Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Hart Middle School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200121868 /01 10/26/01 (HART) 1. ASBESTOS ASSESSMENT REQUIRED. Urgent! Lock broken on counselors secretary office--room that has all student records including confidential special education records. Requester Phone: 645-3420 Requestor Phone: 645-3420 October 24, 2001 October 26, 2001 2 days
FM-200123376 /01 11/29/01 HART BOILER ROOM 1.ASBESTOS ASSESSMENT REQUIRED. 2.REPAIR OR REPLACE RUPTURED EXPANISON TANK. 3.REPAIR OR REPLACE RUPTURED 1 1/2 " LINE TO EXPANSION TANK. 4. POC: WARREN YOUMANS 202 345-3331/CODE A -CLEARED FOR REPAIR BY HORNE ENGINEERS-RAYMOND AGNANT 11-15-01. (SRH 11-15-01) THE EXPANSION TANK ONLY CAN BE REPAIRED -RONALD CRITCHLOW THE ENGINEERING SUPERVISOR AND CARNAL BRADLEY THE STEAMFITTERS SUPERVISOR HAS BEEN INFORMED BY SHEILA HOWARD DCPS SAFETY TO REPAIR THE TANK AND DO NOT DISTURB THE BOILER INSULATION IN THE PROCESS. (11-15-01) November 15, 2001 November 29, 2001 14 days
FM-200120623 01 12/3/01 HART BOILER ROOM 1.ASBESTOS ASSESSMENT REQUIRED 2.INSTALL LOW WATER FUEL CUT OFF-SAFETY DEVICE, LINE, AND GATE VALVE FOR ALL (3) BOILERS. 3. WIRE (LWFCO) AND TEST/DEMOSTRATE ALL (3) BOILERS TO ENGINEERS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/15/01. HORNE ENGINEERING - STEPHEN CALDWELL (RG) September 27, 2001 December 3, 2001 67 days
FM-200102897 01 1/24/02 HART KITCHEN ASBESTOS ASSESMENT INSTALL GREASEAP. ASBESTOS CODE A-CLAER FOR BY 11/27/01DCPS SAFETY CEB REPAIR TO THE GREASEAP WAS COMPLETED IN MONTH OF 7//01 February 5, 2001 January 24, 2002 353 days
FM-200107932 01 1/24/02 HART BASEMENT PAINTING AND TOUCH UP. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/19/01. MR.BALT SAID THAT THE PAINTING WAS COMPLETED BY AUA COMTRACTOR. MR. CHARLES BUCHANAN - SAFETY (202)439-7840 April 9, 2001 January 24, 2002 290 days
FM-200122058 02 2/10/02 (HART) 1. ASBESTOS ASSESSMENT REQUIRED. both entrances of the gym are a security risk, they need locks for the doors and also girls and boys entrances to the shower areas; keys needed also for the stairway to the rec area from the gym. Requester Phone: 202-645-3420 Requestor Phone: 202-645-3420 ASBESTOS CODE A-CLEAR FOR REPAIR 11/30/01 BY DCPS SAFETY CEB February 8, 2002 February 10, 2002 2 days
FM-200204055 02 3/8/02 Hart JHS Tunnel Urgent 1. Asbestos assessment may be required. 2.Repair/replace ruptured line under basement of recreation area. Note: A portion of the building is without heat POC - Warren Youmans - 202-698-9838 Asbestos Code A - Clear For Repairs On 03/0/02. Horne Engineering - Troy Wilcome (RG 03/07/02) March 7, 2002 March 8, 2002 1 day
FM-200202933 02 5/1/02 (Hart) Electrical emergency! Stage floor lights have open sockets and wiring exposed, creating a safety hazard. Stage panel box for lighting and electrical controls needs updating or replacing to i dentify and control electrical service for the auditorium--original equipment still using fuses. Code A-clear for repair by Horne Engineer (Sam Ebrahim ) on 3/28/02 (CEB) February 12, 2002 May 1, 2002 78 days
FM-200212453 02 7/19/02 (Hart) ***Very Very Urgent*** Playground: Remove basketball goal and pole for safety. Equipment was knocked down by a stolen car, which is still on the school grounds. July 19, 2002 July 19, 2002 0 days
