Urgent Open Repair Requests

See Also: All Open Repair Requests at Backus Middle School

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200205529 4/8/02 Backus 1. Asbestos Assessment Reqd. 1st Floor Boiler Room 2. Install an outlet to support the new sump pump [will have to use an extension cord otherwise]. 3. Reanchor the ceiling lights which have broken supports. 4. Repair light which is hanging from several exposed wires. These problems could precipitate safety issues. Code A-clear for repair by Honre Engineer (Stephen Caldwell ) on 4/09/02 CEB April 8, 2002
FM-200222869 12/19/02 (Backus) !!!VERY URGENT!!! 3rd floorl, Girls Gym locker room: Hand basin sink stopped with tar in the waste line, needs to be check out. December 19, 2002
FM-200333881 7/28/03 (Backus) !!!VERY URGENT!!! 2nd Floor/Room #209: Air conditioner leaking in science classroom; water is running in-to the next classroom, and the floor below. July 28, 2003
FM-200449008 6/7/04 Backus URGENT Kitchen Repair or replace exhaust fan motor in kitchen hood. June 7, 2004
FM-200452178 8/11/04 (Backus) !!!VERY URGENT!!! Asbestos Assessment Required. 3rd Floor/Shower Room: Ruptured pipe in floor drain, leaking down in-to the cafeteria locker-room. HA 032 Plaster White No Asbestos HA 732 Brown Coat No Asbestos HA 035 Tile grout gray with 1" X 1" ceramic floor tiles No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 9/20/05 August 11, 2004
FM-200512820 9/19/05 Backus Boiler Room Repair or replace city water regulator on main line, leaking very bad. Urgent !!!! September 19, 2005
FM-200517012 12/29/05 Backus Classrooms Replace burnt out motors on univent in room #101, #104, #106,#206, #204, #302, #304 and #314 Urgent !!!! December 29, 2005
FM-200618455 2/8/06 Ground floor, Kitchen Area. "Urgent" Repair leaking showers, water is leaking down in kitchen area. Note: This is a health hazard. Asbestos Code A - Clear for repairs on 02/08/06. Tidewater - Philp Connolly (RG 02/09/06) SEE ASSESSMENTS February 8, 2006
FM-200701251 3/8/07 1st Floor, Room: Main Office Remove (2) electrical plugs from the floor which is a hazard, and replace it with two electrical pole is urgent. March 8, 2007