Description Open Date Close Date Time Elapsed
FM-200121908 /01 10/26/01 (HARDY) 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/GIRLS BATHROOM: ALL GIRLS BATHROOMS ON 1ST FLOOR NEED 1 1/4 EXTENSION TAIL PIECE (CHROME/REPLACED ALONG WITH NUTS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/23/01. LEROY MINTON - SAFETY (202)576-6691 (RG October 18, 2001 October 26, 2001 8 days
FM-200125943 /01 1/8/02 (HARDY) **EMERGENCY** 3RD FLOOR ROOM 302 DANCE STUDIO EGG-CRATES AROUND LIGHT FIXTURES ARE FALLING DOWN FROM THE CEILING IN THE DANCE STUDIO & COULD FALL ONTO THE STUDENTS (SAFETY HAZARD) December 21, 2001 January 8, 2002 18 days
FM-200201315 02 1/18/02 (HARDY/ FILLMORE) 3RD FLOOR/ BOYS BATHROOM !!! URGENT !!! URINAL IS BROKEN AND FILLED WITH URINE AND IS ABOUT TO OVERFLOW. MR. GARCIA FROM FACILITIES MANAGEMENT WILL BE AT THE SCHOOL ON 1/18/02. January 17, 2002 January 18, 2002 1 day
FM-200201983 02 2/1/02 (HARDY) ***EMERGENCY*** 3RD FLOOR ROOM 303 (CERAMICS ROOM) THERE IS AN ELECTRICAL BOX POSITIONED ON THE FLOOR NEXT TO A SINK (WAS KICKED BY A STUDENT & IMMEDIATELY SPARKED-- BOX IS NOT IN USE) & NEEDS TO BE CAPPED TO PREVENT INJURY FROM POSSIBLE SHOCK OR SHORTING. January 28, 2002 February 1, 2002 4 days
FM-200204778 02 4/11/02 (Hardy) ****Urgent**** 1.Asbestos Assessment Required A leak in the roof above the hallway by classroom 315 is causing the ceiling plaster to fall. Once the leak is repaired, it will be necessary to repair the damaged ceiling in this area. Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) 0n 3/22/02 (CEB March 20, 2002 April 11, 2002 22 days
FM-200125929 /01 5/6/02 (HARDY) **EMERGENCY** THIRD (3RD) FLOOR - GIRLS RESTROOM ASBESTOS ASSESSMENT REQUIRED. NEED WALL ASSESSED SO PLUMBER CAN REATTACH COMMODE TO WALL. 1. REPAIR TWO (2) SINKS WITH LEGS ATTACHED, THEY ARE LEANING. 2. THE PIPES ARE LEAKING WATER FROM THE BOTTOM. SAFETY HAZARD. POC: CHANGE FOR ASBESTOS/ ASSIGN DATE 01-23-02 A. BUTLER #ID 748. Asbestos Code A - Clear For Repairs On 03/25/02. Horne Engineering - Sam Ebrahim (RG 03/27/02) December 21, 2001 May 6, 2002 136 days
FM-200204592 02 5/7/02 (Hardy/Filmore) 3rd Floor Teachers Lounge Replace handle on toilet in the 3rd-floor teachers lounge which is not working. Asbestos Code A - Clear For Repairs On 04/09/02. DCPS Safety - Leroy Minton Jr. (RG 04/10/02) March 18, 2002 May 7, 2002 50 days
FM-200208107 02 6/10/02 (Hardy) Fire code violation: 1. Asbestos assessment required. 1st Floor/Cafeteria: Door closure broken on exit door in rear of cafeteria. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 21, 2002 June 10, 2002 20 days
FM-200208081 02 6/10/02 (Hardy) Fire code violation: Page 2 of 3 Room #216: Door needs to be checked. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 20, 2002 June 10, 2002 21 days
FM-200208111 02 6/10/02 (Hardy) Fire code violation: 1. Asbestos assessment required. 1st Floor/Boys gym door: Door closure broken on exit door #5 Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 21, 2002 June 10, 2002 20 days
FM-200208110 02 6/10/02 (Hardy) Fire code violation: 1. Asbestos assessment required. 1st Floor/Boys gym door: Door closure broken on door entrance. Asbestos Code A - Clear for repairs on 05/22/02. DCPS Safety - Ronald Edwards (RG 05/23/02) May 21, 2002 June 10, 2002 20 days
FM-200204847 02 10/22/02 (Hardy) ***Emergency*** Through-out: Windows are blowing out in the following areas: 3rd floor/boys lavatory and girls locker room. (Safety hazard) March 22, 2002 October 22, 2002 214 days
FM-200215274 02 11/1/02 (Hardy) !!!!Very Urgent!!!! 3rd Floor/Nurse office: Problem with electrical breaker; no power in this area. August 21, 2002 November 1, 2002 72 days
FM-200206936 02 3/19/03 ****Urgent**** The rope for raising & lowering the flag in front of the building was cut. Need more rope to be hung on the flagppole in time for a mayoral visit. April 30, 2002 March 19, 2003 323 days
