Urgent Closed Repair Requests

See Also: All Closed Repair Requests at John Burroughs ES

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200117638 01 9/7/01 (BURROUGHS) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ BOYS BATHROOM SINK KNOBS ARE MISSING AND SINK WATER RUNS. CODE A-CLEAR FOR REPAIR BY DCPS SAFETY RONALD EDWARD 8/18/01. (CEB) August 16, 2001 September 7, 2001 22 days
FM-200119203 01 9/13/01 (BURROUGHS) !!!!!EMERGENCY!!!!! 1ST FLOOR/CORRIDOR: REPAIR FOUNTAINS, LEAKING NEAR ROOM #14 (MAIN BUILDING, AND ROOM #27 (ANNEX). FOUNTAINS HAVE BEEN SHUT OFF, NO DRINKING WATER IN THE AREA. (NO PENETRATION) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/07/01. RONALD EDWARDS - SAFETY (202)576-669 (RG) September 5, 2001 September 13, 2001 8 days
FM-200119579 01 9/21/01 (BURROUGHS) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ BOYS BATHROOM KNOB IS MISSING OFF THE SINK FAUCETS IS LEAKING WATER. WONT STOP RUNNING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/11/01. LEROY MINTON - SAFETY (202)576-6693 September 10, 2001 September 21, 2001 11 days
FM-200118265 01 9/24/01 (BURROUGHS) ASBESTOS ASSESSMENT REQD. 1ST. FLOOR AND BASEMENT HUNTON AREA REPLACE FLOOR TILE ON TWO STEPS IN THE STAIRWELL. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/24/01 RONALD EDWARDS - SAFETY (202)576-6693 August 23, 2001 September 24, 2001 32 days
FM-200123560 /01 11/26/01 (BURROUGHS) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR, RM 30/NEW WING REPLACE DOOR WHICH IS HANGING OFF ITS FRAME CREATING A SECURITY AND SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/19/01. HORNE ENGINEERING - SHARON VOSS (RG) November 16, 2001 November 26, 2001 10 days
FM-200122449 /01 12/10/01 BURROUGHS Electrical problem in room 22 Ms.Simmons needs more outlets in in the room.Room 22,has an bad outlet blows everything out, outlet catch fire. Fire code violation.Emergency Requester Phone: 2025766039 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/02/01. CHARLES BUCHANAN - SAFETY (202)576-5582(RG) October 23, 2001 December 10, 2001 48 days
FM-200124714 01 12/21/01 (BURROUGHS) !!URGENT!! 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/NEW WING: REPAIR OR REPLACE CLASSROOM DOOR THAT HAS COME COMPLETELY AWAY FROM THE HINGE. (INSTRUCTED SUPERVISOR TO REMOVE DOOR, STORE AWAY TO PREVENT INJURY, UNTIL REPAIR PERSONNEL ARRIVES) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/04/01. HORNE ENGINEERING - STEPHEN CALDWELL (RG) December 7, 2001 December 21, 2001 14 days
FM-200112310 01 1/17/02 BURROUGHS FIRST FLOOR STAIRS 1) REPLACE RUBBER TREADS ON STAIRS IN NEW BUILDING TREADS COMING APART ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/23/01. RONALD EDWARDS - SAFETY (202)576-6691 (RG) June 4, 2001 January 17, 2002 227 days
FM-200201245 02 2/5/02 (BURROUGHS) OUTSIDE FIELD NEED A FENCE AROUND THE WHOLE FIELD TO CLOSE CAMPUS FOR CHILDREN SAFETY DURING RECESS AND SCHOOL ACTIVITY. (I.E. FIELD DAY) January 16, 2002 February 5, 2002 20 days
FM-200204085 02 3/19/02 (Burroughs) 1st Floor/Middle hallway: Slop sinks are stopped up; sinks are full to the top with water and will not go down. Sinks are used for cleaning and washing mops. Asbestos Code A - Clear For Repairs On 03/08/02. Richard Gibson - Safety (202)576-5584 (RG 03/08/02) March 7, 2002 March 19, 2002 12 days
FM-200206628 02 4/29/02 Burroughs ****Urgent**** 1st Floor/New Wing Room #25 All the lights are out in the classroom. April 25, 2002 April 29, 2002 4 days
FM-200201020 02 6/12/02 (BURROUGHS) GROUND FLOOR/ NEW WING DOOR CLOSURE IS OFF THE FRAME OF THE DOOR. DOOR ALMOST FELL AND HIT A STUDENT. SAFETY HAZARD. Asbestos Code A - Clear for repairs on 05/09/02. Horne Engineering - Sheryll James (RG 05/10/02) January 14, 2002 June 12, 2002 149 days