FM-200214625 02 8/16/02 Hart ****Very Urgent/BREAK-IN**** Basement Stairwell #5 Replace two (2) broken windows on basement stairwell #5, which was the point of entry for the break-in. There are insects and squirrels now coming in through the unprotected windows. August 15, 2002 August 16, 2002 1 day
FM-200215045 02 8/19/02 (Hart) !!!Very Urgent/BREAK-IN!!! Basement/New wing: Due to break in, vandals pulled grate away from wall and entered the building. August 19, 2002 August 19, 2002 0 days
FM-200216314 02 9/3/02 Hart ****Urgent**** Basement, 2nd & 3rd Floor Girls' Restrooms There is a mixing valve problem. There is hot water passing through the flush valves into the toilets. September 3, 2002 September 3, 2002 0 days
FM-200204495 02 9/3/02 Hart Boiler room Replace (4) unknown existing safety relief valves on boilers #1 & 3 with 60 lb. each, (2) of 2" x 2 1/2" BTU/HR 6,751,000 & (2) 1" x 1 1/4" March 15, 2002 September 3, 2002 172 days
FM-200215044 02 9/10/02 (Hart) !!!Very Very Urgent!!! Basement/New wing: Due to break in, vandals pulled grate away from wall, broke window, and entered the building. August 19, 2002 September 10, 2002 22 days
FM-200216392 02 9/16/02 (Hart) !!!Very Urgent!!! 1st Floor/Room #130-Counselor's record room: Key broke off in cylinder, unable to obtain belongings in that room i.e., Purse, house keys, and inhaler for asthma. September 3, 2002 September 16, 2002 13 days
FM-200216074 02 11/22/02 Hart ***Urgent**** Main Lobby Center Door; 3rd Flr. Custodian Closet & Hallway/Old Wing and New Wing 1. Old Wing: Need new door closers at stairwell #6; cafeteria main entrance door, room 139; 3rd floor custodian closet & basement. 2. New Wing: Stairwell #6 needs new door closer. August 28, 2002 November 22, 2002 86 days
FM-200223419 03 1/9/03 (Hart) !!!VERY URGENT!!! New wing/1st Floor: Due to break-in, window guards pulled away from window, damaged, and window broken in teachers lounge. January 2, 2003 January 9, 2003 7 days
FM-200223418 03 1/17/03 (Hart) !!!VERY URGENT!!! New wing/1st Floor: Due to break-in, window guards pulled away from window, damaged, and window broken in the teachers lounge January 2, 2003 January 17, 2003 15 days
FM-200222254 02 1/27/03 (Hart) !!!VERY URGENT!!! Old building/1st Floor, across from stairwell #9: Drinking fountain running over on floor. December 9, 2002 January 27, 2003 49 days
FM-200214518 02 3/12/03 (Hart) Fire code violation: Page 3 of 4 Cafeteria: Wall breach. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) August 15, 2002 March 12, 2003 209 days
FM-200214528 02 3/12/03 (Hart) Fire code violation: Page 3 of 4 Across from room #1307: Wall breach. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) August 15, 2002 March 12, 2003 209 days
FM-200214523 02 3/12/03 (Hart) Fire code violation: Page 3 of 4 Room #09-B: Wall breach. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) August 15, 2002 March 12, 2003 209 days
FM-200214519 02 3/12/03 (Hart) Fire code violation: Page 3 of 4 Next to B-25: Wall breach. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) August 15, 2002 March 12, 2003 209 days
FM-200204304 02 3/26/03 Hart Boiler room Replace safety valve in #1 boiler. Specs: 60 PSI, 2" diameter. March 12, 2002 March 26, 2003 379 days
FM-200216971 02 4/3/03 Hart ****Urgent**** Rm. 130 Repair broken lock. September 9, 2002 April 3, 2003 206 days
FM-200201046 02 5/5/03 HART AUDITORIUM REPAIR RUPTURED COILS IN AIR HANDLER TO LEFT SIDE OF STAGE. ASBESTOS ASSESSMENT REQUIRED. CODE A -CLEAR FOR REPAIR, ASBESTOS ABATEMENT DATE 01-25-02. DCPS SAFETY-SHEILA R. HOWARD 01-29-02. January 14, 2002 May 5, 2003 476 days
