Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Backus Middle School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200117713 01 9/10/01 BACKUS FIRST FLOOR - BUSINESS MANAGERS OFFICE 1) INSTALL (2) ELECTRICAL PLUGS IN MAIN OFFICE AND SUB-OFFICE. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY RONALD EDWARD 8/18/01. (CEB) August 17, 2001 September 10, 2001 24 days
FM-200104065 01 9/13/01 Backus Boiler Room Replace safety valve on boiler #1, existing valve will not reset properly. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/24/01. February 21, 2001 September 13, 2001 204 days
FM-200120001 01 9/26/01 (BACKUS) 1. ASBESTOS ASSESSMENT REQUIRED. 3RD FLOOR/TEACHERS BATHROOM: FOREIGN OBJECT STUCK IN LOCK, UNABLE TO RETRIEVE. NO ACCESS TO BATHROOM FOR TEACHERS/STAFF. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 September 24, 2001 September 26, 2001 2 days
FM-200120748 01 10/2/01 BACKUS FIRST FLOOR - ROOM 103 URGENT!!! 1) BURNING SMELL COMING FROM LIGHTS... SMELL IS VERY STRONG!!! STUDENTS USE CLASSROOM FOR CLASSES. October 1, 2001 October 2, 2001 1 day
FM-200115508 01 10/18/01 BACKUS CAFETERIA & BOYS GYM ASBESTOS ASSESSMENT REQUIRED REPAIR LIGHTINGS. LIGHTS ARE HANGING FRON CEILING. SAFETY HAZARD CODE A CLEAR FOR REPAIR HORNE ENG. BILL CAMPION 08-24-01. July 20, 2001 October 18, 2001 90 days
FM-200119284 01 11/6/01 (BACKUS) ASBESTOS ASSESSMNET REQ. !!!!!!!!! EMERGENCY !!!!!!! 3RD FLOOR/ BY ROOM 304 PIECE OF FLOOR TILE HAS POPPED UP AND THE BLACK MASTIC IS EXPOSED AND IT HAS ASBESTOS ON IT. (SAFETY HAZARD) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/06/01. HONRE ENGINEERS - ROGER KAGER September 6, 2001 November 6, 2001 61 days
FM-200122898 01 11/7/01 (BACKUS !!!EMERGENCY!!! 1) RE-WELD IRON STAIRWELL RAILING, LEADING TO PARKING LOT. "SUPERINTENDENT, DR. VANCE AND THE MAYORS PROGRAM TO TAKE PLACE ON NOVEMBER 07, 2001 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/03/01 LEROY MINTON - SAFETY (202)576-6691 (RG) November 5, 2001 November 7, 2001 2 days
FM-200117715 01 11/16/01 BACKUS THIRD FLOOR - 304 1) RELOCATE THERMOSTAT CONTROL WIRES FOR UNIVENT. PRESENTLY WIRES ARE ON FLOOR. WIRES WERE UNDER THE RISERS AND CLASSROOM IS BEING CHANGED TO REGULAR CLASSROOM INSTEAD OF BAND ROOM. RISERS ARE BEING DISGUARDED. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY RONALD EDWARD 8/18/01.(CEB) **(CURRENT REQUEST AS OF 1/15/02) 3RD FLOOR/ROOM 304 REATTACH THERMOSTAT CONTROL WIRES TO UNIVENT IN ROOM 304 TO HEAT ROOM (WIRES CUT BY DCPS BUT WERE NOT RECONNECTED). August 17, 2001 November 16, 2001 91 days
FM-200126621 02 1/7/02 (BACKUS) !!URGENT!! 3RD FLOOR/ROOM #305: WINDOW PANE BROKEN. January 3, 2002 January 7, 2002 4 days
FM-200201917 02 2/4/02 (BACKUS) ASSBESTOS ASSESSMENT REQUIRED 2ND FLOOR TEACHERS LAVATORY NEAR ROOM 204 REPLACE HOT WATER FAUCET WHICH IS CRACKED, RESULTING IN HOT WATER SHOOTING OUT WHEN USED (COULD CAUSE BURNING ACCIDENT) ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/28/02 RICHRRD GIBSON - SAFETY (202)576-5584 (RG)-01/28/02 January 28, 2002 February 4, 2002 7 days
FM-200201928 02 2/5/02 (BACKUS) ***URGENT*** OUTSIDE GROUNDS/PARKING LOT--HAMILTON STREET SIDE RESURFACE BROKEN CONCRETE AT ENTRANCE DOORS AT TOP OF HANDICAPPED RAMP BY CAFETERIA. January 28, 2002 February 5, 2002 8 days
FM-200203135 02 2/22/02 (Backus) ***Very Urgent*** 1. Asbestos Assessment Required. Request lock change on Main entry doors to Health Suite. Unknown person or person(s) entered the area and tampered with the students health records. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/21/02 HORNE ENGINEER: STEPHEN CALDWELL February 19, 2002 February 22, 2002 3 days