FM-200226451 03 7/9/03 (Hardy) exterior Repair exterior steps on the 34th St. side. Urgent because of handicapp kids. March 3, 2003 July 9, 2003 128 days
FM-200340210 /03 12/1/03 (Hardy) !!!URGENT!!! 2nd Floor/Girls Bathroom: Stopped up sink, please repair before Friday, November 14. 2003 when special activities will begin. November 12, 2003 December 1, 2003 19 days
FM-200339896 03 12/3/03 (Hardy) !!VERY URGENT!! 3rd Floor/Boys Bathroom: Toilets over-flowing in boys restroom, flooding the floors, running in-to the hallway. November 4, 2003 December 3, 2003 29 days
FM-200444218 04 2/19/04 (Hardy) !!!VERY URGENT!!! Through-Out the Building: No electrical power. February 19, 2004 February 19, 2004 0 days
FM-200448414 04 6/22/04 (Hardy) !!!VERY URGENT!!! 1st Floor/Main Office: Breaker continues to shut-off following re-set. Restore power to the main office. May 24, 2004 June 22, 2004 29 days
FM-200444606 04 7/22/04 (Hardy) !!!VERY URGENT!!! 2nd Floor/Boys Bathroom: Repair or replace ruptured pipe under sink. (Feed pipe) March 1, 2004 July 22, 2004 143 days
FM-200457255 /04 12/7/04 (Hardy) 35th Street Entrance/2nd Floor: Repair falling plaster on ceiling. (Safety Hazard) HA 013 Plaster white No Asbestos HA 713 Brown Coat with HA 013 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 10/27/04 October 21, 2004 December 7, 2004 47 days
FM-200500965 05 2/1/05 Rosario/Hardy Boiler Room Boiler #3 off on flame failure. Boiler will not come on. Need boiler #3 to get proper heating for building. See engineer, Mr Chance. Urgent !!!!! January 31, 2005 February 1, 2005 1 day
FM-200505649 05 5/20/05 (Hardy, New) "Urgent" First floor, Room 112. Unclog sink in art room, student are unable to complete project. May 18, 2005 May 20, 2005 2 days
FM-200506306 05 6/6/05 (Hardy) "Urgent" First floor, Boys' restroom. Unclog wall mounted urinals. June 3, 2005 June 6, 2005 3 days
FM-200507207 05 7/15/05 "Urgent" First and Second floor. Unstop (4) slop sinks on both floors also unstop (3) urinals on second floor in boys' restroom. June 27, 2005 July 15, 2005 18 days
FM-200506581 05 8/8/05 (Hardy) "Urgent" First floor, Main Office. Remove old air conditioner unit and install new air conditioner unit. Note: The window is 8' off the ground, workers will need a scaffold to do installation. June 9, 2005 August 8, 2005 60 days
FM-200510306 05 8/16/05 (Hardy) "Urgent" First and Second floor. Repair or Replace drinking fountains asap ! August 15, 2005 August 16, 2005 1 day
FM-200515008 05 11/2/05 Third floor, Boys' & Girls' Restrooms. "Urgent" 1.) Unstop toilets and urinals in boys' restroom 2.) Unstop toilets in girls' restroom November 2, 2005 November 2, 2005 0 days
FM-200513807 /05 11/3/05 Hardy Very Urgent Second Floor-Auditorium Repair/Replace lighting in the back of the auditorium October 13, 2005 November 3, 2005 21 days
FM-200331725 03 11/8/05 (Hardy) !!!VERY URGENT!!! Auditorium: Repair lights in the above; Graduation will be held on Tuesday, June 17, 2003. (Lighting is very dim. June 13, 2003 November 8, 2005 879 days
FM-200112488 01 2/3/06 HARDY FIRST FLOOR CAFETERIA, HALLWAY ACROSS FROM GIRLS RESTROOM 1) FURNISH AND INSTALL TWO (2) WATER COOLERS ONE IN THE CAFETERIA AND ONE ON THE 34 TH ST. SIDE. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY CEB. 8/14/01. (CEB) ACROSS FROM GIRLS RESTROOM WATER LINES ARE PRESENT WATER COOLER ACROSS FROM THE FIRST FLOOR GIRLS RESTROOM NEEDS TO BE DESIGNED FOR AN EXPLORATORY. June 5, 2001 February 3, 2006 1,704 days
FM-200121901 /01 2/3/06 (HARDY) 1ST FLOOR/ ROOMS: 110, 115, 101, AND 112 CLASSROOMS NEED LIGHT COVERS ON CEILING LIGHTS. * THIS IS A SAFETY HAZARD FOR TEACHERS. LIGHTS FIXTURES ARE EXPOSED* October 18, 2001 February 3, 2006 1,569 days
FM-200110776 01 4/14/06 (HARDY) "VERY URGENT" 1. ASBESTOS ASSESSMENT REQUIRED. 35TH STREET SIDE: REPAIR STEPS, CRACKED AT EACH END. AREA HAS BEEN ISOLATED, FOR FEAR OF INJURY, A PARENT TRIPPED. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 07/13/01. May 22, 2001 April 14, 2006 1,788 days