FM-200331809 03 6/16/03 Hart !!!VERY URGENT!!! Exteroir 1. Tree fell in front of building -staff cut the tree up ,but need to have it removed . June 13, 2003 June 16, 2003 3 days
FM-200339157 /03 10/21/03 (Hart) !!!VERY URGENT!!! Basement/Rec. Room: Boys and girls bathroom toilets, and urinals are stopped up. It is mandatory that we have access to these restrooms, as the Ballou High Schools students will be using them also. October 20, 2003 October 21, 2003 1 day
FM-200331993 03 1/5/04 (Hart) !!!VERY URGENT!!! Basement and Storage room: Due too Verizon working in the area, electrical power has been knocked out. June 17, 2003 January 5, 2004 202 days
FM-200202947 02 3/24/04 (HART) ASBESTOS ASSESSMENT REQ. BASEMENT/ OLD BUILDING WIRE GLASS NEEDED IN THE WOODSHOP. SIZE: 48 1/4 x 70 5/8. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/21/02. DCPS - SAFETY - RICHARD GIBSON (RG 02/21/02) February 13, 2002 March 24, 2004 770 days
FM-200202915 02 3/24/04 (HART) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ AUDITODIUM REFURNISH /INSTALL AUDITORIUM SEATS APPROX. 25-30 SEATS FOR SAFETY REASONS, NEEDS SCREWS. ASSESS THE FLOOR SURFACE FOR DRILLING INTO THE FLOOR FOR NEW INSTALLATION. POC: MR. SCRUDDER, ASSISTANT PRINCIPAL AND MR. ROBINSON, AN CUSTODIAN ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/13/02 HORNE ENGINEER: ROGER KAGER February 12, 2002 March 24, 2004 771 days
FM-200217786 02 3/25/04 Hart ****Urgent**** Asbestos Assessment Reqd. 3rd Floor Room 313 Replace leaking ballast. The ballast is leaking a brown liquid. Asbestos Code A - Clear for repairs on 09/19/02. DCPS Safety - Leroy Minton (RG 09/20/02) September 18, 2002 March 25, 2004 554 days
FM-200443832 04 3/25/04 (Hart) !!!VERY URGENT!!! New Wing 1st Floor/Classroom #134: Old Wing 1st Floor/Classroom #123: Replace windows that was blown out by the wind. February 9, 2004 March 25, 2004 45 days
FM-200340287 /03 3/25/04 (Hart) !!!URGENT!!! 3rd Floor/Utility Closet: Repair or replace lock on closet door to secure room. November 14, 2003 March 25, 2004 132 days
FM-200331483 03 3/25/04 (Hart) !!!VERY URGENT!!! New Wing/Basement: Repair or replace glass in window; glass has slipped out of window frame. June 9, 2003 March 25, 2004 290 days
FM-200207631 02 3/25/04 Hart !!! Emergency !!! Third (3rd) Floor - Locker in Hallway Locker has come away from the wall. And need to be repair. A student has been hit by the Locker. POC: Mr. Robbins is on site. Safety Hazard. May 13, 2002 March 25, 2004 682 days
FM-200220324 /02 3/25/04 (Hart) !!!VERY URGENT!!! 1. Asbestos assessment required. Basement/Kitchen: Gas leak coming from steam table. Inspected by: katherine Dominick. Asbestos Code A - Clear for repairs on 04/29/03. DCPS Safety - Leroy Minton Jr. (RG 04/29/03) October 30, 2002 March 25, 2004 512 days
FM-200445695 04 4/12/04 (Hart) !!!VERY URGENT!!! 1st Floor/Gymnasium: Restore water to faucets, unable to access water for washing hands. March 23, 2004 April 12, 2004 20 days
FM-200444434 04 4/27/04 (Hart) !!!URGENT!!! Exterior of Building: Repair fence in back. February 25, 2004 April 27, 2004 62 days
FM-200119107 01 5/3/04 (HART) 1. ASBESTOS ASSESSMENT REQUIRED. Basement Cafeteria--garbage disposal leaking water. Deep fryer needs service. Ice machine needs service. Requester Phone: 645-3420 Requestor Phone: 645-3420 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/05/01. RICHARD GIBSON- SAFETY (202)576-5584(RG) August 28, 2001 May 3, 2004 979 days