FM-200203371 02 2/25/02 BACKUS !!!! EMERGENCY !!!! 1. ASBESTOS ASSESSMENT REQUIRED. 2. THIRD (3RD) FLOOR - GIRLS LOCKER ROOM PIPE LEAKING WATER FROM THE CEILING, WASTE LINE RUNNING DOWN TO SECOND (2ND) TEACHER CAFETERIA CONTINUOUS LEAKING (WATER). HEALTH AND SAFETY HAZARD. CODE A CLEAR FOR REPAIR BY HORNE ENGINEERING (ROGER KAGER) 02-22-02 DCPS SAFETY-SHEILA R. HOWARD 02-22-02 February 22, 2002 February 25, 2002 3 days
FM-200203566 02 3/6/02 (Backus) ***Urgent*** 1st Floor Principals Office The sink in the principals office was jarred way from the wall as a result of a fight between two students. [Teachers use this sink & it will leak onto the floor if not repaired] February 27, 2002 March 6, 2002 7 days
FM-200204297 02 4/4/02 BACKUS BOILER ROOM Furnish materials to replace broken sewer ejector pump. NOTE: Urgent, flooding boiler room. March 12, 2002 April 4, 2002 23 days
FM-200206785 02 4/30/02 ****Urgent**** Rekey or replace the entry lock on the door to classroom 302. The previous teacher left without turning in the key and the current teacher cannot secure the door. Code A-clear for repair by Horne Engineer by ( Philip Connolly ) on 4/26/02 ( CEB ) April 29, 2002 April 30, 2002 1 day
FM-200206835 02 6/3/02 ****Very Urgent**** 1. Asbestos assessment required. South Dakota Ave. side: Drain stopped up; water will not go down and bugs are present. Visitors are expected in the school on 04/30/02. Asbestos Code A - Clear for repairs on 04/30/02. DCPS Safety - Richard Gibson (RG 04/30/02) April 29, 2002 June 3, 2002 35 days
FM-200206184 02 7/8/02 (Backus) 1. Asbestos assessment required. 3rd Floor/boys locker room: Repair or replace door that has come off hinges. Asbestos Code A - Clear for repairs on 04/23/02. DCPS Safety - Ronaid Edwards (RG 04/23/02) April 22, 2002 July 8, 2002 77 days
FM-200210988 02 7/17/02 (Backus) Fire code violation: Page 4 of 4 1. Asbestos assessment required. 1st Floor/Next to room #108: Door closure broken on exit door next to room #108. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) Disregard Lead Assessment Required type o by SKPjr. 7-15-02 July 10, 2002 July 17, 2002 7 days
FM-200210978 02 7/17/02 (Backus) Fire code violation: Page 3 of 4 1. Asbestos assessment required. 2nd Floor/Multipurpose room; Electrical outlet needs to be replaced. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 17, 2002 7 days
FM-200210952 02 7/17/02 (Backus) Fire code violation: Page 1 of 4 3rd Floor/Boys locker room: Door needs to be re-checked/Restroom. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 17, 2002 7 days
FM-200210969 02 7/17/02 (Backus) Fire code violation: Page 3 of 4 1. Asbestos assessment required. 2nd Floor/Room #212: Door closure broken. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 17, 2002 7 days
FM-200210995 02 7/17/02 (Backus) Fire code violation: Page 4 of 4 1. Asbestos assessment required. 1st Floor/Stairway - A: Doors needs to be checked. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 17, 2002 7 days
FM-200210985 02 7/17/02 (Backus) Fire code violation: 1. Asbestos assessment required. 2nd floor/Multipurpose room: Light fixture needs to be checked; electrical hazard through-out. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 17, 2002 7 days
FM-200210984 02 7/18/02 (Backus) Fire code violation: 1. Asbestos assessment required. 2nd floor: Door closure broken on girls and boys restroom door. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 18, 2002 8 days