FM-200455385 04 5/24/06 Hardy Second floor room 201 First floor room 110 Need a lock replaced, teachers can not secure there classroom, very urgent. September 22, 2004 May 24, 2006 609 days
FM-200455386 04 5/24/06 Hardy First floor room 115 Need a knob lock students can only leave out of one door. Fire Code, very urgent. September 22, 2004 May 24, 2006 609 days
FM-200455389 04 5/24/06 Hardy URGENT First floor boiler room Requesting a key to enter the boiler room door, can not reset the alarm or shut off the water. September 22, 2004 May 24, 2006 609 days
FM-200455661 04 8/16/06 Hardy ( Filmore) Boiler Room #3 Boilers # 1,#2 and,#3 will not come on, check and service. Urgent !!!! September 24, 2004 August 16, 2006 691 days
FM-200513091 05 9/7/06 Hardy Urgent On 35th St. Side Entrance Bulk Trash Pick Up On The Grass. September 23, 2005 September 7, 2006 349 days
FM-200220410 /02 1/20/07 Hardy First and second floor Girls and boys bathroom Installing a handicap toilet bowl and handicap face bowl and railing. Safety needs to come out and inspect where these things need to go. This is an extreme emergency for a student that has been register at Hardy. Asbeatos Code A - Clear for repairs on 11/04/02. Horne Engineering - Sharon Voss (RG 03/06/01) October 31, 2002 January 20, 2007 1,542 days
FM-200515509 /05 1/20/07 Urgent: Replace light fixture on the first floor in the cafeteria storage room it does not work, it is a very old fixture November 16, 2005 January 20, 2007 430 days
FM-200502488 05 1/20/07 {Hardy) " Urgent" Asbestos Assessment Required. First floor. Repair/Replace drinking fountains, they are running continously and leaking very badly. Note: Currently there is no drinking water on the first floor. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/15/05) March 10, 2005 January 20, 2007 681 days
FM-200459209 04 1/20/07 Hardy Girls and boys gymnasium Replace lights. Asbestos Code A - Clear for repairs on 12/10/04. DCPS Safety - Leroy Minton (RG 12/10/04) December 6, 2004 January 20, 2007 775 days
FM-200455390 04 1/20/07 Hardy URGENT First floor boys restroom Two partitions missing. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) DUPLICATE September 22, 2004 January 20, 2007 850 days
FM-200445891 04 1/20/07 (Hardy) !!!VERY URGENT!!! 1st Floor/Main Office Hallway: No lights, very dark. (Reason unknown) March 26, 2004 January 20, 2007 1,030 days
FM-200339342 /03 1/20/07 (Hardy) !!!URGENT!!! 1st Floor/Through-out: Repair or replace locks on the following doors: Rooms #103, 105, 113, and 15. Students are hitting handles causing doors to open. October 23, 2003 January 20, 2007 1,185 days
FM-200331540 03 1/20/07 (Hardy Middle School) 2nd Floor/Boys Restroom: Unstop urinals, #5 & 7 are clogged. It is urgent that we have someone to come out and service this bathroom, as graduation excercise is to take place on Friday, June 13, 2003. June 10, 2003 January 20, 2007 1,320 days
FM-200623221 5/24/06 1/20/07 Hardy(Rosario) Boiler Room Repair or replace inoperable sump pumps. Causing section of this area to flood and creates problems when dumping boilers. urgent !!!! May 24, 2006 January 20, 2007 241 days
FM-200219324 /02 1/20/07 (Hardy) !!!URGENT!!! Roof Drains/Below girls gym: Water from drains running down in-to 2nd Floor; successfully unstopped all other drains, however, drains #8 and #23, need to be cleared. October 11, 2002 January 20, 2007 1,562 days
FM-200207904 02 1/20/07 (Hardy) 2nd floor/room #210: Door knob broken on classroom door. Asbestos Code A - Clear for repairs on 5/17/02 DCPS Safety, Leroy Minton (RE - 5/20/02) May 16, 2002 January 20, 2007 1,710 days
FM-200206932 02 1/20/07 1st Floor Cafeteria & Counselor's Office Need door closures for the cafeteria & counselor's office doors. Closure make and series is Norton 7500 for the cafeteria. Asbestos Code A - Clear for repairs on 05/02/02. DCPS Safety - Ronald Edwards (RG 05/06/02) April 30, 2002 January 20, 2007 1,726 days