FM-200119115 01 5/7/04 (HART) 1. ASBESTOS ASSESSMENT REQUIRED. Outside lighting--replace burned out bulbs on roof. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/05/01. RONALD EDWARDS - SAFETY (202)576-6693 August 28, 2001 May 7, 2004 983 days
FM-200449715 04 6/24/04 (Hart) !!!URGENT!!! Old Building/1st Floor: Lock on door has malfunctioned in room #122. June 23, 2004 June 24, 2004 1 day
FM-200444607 04 7/6/04 (Hart) !!!URGENT!!! Asbestos Assessment Required. Old Building Basement/Cafeteria Entrance: Repair or replace doors. Old Building/Basement: Repair broken door closers at the bottom of stairwell #7. Asbestos Code A - Clear for repairs on 03/01/04. Horne Engineering - Philp Connolly (RG 03/22/04) March 1, 2004 July 6, 2004 127 days
FM-200456198 04 10/1/04 (Hart) !!!VERY URGENT!!! Old Building/2nd Floor #209: Assist. Principal, Mr. Wilson, locked all keys in his classroom, including his personal keys. September 30, 2004 October 1, 2004 1 day
FM-200222257 02 12/1/04 (Hart) !!!VERY URGENT!!! 1st Floor/Lobby: Re-hang water fountain, damaged by vandals. Asbestos Code A - Clear for repairs on 12/10/02. Horne Engineering -Tony Marcolin (RG 12/12/02) December 9, 2002 December 1, 2004 723 days
FM-200451795 04 5/23/05 Hart Fire Code Violation First floor room 134 Ceiling tile missing. 2000 IFC DC SUPP 110.0 Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 6, 2004 May 23, 2005 290 days
FM-200451787 04 5/23/05 Hart Fire Code Violation Third floor room 307 2 ceiling tiles. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 6, 2004 May 23, 2005 290 days
FM-200451785 04 5/23/05 Hart Fire Code Violation Third floor Ceiling tile missing stairwell # 8. 2000 IFC DC SUPP 100.3 Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 6, 2004 May 23, 2005 290 days
FM-200451797 04 5/23/05 Hart Fire Code Violation First floor room 141 5 Ceiling tile missing. 2000 IFC DC SUPP 110.0 Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 6, 2004 May 23, 2005 290 days
FM-200451796 04 5/23/05 Hart Fire Code Violation First floor room 140 Ceiling tile missing. 2000 IFC DC SUPP 110.0 Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 6, 2004 May 23, 2005 290 days
FM-200505839 05 5/31/05 (Hart) "Urgent" Bldg. 413. Second floor, New Wing room 225. Repair or Replace lock. custodian's master key would not work nor would the teachers control key. Note: The teacher and students are standing in the hallway. May 23, 2005 May 31, 2005 8 days
FM-200455209 04 9/20/05 Hart Second floor boys bathroom Electrical switch is not turning the lights on/ off. Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 20, 2004 September 20, 2005 365 days
FM-200513456 05 10/7/05 Hart Very Urgent Basement (old building)-Infant car center Repair/Replace lock on the door, they don't work October 4, 2005 October 7, 2005 3 days
FM-200513471 05 10/7/05 (Hart) "Urgent" Basement, Day Care Center. Repair or Replace locks on entrance and exit doors. October 4, 2005 October 7, 2005 3 days
FM-200451805 04 12/27/05 Hart Fire Code Violation Basement next to stairwell # 8 Ceiling tiles. 110.0 Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 6, 2004 December 27, 2005 508 days
FM-200451789 04 12/27/05 Hart Fire Code Violation Second floor new wing pathway Breach holes. F 110.0 Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 6, 2004 December 27, 2005 508 days
FM-200510485 05 1/26/06 (Hart) "Urgent" Rear exterior of building. Remove bulk trash from premises. August 16, 2005 January 26, 2006 163 days