FM-200210950 02 7/18/02 (Backus) Fire code violation: Page 1 of 4 3rd Floor/Boys locker room storage room: Light fixtures needs to be repaired through-out. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 18, 2002 8 days
FM-200210967 02 7/22/02 (Backus) Fire code violation: 1. Asbestos assessment required. 2nd Floor/Next to classroom #203: Ceiling tile missing in the hallway. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 22, 2002 12 days
FM-200210968 02 7/22/02 (Backus) Fire code violation: Page 2 of 4 1. Asbestos assessment required. 2nd Floor/Room #202-203: Ceiling tile missing in storage room. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 22, 2002 12 days
FM-200210951 02 7/24/02 (Backus) Fire code violation: Page 1 of 4 3rd Floor/Boys locker room: Ceiling tile missing in storage room. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 24, 2002 14 days
FM-200210993 02 7/26/02 (Backus) Fire code violation: Page 4 of 4 1. Asbestos assessment required. 1st Floor/Classroom #104: Breach in classroom. (Does not indicate ceiling breach or wall breach) Asbestos Code A clear for repairs, on 7/11/02 Per Mr. Gross(Custodian Supervisor) it is a ceiling breach.7-15-02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 26, 2002 16 days
FM-200210981 02 7/29/02 (Backus) Fire code violation: Page 3 of 4 1. Asbestos assessment required. Multipurpose room: Ceiling tile missing through-out classroom #267. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 29, 2002 19 days
FM-200213328 02 8/2/02 (Backus) !!!Very Very Urgent!!! 1st Floor/Room #100: Staff member locked keys in the main office; staff unable to get in. (Need extra keys made for this door) July 30, 2002 August 2, 2002 3 days
FM-200214078 02 8/13/02 Backus ****Urgent**** 1st Floor Principal's Office Repair fallen ceiling light fixture in the principal's office. The wires are now exposed. August 12, 2002 August 13, 2002 1 day
FM-200206784 02 8/26/02 ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Main Office Suite 2. Install electrical plugs in the office closet by office suite one. 3. Remove power strip for internet from the hole in the wall; close hole after removal. Code A-clear for repair by Horne Engineer by ( Philip Connolly ) on 4/26/02 ( CEB ) April 29, 2002 August 26, 2002 119 days
FM-200217379 02 9/13/02 Backus ****Urgent**** Drain @ Exit From Auditorium to Outside The drain is stopped up and needs to be cleared. September 12, 2002 September 13, 2002 1 day
FM-200218813 02 10/5/02 Backus M.S Boiler Room Start up burners and test safety controls on specified boilers. October 3, 2002 October 5, 2002 2 days
FM-200216671 02 11/1/02 Backus ****Urgent**** 3rd Floor Rooms 310 & 303 None of the electrical outlets are working in rooms 301 & 303. Repair lights or restore power. September 5, 2002 November 1, 2002 57 days
FM-200213257 02 11/13/02 Backus ****Very Urgent**** 2nd Floor Room 209 Heat pump cooling unit is leaking water profusely and causing the ceiling tiles in the classroom below [Rm. 105] to fall. Also, inspector is due to come and reinspect later this evening---would like to avoid being cited. July 29, 2002 November 13, 2002 107 days
FM-200227611 03 3/25/03 Backus Boiler room (URGENT) Unstop floor drain in the boiler room area,this needed in order to drain the boilers for repairs March 25, 2003 March 25, 2003 0 days
