding the floors) near maintenance office. | |||
| FM-200333688 03 8/18/03 (Green) FIRE CODE VIOLATION: 3rd Floor/Stairwell B: Door defective. Code A-clear for repair by Safety Office Charles Buchanan on 7/28/03 | |||
| FM-200337867 03 9/26/03 (Green) !!!URGENT!!! 1st Floor/Kitchen: Electrical wire hanging from ceiling; this is a safety hazard, as this wire could come down completely, and staff or students could be subject to electrical injury. | |||
| FM-200331612 03 12/3/03 Green First Floor - Multi Purpose Room Replace two (2) switches for window a/c units in the multi purpose room . Asbestos Code A - Cleared for repairs by Leroy Minton Jr on 06-11-03 (LM/06-11-03) Safety Office 202-576-8962. | |||
| FM-200338618 03 1/6/04 (Green) !!!URGENT!!! Room 105 and 309 Repair lights in rooms 309 and 105, Lights will not come on. | |||
| FM-200221381 /02 3/2/04 Green Exterior of bldg. Install a safety barrier around gas meter. | |||
| FM-200450397 04 12/7/04 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 2nd Floor/Room #208: Repair door hardware. Asbestos Code A - Clear for repairs on 07/23/04. DCPS Safety - Leroy Minton Jr. (RG 07/28/04) | |||
| FM-200450587 04 1/12/05 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 1st Floor/Room #105: Repair one (1) damaged ceiling tile. Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200504829 05 10/17/05 (Green) "Urgent" Second floor, Boys' Restroom. Repair leaking commode. Causing damage to ceiling in 1st floor restroom. | |||
| FM-200450392 04 12/27/05 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 1st Floor/Room #111 Damaged ceiling tile. Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Richard Gibson (RG 07/20/04) | |||
| FM-200450589 04 12/27/05 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 1st Floor/Auditorium: Replace ceiling tiles. (Total of 11) Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200450396 04 12/27/05 (Green) FIRE CODE VIOLATION: 2nd Floor/Library: Door closer broken. Asbestos Code A - Clear for repairs on 07/22/04. DCPS Safety - Leroy Minton Jr. (RG 07/28/04) | |||
| FM-200450391 04 12/27/05 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 1st Floor/Room #110 Total of three (3) ceiling tiles missing. Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Richard Gibson (RG 07/20/04) | |||
| FM-200450390 04 12/27/05 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 1st Floor/Room #109: Replace missing ceiling tiles. Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Richard Gibson (RG 07/20/04) | |||
| FM-200450389 04 12/27/05 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 1st Floor/Room #108: Replace missing ceiling tiles Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Richard Gibson (RG 07/20/04) | |||
| FM-200450388 04 12/27/05 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 2nd Floor Library: Replace missing ceiling tiles. Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Richard Gibson (RG 07/20/04) | |||
| FM-200450387 04 12/27/05 (Green) FIRE CODE VIOLATION: Asbestos Assessment Required. 2nd Floor/Exit Near Room #222: Tiles missing at 2nd floor exit. Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Richard Gibson (RG 07/20/04) | |||
| FM-200116628 01 2/3/06 GREEN OUTSIDE RUN OFF DRAIN ASBESTOS ASSESSMENT REQUIRED OPEN OR UNSTOP DRAIN TO RUN OFF DITCH BEHIND PLAYGROUND & PARKING LOT AREA. THERE IS A LOT OF STANDING WATER. STAFF HAS REMOVED TRASH & DEBRIS. ASBESTOS CODE A-CLEAR FOR REPAIR BY 10/29/01 DCPS SAFETY : SRH | |||
| FM-200442742 04 3/6/06 Green Second and third floor stairway B Repair two (2) stairway doors. Doors have come off the hinges, one door second floor stairway B. Other door third floor stairway B. Call from engineer making inquiry as too the repair date. Indicated not clear for repairs. ((VERY URGENT) Asbestos Code A - Clear for repairs on 01/22/04. Horne Engineering - Bipin Nanavaty (RG 01/23/04) | |||
| FM-200217459 02 3/6/06 (GREEN) 2nd Floor Library [216] Repair or replace door closer in room 216 [library]---screws have pulled out of the door. Asbestos Code A - Cleared for repairs 09-17-02 by Leroy Minton Jr. (LM / 09-19-02) Safety Office 202-576-8962. | |||
| FM-200450527 04 3/6/06 Green Second floor library Install door closer on library door. Asbestos Code A - Clear for repairs on 07/22/04. DCPS Safety - Leroy Minton Jr. (RG 07/28/04) | |||
| FM-200205743 02 3/6/06 Green Outside Front of Building Install Light outside Front of Building, light is to shine on Flag. Safety Hazard. | |||