FM-200509092 05 1/26/06 (Hart) "Urgent" Grounds. Need bulk trash pick-up of old furniture and windows/heavy debris. July 29, 2005 January 26, 2006 181 days
FM-200125099 /01 2/3/06 (HART) ROOF PERIMETER 1) REPAIR OR MODIFY INADEQUATE SECURITY LIGHTING, FREQUENTLY SHUTS OFF. 2) INSTALL OR REPLACE FIXTURES OVER BOILER ROOM AND EGRESS DOORS VISIBILITY IS EXTREMLY POOR AT NIGHT AND EARLY MORNINGS, THIS A SAFETY HAZARD TO STAFF AND PTA, IS NOT LIMITED JUST TO BUILDING SECURITY. December 13, 2001 February 3, 2006 1,513 days
FM-200201122 02 2/3/06 (HART) ASBESTOS ASSESSMENT REQUIRED THROUGHOUT 1ST & 2ND FLOORS REPLACE 180 BROKEN WINDOWS. HEAT IS GOING OUTSIDE IN ROOMS 227, 226, 230, 216, 218,214, 213, 220, 221, 224, 201 203, 207, 205, 212, 229, 231, 208, 225, LOUNGE TOILET, STAIRWELL #6, HALL BY STAIRWELL #6, 304, 305, 307, 311, 309, 306, 301, 124, HALL TO BOYS & GIRLS GYM, LOCKERROOMS, TOILETS 109, 105, 108, 127, 120, 126, 125, 122, 126, 121 & STAIRWELL #8. CODE A- CLEAR FOR REPAIR BY HORNE ENG. SHERYLL JAMES 01-16-02 DCPS SAFETY SHEILA R. HOWARD 01-16-02 January 15, 2002 February 3, 2006 1,480 days
FM-200201113 02 2/3/06 (HART) ASBESTOS ASSESSMENT REQUIRED BASEMENT CORRIDOR BY ROOM B26 INVESTIGATE & EXPLORE LEAK FROM CONCRETE WALL. THIS PRESENTS A SAFETY HAZARD & MAY CAUSE INJURY DUE TO SLIPPING & FALLING (NO BLUEPRINTS). POC: MR. YOUMANS 645-9838 CODE A CLEAR FOR REPAIR-ASBESTOS ABATEMENT DATE 01-25-02. DCPS SAFETY-SHEILA R. HOWARD 01-29-02. January 15, 2002 February 3, 2006 1,480 days
FM-200126503 02 2/3/06 HART BASMENT MECH. ROOM 1. REPLACE DOMESTIC HW TACO CIRC. PUMP LEAKING FROM HOUSING MOTOR G.E. HP 1/8, RMP 1725, VOLT 115, AMP3.0, PH 1, MOD. 5KH32EG129GX 2. REPAIR 1" COPPER SWEAT LINE TEE AND BUSHING TO SAFETY RELIEF VALVE. 3. No asbestos assessment needed. January 2, 2002 February 3, 2006 1,493 days
FM-200125101 /01 2/3/06 (HART) CORRIDOR/ THROUGH OUT BLDG. 1) REPAIR OR REPLACE STUDENT LOCKERS WITH JAGGED AND SHARP METAL PARTS. THIS IS A SECURITY AND SAFETY HAZARD TO STUDENT AND STAFF ESPECIALLY POTENTIAL DURING AND EMERGENCY EVACUTION WHILE PASSING. December 13, 2001 February 3, 2006 1,513 days
FM-200124489 01 2/3/06 (HART) ASBESTOS ASSESSMENT REQUIRED I CAN LEARN PROGRAM RENOVATE ROOM 232 FROM A HOME ECONOMICS CLASSROOM TO A COMPUTER LAB. ELECTRICAL OUTLET LOCATIONS MUST ADHERE TO THE ELECTRICAL SCHEMATICS. SEE ELECTRICAL REQUIREMENTS & SPECIFICATION. EQUIPMENT WILL ARRIVE 12/20/01. SEE ATTACHMENT CC: DANNY HUDSON CODE A -CLEAR FOR REPAIR, ASBESTOS ABATEMENT DATE 01-25-02. DCPS SAFETY-SHEILA R. HOWARD 01-29-02. December 4, 2001 February 3, 2006 1,522 days
FM-200617700 06 2/7/06 Very Urgent Repair or replace cylinder to restroom on the first floor (teacher) and Rm. 225 January 23, 2006 February 7, 2006 15 days
FM-200617919 06 2/13/06 Hart Recreation Center Urgent Replace new heating unit in receation center. January 26, 2006 February 13, 2006 18 days
FM-200451803 04 3/14/06 Hart Fire Code Violation Basement 18 ceiling tiles missing wood shop. 110.0 Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 6, 2004 March 14, 2006 585 days
FM-200619747 06 3/14/06 "Urgent" First floor, Counselor Door & Main Office/Room 134 & 319. Repair or Replace Door Knob locks, staff and children get lock in. Note: This is an issue of safety. March 10, 2006 March 14, 2006 4 days
FM-200619490 06 3/14/06 Very Urgent First Floor-Main Office Repair the lock on the second office door. See Ms. Hill March 6, 2006 March 14, 2006 8 days