FM-200203194 02 3/28/03 (Backus) Asbestos Assessment Required 3rd Floor Gym Locker Rooms Furnish & install wooden benches in both boys and girls gyms. Asbestos Code A - Clear for repairs on 6/12/02 DCPS Safety - Ronald Edwards (RE-6/12/02) February 21, 2002 March 28, 2003 400 days
FM-200210973 02 4/11/03 (Backus) Fire code violation: Page 3 of 4 1. Asbestos assessment required. 2nd Floor/Next to room #214: Door glass missing on exit door next to room #214. Site visit 4-10-03 by Julius Dancy Code Inspector repairs completed. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 April 11, 2003 275 days
FM-200210954 02 7/7/03 (Backus) Fire code violation: Page 1 of 4 3rd Floor/Boys/girls shower area: Light fixtures needs to be covered. (Electrical hazard) Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 7, 2003 362 days
FM-200210949 02 7/7/03 (Backus) Fire code violation: Page 1 of 4 3rd Floor/Boys locker room: Light fixtures needs to be repaired. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 July 7, 2003 362 days
FM-200332786 03 7/14/03 Backus Rooms 108, and 210 SUMMER SCHOOL SITE! 1) Restore electrical service to window A/C units outlet, cannot locate circuit in the pannel box, for room 108. 2) Upgrade electrical service in room 210 from 20 amp circuit to 30 amp circuit, a/c unit is on site in the window. Asbestos Code A - Cleared for repairs on 07-01-03 by Leroy Minton Jr. (LM/07-01-03) Safety Office 202-576-8962. July 1, 2003 July 14, 2003 13 days
FM-200337489 03 9/29/03 Backus EMERGENCY Room 211 fire sparks when switch come on. Room 213 wall plug unit is out, because it was on fire sparks no electricity in the room. Asbestos Code A - Clear for repairs on 09/15/03. DCPS Safety - Richard Gibson (RG) September 15, 2003 September 29, 2003 14 days
FM-200338676 03 10/8/03 (Backus) !!!VERY URGENT!!! 3rd Floor Girls Locker Room/Bathroom: Leaking down in 2nd floor kitchen; bathroom above Possible leaking from that bathroom. October 8, 2003 October 8, 2003 0 days
FM-200336603 03 10/15/03 Backus URGENT Second floor room 211 Fire coming out of light fixture when lights are turn on. Possible balance firing. August 29, 2003 October 15, 2003 47 days
FM-200443416 04 2/27/04 Backus Classrooms #106, #108, #202, #211, #214, #302 and #306 Correct what appears to be circulating problem with heating system in these areas. Bleeding system regularly. Note: This is an old problem. Urgent !!!! January 30, 2004 February 27, 2004 28 days
FM-200447797 04 5/14/04 (Backus) !!!URGENT!!! 1st Floor/Room #107: Restore electrical power to wall outlets; all lights are working. May 11, 2004 May 14, 2004 3 days
FM-200217377 02 6/3/04 Backus ****Urgent**** Rooms 206 [Teachers' Lounge] & 208 1. The ballast is smoking when the switch in room 208 is in the "on" position--replace ballast; and 2. There is a power outtage in the teachers' lounge #206. The breaker has been checked, so there is some other cause of the outtage. September 12, 2002 June 3, 2004 630 days
FM-200451424 04 8/6/04 (Backus) !!!URGENT!!! 1st Floor/Boys, and Girls Lavatories: Repair or replace automotive flush not working. The water over-flows on the commode in the girls. August 4, 2004 August 6, 2004 2 days
FM-200336537 03 9/9/04 (Backus) !!!VERY URGENT!!! 1st Floor/Room #107: No power to electrical outlets. August 28, 2003 September 9, 2004 378 days
FM-200336834 03 9/13/04 (Backus) !!!URGENT!!! 1st, & 2nd Floor: No electrical power to outlets in room #104, #107, and sparks coming from lights. Partial lights in room #206, #211, and sparks are coming from lights. September 4, 2003 September 13, 2004 375 days