| FM-200116769 01 4/14/06 GREEN FIRST (1ST) FLOOR - ROOM #133A AND #106 1) ASBESTOS ASSESSMENT REQUIRED. 2) REPAIR HOLES IN CINDER BLOCK WALL IN ROOMS AREA. ROOM # 106 - 12" X 24" ROOM # 133A - 5" X 16" CODE A-CLEAR FOR REPAER BY DCPS SAFETY LM 8/7/01. | |||
| FM-200116184 01 4/14/06 GREEN ROOM 133A - ASST. PRINCIPALS ASBESTOS ASSESSMENT REQUIRED REPAIR HOLE IN CINDER BLOCK WALL. HOLE SIZE 5"x16" IN ASST. PRINCIPAL OFFICE ROOM 133A. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/01/01. RONALD EDWARD - SAFETY (202)576-6693 (RG) | |||
| FM-200116182 01 4/18/06 GREEN GIRLS TOILET (LOBBY) ASBESTOS ASSESSMENT REQUIRED REPAIR HOLE IN WALL IN GIRLS TOILET. CINDER BLOCK WALL HOLE SIZE 12"x24" CINDER BLOCK. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/01/01. RONALD EDWARD - SAFETY (202)576-6693 (RG) | |||
| FM-200620160 06 1/22/07 Very Urgent Second Floor Stairway Door-Re hang door, screws are broken and the door is about to fall. Asbestos Code A - Clear for repairs on 03/22/06. Tidewater - Carlos Vera (RG 03/24/06) | |||
| FM-200619779 06 1/22/07 Seccond floor, Stairwell. Repair or Replace hinges on doors. Note: The doors are hanging off of the hinges and are about to fall, this is an issue of safety. | |||
| FM-200516425 /05 1/24/07 Urgent: Repair or replace the outside lights at the main entrance. | |||
| FM-200618417 06 1/24/07 Exterior, Main Entrance. Repair or Replace outside lights at main entrance and over shed. Note: Both areas are dark. (SAFETY HAZARD) | |||
| FM-200620072 06 1/26/07 Green Boiler room Urgent!!!!!! Repair ruptured 1/2" copper elbow on the # 3 house pump , the valve are not holding. | |||
| FM-200456345 04 1/26/07 Green Outside over entrance Repair light over entrance door near parking area. Cover broken and bulb missing. Asbestos Code A - Clear for repairs on 10/01/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200628738 06 1/26/07 Green Boiler room URGENT!!!!!!!!!!! Repair or replace (2) drop-in sump pumps & (1) sewage injection pump, existing pump is burnt out, water is rising in the boiler room. | |||
| FM-200633852 9/07 1/26/07 GREEN ES Room 107 and 116 Asbestos assessment may be required plaster ceiling and pipe insulation room 107 and 116. Forward to steamfitters to repair leaks on heating hot water supply/return lines. Asbestos Code C on 01/10/07. Tidewater - Tony Marcolin (RG 01/12/07) Asbestos Code A - Abated and cleared for repairs on 01/11/07 by Goel Construction (LM/02-08-07) Safety Office 202-576-8962 | |||
| FM-200331574 03 1/26/07 Green Outside west end of bldg. Repair hole in west end of bldg. above exit door. Birds are coming in school. Asbestos Code A - Cleared for repairs by Leroy Minton Jr on 06-11-03 (LM/06-11-03) Safety Office 202-576-8962. | |||
| FM-200514929 05 1/26/07 Stairway-A, B, and C - Repair or Replace treads on steps. Some are missing, Safety Hazard | |||
| FM-200516426 /05 1/26/07 Urgent: Repair or replace the outside lights at the back of the building near the dumpster area. | |||
| FM-200618982 06 1/26/07 Asbestos Assessment Required. Cafeteria Area/Multi-Purpose Room. Repair breach in wall, currently electrical wiringis exposed. Note: This is a safety hazard. Asbestos Code A - Cleared for repairs on 02-28-06 by Meneka Rodrigo/Tidewater (LM-02/28-06) Safety Office 202-576-8962. | |||
| FM-200225718 03 1/26/07 Green Third floor Stairway "A" Rehang rail on landing. Rail have come loose from wall ad floor. Safety Hazard Asbestos Code A - Clear for repairs on 02/13/03. Horne Engineering - Sharon Voss (RG 02/14/03) | |||
| FM-200509699 05 1/26/07 GREEN ES main office suite Replace missing and/or rusted out drip pans on univents to prevent condensate from leaking out onto floor causing a potential safety hazard. | |||
| FM-200451853 04 1/26/07 Green First floor boys toilet Repair 2'x2' hole in plaster ceiling. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Richard Gibson (RG) | |||
| FM-200700113 1/07 2/26/07 Lunchroom - URGENT- NO HEAT - 54df - Remove control valve and straight pipe line direct to AHU coil , there is no heating hot water flow through coil to prevent heat to lunchroom and kitchen. Or repipe air handler unit to heating hot water source for heat to lunchroom Second Request First Request was close out. | |||
| FM-200700023 9/07 3/6/07 Boiler room - URGENT - Correct existing problems with boiler # 4 that continuously fails to flame failure. Boiler # 3 still awaiting parts. |