FM-200618761 06 4/3/06 Hart Library Ceiling Asbestos assessment required on pipe and ceiling tile Repair or repalce leaking hot water heating line in ceiling of Library. Can not be isolated. Urgent !!!!! Asbestos Code A - Clear for repairs on 02/17/06. Tidewater - Tony Marcolin (RG 02/21/06) February 16, 2006 April 3, 2006 46 days
FM-200215176 02 4/14/06 Hart ****Very Urgent**** Old Wing/Cafeteria 1st & 2nd Floors Brick up walls that were left open by abatement team. August 20, 2002 April 14, 2006 1,333 days
FM-200621038 06 5/15/06 Hart Foiler Room Repair or replace brick work in fire box. Boiler #3 Urgent !!!!! April 6, 2006 May 15, 2006 39 days
FM-200446178 04 8/1/06 (Hart) !!!VERY URGENT!!! Asbestos Assessment Required. Second story window grate is hanging by one screw and when the wind blows it rocks back and foward. This issue is a great risk to our students, staff, and parents while on the playground. This is a emergency situation and need to be handle as soon as posible. Asbestos Code A - Clear for repairs on 04/22/04. DCPS Safety - Richard Gibson (RG) March 29, 2004 August 1, 2006 855 days
FM-200621964 06 8/11/06 Hart Boiler Room Repair or replace Lochinvar, will not stay on. No hot water. Urgent !!!!! May 1, 2006 August 11, 2006 102 days
FM-200627636 06 11/8/06 Second Floor/Ceiling tiles missing (new wing) Asbestos Code A - Clear for repairs on 08/15/06. DCPS Safety - Richard Gibson (RG) August 15, 2006 November 8, 2006 85 days
FM-200619567 06 1/12/07 Very Urgent Back Of Building By Gas Meters-Need A Welder to weld the door to the shed so students can't get in. March 7, 2006 January 12, 2007 311 days
FM-200619745 06 1/25/07 "Urgent" First floor, Stairwell # 8/Exit door. Need welder to repair split metal exit door that leads outside to parking lot area. Note: These doors cannot be secured properly. March 10, 2006 January 25, 2007 321 days
FM-200336294 03 2/9/07 Hart Boiler Room Boiler #1 will not start up. Boiler shuts down on flame failure. All safetys have been reset. * The blower motor is running loudly (Noisy) August 26, 2003 February 9, 2007 1,263 days
FM-200214890 02 2/12/07 Hart 1. Asbestos Assessment Reqd. Various Area in Basement, 1st & 2nd Floors 2. Install three (3) 220v electrical lines for a/c units in the principal's office, cafeteria, and room 216. The a/c units are onsite in each area. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) August 16, 2002 February 12, 2007 1,641 days
FM-200517024 /05 2/12/07 Very Urgent (need to have repaird befor school starts on 1-9-05): Repair electrical problem with the breaker for rm. 107 (computer lab) on the first floor. One row of computers will not come on. December 29, 2005 February 12, 2007 410 days
FM-200634056 07 2/26/07 Rooms B-06, 323, 209 , Conf. room, 309 - URGENT NO HEAT Remove pneumatic valve and straight pipe to heating coils low heating hot water circulation January 17, 2007 February 26, 2007 40 days
FM-200338793 /03 3/7/07 Hart Basement positive nature -B wing Remove broken and cracked floor and ceiling tiles in classrooms and corridor on basement level. Install missing ceiling tiles and floor tiles in above area after abatement. Assessment needed. Asbestos Code A - Clear for repairs on 10/10/03. DCPS Safety - Ronald Edwards (RG 10/10/03) Code A clear for 2'x4' acoustical ceiling tiles in the basemment hallway. and to install 12"x12" floor tiles in the basement hall way and room B35 on the basement level. (R. Edwards 10/10/03) October 10, 2003 March 7, 2007 1,244 days