FM-200228296 03 9/14/04 (Backus) !!!VERY URGENT!!! 3rd Floor/Room #310: Lights are out in the hallway and room #310 April 4, 2003 September 14, 2004 529 days
FM-200503771 05 4/18/05 (Backus) "Urgent" Kitchen Area. Install electric hot water heater in kitchen area. April 8, 2005 April 18, 2005 10 days
FM-200214999 02 5/3/05 Backus ****Urgent**** 1. Asbestos Assessment Reqd. 2nd Floor Multi-purpose Room 2. Install two electrical outlets, one by the recreation kitchen under the new telepholne outlet; and one by the weight room for the new election polling equipment. The election is on September 10, 2002. Asbestos code A-clear for repair by Horne Engineer ( Philip Connolly ) on 8/20/02 Charles E. Buchanan August 19, 2002 May 3, 2005 988 days
FM-200201951 02 5/3/05 (BACKUS) ASBESTOS ASSESSMENT REQUIRED 2ND FLOOR RECREATION ROOM REPLACE BREAKER #1 IN PANEL BOX (FEDERAL 30 AMP BREAKER WHICH SUPPORTS 2 ROWS OF LIGHTS IS NOT WORKING) ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/29/02 RICHARD GIBSON - SAFETY (202)576-5584 (RG)-01/29/02 January 28, 2002 May 3, 2005 1,191 days
FM-200506120 05 6/27/05 (Backus) "Urgent" Grounds/Pond Area. Furnish and install 6' fence and gate to enclose and secure pond next to tennis court. Note: This is a Safety Hazard. 6' poles are present 3' fencing is also there. Dedication of pond is 06/05/05. May 31, 2005 June 27, 2005 27 days
FM-200108277 01 7/25/05 BACKUS SECOND (2ND) FLOOR CLASSROOM 212 AND ASST. PRINCIPAL OFFICE 1) A/C UNIT IS TRIPPING THE BRAKER SYSTEM THIRD (3RD) FLOOR CLASSROOM 307 - SPOT COOLER AND CLASSROOM 316 - WINDOW A/C UNIT 1) ASBESTOS ASSESSMENT REQUIRED 2) REPLACE PLUGS, NEEDS MORE UPGRADE ELECTRICAL OUTLETS. URGENT! ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/23/01. April 12, 2001 July 25, 2005 1,565 days
FM-200108471 01 7/25/05 BACKUS FIRST (1ST) AND SECOND (2ND) FLOOR CLASSROOMS FURNISH AND INSTALL SIXTY-FOUR (64) ELECTROIC INSTANT START 120 VOLTS 60 HZ BALLAST IN THE FOLLOWING LOCATION CLASSROOM. 102 - 2 202 - 12 208 - 4 105 - 4 204 - 10 210 - 8 106 - 12 206 - 8 212 - 4 SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/02/01. April 16, 2001 July 25, 2005 1,561 days
FM-200457079 /04 8/1/05 Backus Second floor Replace the handle on the hallway door by 214, handle is missing unable to access. Asbestos Code A - Clear for repairs on 10/22/04. DCPS Safety - Leroy Minton Jr. (RG 10/23/04) October 19, 2004 August 1, 2005 286 days
FM-200457081 /04 8/1/05 Backus First and Second floor Realign room doors 104, 208, 205, 213 and 315. Also 4 exit doors need to be realign on the first floor, one on the second floor. This door will not open in case of fire. Asbestos Code A - Clear for repairs on 10/19/04. DCPS Safety - Richard Gibson (RG) October 19, 2004 August 1, 2005 286 days
FM-200457085 /04 8/1/05 Backus First floor Ceiling tile need to be replace in the rooms 104, 105 and 106 to third floor hallways is a lot missing tile throughout the building. Asbestos Code A - Clear for repairs on 10/22/04. DCPS Safety - Leroy Minton Jr. (RG 10/23/04) October 19, 2004 August 1, 2005 286 days
FM-200457273 /04 8/3/05 (Backus) HEALTH CODE VIOLATION: Kitchen: Peeling paint, and plaster in dry goods. Asbestos Code A - Clear for repairs on 10/25/04. DCPS Safety - Leroy Minton Jr. (RG 10/25/04) October 21, 2004 August 3, 2005 286 days
FM-200209261 02 8/3/05 Backus ****Urgent**** 3rd Floor Room 304 [Band Room] The lock on the door to the band room [304] was broken during an attempted break-in. The instruments are badly needed for graudation exercise practice [can not get into the band room]. June 10, 2002 August 3, 2005 1,150 days
