Urgent Open Repair Requests

See Also: All Open Repair Requests at Horace Mann Elementary School

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200445593 3/19/04 Mann Urgent !!!! Entrance Door in the Back 1) Repair or replace door that is bent...Door can not be secured. Asbestos Code A - Clear for repairs on 03/22/04. Horne Engineering - Nanavaty Bipin (RG 03/24/04) March 19, 2004
FM-200458034 11/8/04 Mann First Floor RM 105 Plaster is falling onto floor and also water leaks. Asbestos Code A - Clear for repairs on 11/09/04. DCPS Safety - Leroy Minton Jr. (RG 11/09/04) November 8, 2004
FM-200506376 6/6/05 (Horace Mann) "Urgent" Asbestos Assessment Required. Ground, Rear of cafeteria and Rear main entry. Replace rear door in cafeteria and main entry door in rear of building. Asbestos Code A - Clear for repairs on 06/16/05. Tidewater - Rodney Distance (RG 06/22/05) June 6, 2005
FM-200508704 7/26/05 Mann Boiler Room Repair or replace sump pump, pump will not empty pit. #2 Pump will not run in automatic. Causingmaintenance office to flood. Boiler room flooded and equipment , water is every where. Urgent !!!!! July 26, 2005
FM-200618936 2/21/06 Exterior of Building, Playgroung Area. Reattached cover to drinking fountain. Note: The cover is loose on the playground, this is a safety hazard. February 21, 2006
FM-200620134 3/21/06 Very Urgent First Floor-Boys Restroom-Repair or Replace partition, its down Asbestos Code A - Clear for repairs on 03/23/06. Tidewater - Kenny Long (RG 03/24/06) March 21, 2006
FM-200630031 -200630031 9/26/06 Outside steps leading to the field are very dangerous, cement is broken leaving holes. September 26, 2006

© The Washington Post Company