FM-200206930 02 1/20/07 1. Asbestos Assessment Reqd. 1st & 2nd Floors/Rooms 103, Boy's Restroom, 201, 209 & 210, 216, Boy's Restroom 2. Realign doors in the areas above, which are sticking. Students and teaching staff are having problems getting in & out of the doors. Asbestos Code A - Clear for repairs on 05/02/02. DCPS Safety - Ronald Edwards (RG 05/06/02) April 30, 2002 January 20, 2007 1,726 days
FM-200206927 02 1/20/07 1. Asbestos Assessment Reqd. 3rd Floor Rooms 311, 312 & 317 2. Doors are out of alignment and do not close properly. 3. Check the outside strips on the opposite sides of the doors. Asbestos Code A - Clear for repairs on 05/01/02. DCPS Safety - Ronald Edwards (RG 05/02/02) April 30, 2002 January 20, 2007 1,726 days
FM-200620314 3/24/06 1/22/07 Very Urgent Front entrance 35th St. side-Bricks are loose - Afraid someone will get hurt. March 24, 2006 January 22, 2007 304 days
FM-200620989 4/6/06 1/22/07 Hardy/Filmore Boiler Room Repair or replace safety valve on Boiler #5. The valve can not be tested by hand as required. Urgent !!!!! April 6, 2006 January 22, 2007 291 days
FM-200337613 03 1/22/07 Hardy URGENT Unstop roof drains # 3 over principals office on third floor; # 15 over cafeteria and # 26 over gym. Water is damaging wood floor of gym, principals office floor and cafeteria ceilings. September 16, 2003 January 22, 2007 1,224 days
FM-200445769 04 1/22/07 Hardy Boiler Room/Sump pump Service control panel. For operation of sump pumps. Boiler and air way are flooding do to manlfunction of automatic controls. Automatic controls are not working on pumps #1, #2, #3 and #4. Urgent !!!! March 24, 2004 January 22, 2007 1,034 days
FM-200445770 04 1/22/07 Hardy Boiler Room/Sump pump Repair or replace coupling on sump pumps. Rubber coupling needs replacing do to wear and tear. Coupling size 3 or 4. Will pull coupling to take to HVAC. Urgent !!!! March 24, 2004 January 22, 2007 1,034 days
FM-200455388 04 1/22/07 Hardy URGENT First floor Female restroom Partitions need to be put up 3 are missing. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 22, 2004 January 22, 2007 852 days
FM-200500967 05 1/22/07 Rosario/Hardy Boiler Room- Tunnel Repair reputure line under ground leading from tunnel, water is coming into the Boiler room. Problem has reoccurred. See engineer, Mr Chance. Urgent !!!!! January 31, 2005 January 22, 2007 721 days
FM-200505966 05 1/22/07 (Hardy/Fillmore) "Urgent" Asbestos Assessment Required. Third floor. Scrape old paint off wall in preparation for plastering and painting. Lead & Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Richard Gibson ( RG ) May 25, 2005 January 22, 2007 607 days
FM-200513717 /05 1/22/07 (Hardy) "Urgent" First & Second floor/Girls' & Boys' restrooms. Need electricians to assess and repair electrical issues. Note: The lighting is malfunctioning. October 11, 2005 January 22, 2007 468 days
FM-200515519 /05 1/22/07 Hardy- Rosario Boiler Room Repair or replace automatic water feeder on Boiler #2. Will not shut off, cintinously feeding water. Urgent !!!! November 16, 2005 January 22, 2007 432 days
FM-200207037 02 1/22/07 Hardy ****Urgent**** Water is leaking into the boys gymnasium from the roof. Roof drain need to be unstopped. Water leakage is causing the gym floor to buckle. May 3, 2002 January 22, 2007 1,725 days
FM-200206933 02 1/22/07 ****Urgent**** 1st Floor Kitchen There is leakage under the sink on the right side of the kitchen which needs repair. The leakage is causing damage to the sink. April 30, 2002 January 22, 2007 1,728 days
FM-200516382 /05 1/22/07 Rosario/Hardy Kitchen Survey and take steps to install some type of heating system in this area. None exit at present. Urgent !!!!! December 13, 2005 January 22, 2007 405 days