FM-200443619 04 8/3/05 (Backus) !!!URGENT!!! 2nd Floor/Cafeteria: Unable too get water, and leaking. 3rd Floor: Unable to get drinking water from the fountain. February 2, 2004 August 3, 2005 548 days
FM-200455462 04 8/3/05 (Backus) !!!VERY URGENT!!! 1st Floor/Room #102: Burning electrical smell; students were moved to another room. September 22, 2004 August 3, 2005 315 days
FM-200447949 04 9/26/05 Backus URGENT Rooms 315, 313 and girlsa locker Key handles were damaged in the following areas by students. Teachers get lock in above rooms and can not get out. VANDALISM May 14, 2004 September 26, 2005 500 days
FM-200222872 /02 12/7/05 (Backus) !!!VERY URGENT!!! 1st Floor/Near nurse's office: Repair or replace water cooler. December 19, 2002 December 7, 2005 1,084 days
FM-200227527 03 12/14/05 (Backus) Parking lot Hamilton St. Lot is coming apart, need refacing before someone gets injured due to loose surface. March 24, 2003 December 14, 2005 996 days
FM-200227552 03 12/14/05 (Backus) Parking lot/Hamilton: Lot is coming apart; lot needs re-facing before someone is injured. March 24, 2003 December 14, 2005 996 days
FM-200220101 /02 12/15/05 (Backus) !!!URGENT!!! 1. Asbestos assessment required. 1st Floor/Boys bathroom: Water leaking from sink; unable to access cut-off valves. October 28, 2002 December 15, 2005 1,144 days
FM-200202031 02 2/3/06 (BACKUS) ***URGENT*** ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR MAIN HALLWAY AREA NEED TO DRILL 12 HOLES IN WALLS TO SUPPORT BRACKETS FOR DISPLAYING FIRE SAFETY PICTORIAL INSTRUCTIONS (WILL BE DONE IN-HOUSE BY MR. GROSS). THE PICTURES WERE PROVIDED BY DCPS & IT IS A FIRE CODE VIOLATION NOT TO HAVE THE PICTURES PROMINENTLY DISPLAYED AT EYE-LEVEL. ASBESTOS CODE A-CLEAR FOR REPAIR ON 1/30/02 BY HORNE ENGINEER: EDWARD RODRIGUEZ January 29, 2002 February 3, 2006 1,466 days
FM-200118868 01 2/3/06 (BACKUS) 3RD FLOOR/ ALL OF THE FLOOR NEED 390 DEFUSER COVERS FOR EGGSHELL CRATE LIGHTS. (SAFETY HAZARD) ISOLATE EMERGENCY!!! August 30, 2001 February 3, 2006 1,618 days
FM-200202074 02 2/3/06 BACKUS !!!! EMERGENCY !!!! SECOND (2ND) FLOOR - ACTIVITY ROOM (WEIGHT AREA) SMELL OF SMOKE IS SMELL IN THE AREA, DONOT KNOW WHERE IT IS COMING FROM. SAFETY HAZARD. January 29, 2002 February 3, 2006 1,466 days
FM-200618318 06 2/6/06 First Floor-Nurse Suite Very Urgent Toilet is running over and the pipe to the toilet is leaking, investigate and repair the problem. Note: The water was turned off February 6, 2006 February 6, 2006 0 days
FM-200210977 02 4/14/06 (Backus) Fire code violation: Page 3 of 4 1. Asbestos assessment required. 2nd Floor/Multipurpose center room: Breach in wall. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 April 14, 2006 1,374 days
FM-200210953 02 4/14/06 (Backus) Fire code violation: Page 1 of 4 3rd Floor/Girls locker room: Breach in wall. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 April 14, 2006 1,374 days
FM-200116502 01 4/14/06 BACKUS 2ND & 3RD FLOOR ASBESTOS ASSESSMENT REQUIRED POINT UP MORTISE JOINTS & CINDER BLOCK WALLS IN THE FOLLOWING CLASSROOMS: 201, 202, 203, 203A, 204, 205, 206, 206A, 208, 210, 211, 212, 214, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 312, 313, 314, 315, 316 & 317 JOINTS ARE WASHING OUT DUE TO HEAVY RAIN. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/27/01. CHARLES BUCHANAN - SAFETY (202)576-5582 August 1, 2001 April 14, 2006 1,717 days
FM-200210979 02 4/18/06 (Backus) Fire code violation: Page 4 of 4 1. Asbestos assessment required. 1st Floor/Main office: Breach in wall next to office #1. Asbestos Code A clear for repairs, on 7/11/02 DCPS Safety, L. Minton (RE - 7/11/02) July 10, 2002 April 18, 2006 1,378 days
FM-200620387 06 5/8/06 First & Second floors. "Urgent" 1.) First floor remount or replace electrical box that is hanging from the wall. 2.) Second floor/Rec. Area, repair or replace breaker # 1 (R) that has a shortage, the breaker is continuously tripping. March 27, 2006 May 8, 2006 42 days
FM-200513750 /05 6/2/06 Backus Urgent Front Side Of Building-Entrance Door near Gallatin St. Exit Install hand rail on the Steps, the railing has rusted away, also the steps have shifted need to be repaired October 12, 2005 June 2, 2006 233 days
FM-200617642 06 6/7/06 "Urgent" Lower Level, Kitchen Area. Install Circulation pump in kitchen. January 20, 2006 June 7, 2006 138 days
FM-200627553 06 10/10/06 Second Floor/Rm. 206 missing safety glass. Asbestos Code A - Clear for repairs on 08/16/06. Tidewater - Kenny Long (RG 08/17/06) August 15, 2006 October 10, 2006 56 days
FM-200504002 05 10/23/06 (Backus, Bernie) "Urgent" Asbestos Assessment Required. Throughout building. Replace a broken glass in room 208 (1) panel, Rec. Area (1) door glass and Office in Boys' locker room (1) glass. Asbestos Code A - Clear for repairs on 04/14/05. DCPS Safety - Leroy Minton Jr. (RG 04/14/05) April 13, 2005 October 23, 2006 558 days
FM-200216431 02 12/6/06 Backus Asbestos Assessment Reqd. 3rd Floor Classroom 308 Repair holes in the sheet-rock wall in classroom 308 by the door and storage room. Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) September 4, 2002 December 6, 2006 1,554 days
FM-200512538 05 1/11/07 Backus Urgent Door by room 101 is broken and need to be repaired/replaced Code A-clear for repair by DCPS Charles Buchanan on 9/16/05 September 14, 2005 January 11, 2007 484 days
FM-200453184 04 1/11/07 Backus First, Second Floor - Main Entrance - 104 and 205 1) Re-align entrance door on Main Lobby, Room 104 and Storage Room 205., so Locksmith can secure door. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton (RG 08/27/04) August 23, 2004 January 11, 2007 871 days
FM-200453430 04 1/11/07 Backus exterior first by the big parking lot Repair door the hinge reattach and panic bar. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton (RG 08/27/04) August 26, 2004 January 11, 2007 868 days
FM-200513752 /05 1/11/07 Backus Urgent Install a new A/C unit in the window of rooms 304, and 316 October 12, 2005 January 11, 2007 456 days
FM-200206736 02 1/29/07 ****Urgent**** 1. Asbestos Assessment Reqd. 1st Floor Auditorium 2. Install electrical plugs on right side of Aisle F. The junction box is under the seat. This is for a special media event "Together for Freedom" to take place april 30, 2002. Code A Clear For Repair by Horne Engineering (Sheryll James) 04-26-02. DCPS Sheila R. Howard 04-26-02 April 26, 2002 January 29, 2007 1,739 days
FM-200460111 /04 1/29/07 Backus URGENT Room 308 Furnish and install flourescent lights for the journalize lab. December 29, 2004 January 29, 2007 761 days
FM-200508965 05 1/30/07 Backus Auditorium Correct problem that causing two (2) window A/C units to trip electric circuit breaker when in operation. Urgent !!!! July 28, 2005 January 30, 2007 551 days
FM-200515874 /05 1/30/07 Urgent: Second Floor-Recreational Area: electrical outlets have sparks coming from them one on the wall and one on the column. November 29, 2005 January 30, 2007 427 days
FM-200512622 05 1/30/07 (Backus) "Urgent" First floor, Main Office. Need electricians to assess and repair problem. A/C units have shut off temperature is extremely hot!! September 15, 2005 January 30, 2007 502 days
FM-200626368 06 1/30/07 Second Floor/Rm. 208 - Door glass broken Asbestos Code A - Cleared for repairs on 08/02/06 by Tidewater/Kenny Belton (LM-08/02/06) Safety Office 202-576-8962. July 26, 2006 January 30, 2007 188 days
FM-200206783 02 2/6/07 ****Urgent**** 1. Asbestos Assessment Reqd. 2nd Floor Recreation Room 2. Reattach electrical box to the wall. The box is live and there are exposed wires. 3. Install an (2) electrical outlet (plug for telephone rack to electrion office) in the rec room near the weight room. Code A-clear for repair by Horne Engineer by ( Philip Connolly ) on 4/26/02 ( CEB ) April 29, 2002 February 6, 2007 1,744 days
FM-200218268 02 2/6/07 Backus ****Urgent**** Basement Boiler Room Newly installed sump pump is not working and water is all over the floor. Workers who would be working in the boiler room will not work with the water all over the floor. September 25, 2002 February 6, 2007 1,595 days
FM-200207546 02 2/6/07 Backus !!! Emergency !!! Third (3rd) Floor - Girls Locker Restroom Two (2) Sink. Water is leaking all over the floor. Two (2) Toilet and T-Trap. Not working properly. Safety Hazard. May 10, 2002 February 6, 2007 1,733 days
FM-200227550 03 2/6/07 (Backus) Panel Box: Shortage in breaker box, one (1) circuit keeps kicking out. Asbestos Code A - Clear for repairs on 03/24/03. DCPS Safety - Richard Gibson (RG) March 24, 2003 February 6, 2007 1,415 days
FM-200517014 /05 2/6/07 Backus Classrooms Replace burnt out motors on univent in room #101, #104, #106,#206, #204, #302, #314 and #304 Urgent !!!! December 29, 2005 February 6, 2007 404 days
FM-200513146 05 2/6/07 (Backus) "Urgent" Near lobby. Electrical boxes are about to fall off of wall, they are currently being held in by two screws. September 26, 2005 February 6, 2007 498 days
FM-200502495 05 2/6/07 {Backus) "Very Urgent" Asbestos Assessment Required. Second/Third floor. Replace missing ceiling tile on second and third floor. Students knocked tile down. Notice: Urgent dust falling from ceiling Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/15/05) March 10, 2005 February 6, 2007 698 days
FM-200213527 02 2/6/07 Backus ****Urgent**** 1. Asbestos Assessment Reqd. 1st & 3rd Floors/Classrooms 102 and 308 2. Repair breaches in wall: Room 102--breach left from repair measures 12"X12"; Room 308--breach left in sheet-rock wall measures 2' across by 3' in height. School due for re-inspection by fire marshall on 8/8/02----need repair ASAP. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/20/02) August 5, 2002 February 6, 2007 1,646 days
FM-200504339 05 2/20/07 ( BACKUS ) URGENT!!!! Rooms 301-303 1) The electrical plugs are burned out. 2) The panel box on the side, the brakers are broken. (principal is requesting to upgrade the electricity in whole building) April 20, 2005 February 20, 2007 671 days
FM-200511565 05 2/21/07 Backus Boiler Room Repair or replace couplin 1 1/4" on pump. Repair or replace hot water circulating pump #1 and #2 both pumps not working properly, need work badly, Urgent !!!!! August 30, 2005 February 21, 2007 540 days
FM-200218488 02 3/20/07 Backus ****Urgent**** Asbestos Assessment Reqd. 1st Floor Room 104 Replace/upgrade lights and ballasts. The ballast exploded in room 104. POC: Mr. Belzher 576-6112 Asbestos Code A - Clear for repairs on 09/30/02. Horne Engineering - Bipin Nanavaty ( RG 10/01/02) September 27, 2002 March 20, 2007 1,635 days