FM-200121779 01 7/2/02 (BURROUGHS) 1. ASBESTOS ASSESSMENT REQUIRED. Outside on 18th&NEWTON fence broken,railing broken off of cement stairs Requester Phone: 2025766039 Requestor Phone: 2025766039 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/16/01. SHEILA R HOWARD - SAFETY (202)576-8962 (RG) October 2, 2001 July 2, 2002 273 days
FM-200210675 02 7/22/02 (Burroughs) Fire code violation Page 1 of 2 1st floor/Room #11 Ceiling tile missing in room #11 Asbestos Code A - Clear for repairs, on 7/02/02 DCPS Safety - R. Edwards (RE- 7/02/02) July 1, 2002 July 22, 2002 21 days
FM-200216455 02 9/30/02 Burroughs First Floor - New Boys Restroom 1) Boys annex bathroom (2) toilets leak from the bottom when flushing. First Floor - New Wing - Girls Restroom 2) Toilet leaks when flushing. Lower Level - Girls Restroom 3) Two toilets leaks water when flushing. First Floor - Teachers Restroom Women 4) Water leaks from bottom of toilet. Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Richard Gibson (RG) September 4, 2002 September 30, 2002 26 days
FM-200123218 01 10/15/02 (BURROUGHS) 1. ASBESTOS ASSESSMENT REQUIRED. New wing double doors lead to outside.Door hard to close,uneven CODE A - CLEAR FOR REPAIRS (BY HORNE ENGINEERING, EDWARD RODRIGUEZ 11/21/01) S. HOWARD DCPS SAFETY 11/23/01 November 1, 2001 October 15, 2002 348 days
FM-200222678 /02 1/4/03 Burrough First floor - teacher lounge new wing Replace faucet that is broken off. Urgent December 17, 2002 January 4, 2003 18 days
FM-200221193 /02 3/4/03 (Burroughs) !!!VERY URGENT!!! Main building/1st Floor: Radiator leaking from top post. (Repair personnel are replacing floor tile on the floor in that room, water is ruining the floor.) Asbestos Code A-clear for repair by Horne Engineer Philip Connolly DCPS Charles Buchanan November 18, 2002 March 4, 2003 106 days
FM-200224087 03 3/17/03 (Burrough) !!!URGENT!!! New Wing/Room #29: Change ballast that caught fire last night. The fire department was called, and the switch was shut off. Asbestos Code A - Clear for repairs on 01/17/03. Horne Engineering - Tony Marcolin (RG 01/22/03) January 16, 2003 March 17, 2003 60 days
FM-200224336 03 3/26/03 BURROUGHS Room 21 "URGENT CAN NOT BE ISOLATED" Asbestos assessment required Repair leak on supply line to radiator (can not be isolated). Leak is before the raditator valve and can not be isolated. ( no insulation on line.) Mr. R. Miller in route to respond to call Asbestos A-clear for repair by Horne Engineer Sharon Voss on 01-24-03 Charles Buchanan January 22, 2003 March 26, 2003 63 days
FM-200104286 23/01 4/7/03 BURROUGHS FIRST (1ST) FLOOR CLASSROOMS - 25, 28, 30 AND 35. REPLACE BALLAST TO BE REMOVED. BALLAST IS LEAKING OIL. SAFETY RECOMMENDS BUILDING STAFF NOT REMOVE LEAKING BALLASTS. SAFETY HAZARD ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/20/01. HORNE ENGINEERING - EDWARD RODRIGUEZ (RG) February 23, 2001 April 7, 2003 773 days
FM-200103269 /8/01 4/16/03 BURROUGH PLAYGROUND REPLACE SAFETY TURF UNDER PLAYGROUND SET. February 8, 2001 April 16, 2003 797 days
FM-200226432 03 6/3/03 BURROUGHS !!URGENT !! FIRST FLOOR - MULTI PURPOSE ROOM 1. BREAKER TRIPS EACH TIME LIGHTS ARE ON. 2. THE CEILING LIGHTS BLOW FREQUENTLY . ( APPROXIMATLY EVERY TWO WEEKS) February 28, 2003 June 3, 2003 95 days
FM-200219881 /02 7/28/03 Burroughs First floor - 28 - Ms. Hector, 29 Ms, Simpson, 30 Ms. Nelan, 31 Ms. Hollaway Classroom lighting fixtures to be upgraded. Existing lighting is inadequate. Ballasts cannot be changed due to the way they are positioned in the fixtures. Asbestos Code A - Cleared for repairs on 01-17-03 by Leroy Minton Jr. (LM/01-17-03) Safety Office (202) 576-8962. October 23, 2002 July 28, 2003 278 days
FM-200442796 04 1/16/04 (Burroughs) !!!VERY URGENT!!! Asbestos Assessment Required. 1st Floor/Parking Lot Exit Door: Repair or replace Broken lock, unable to secure. January 15, 2004 January 16, 2004 1 day
FM-200452015 04 8/20/04 (Burroughs) FIRE CODE VIOLATION: 1st Floor Hallway Behind Cafeteria: Missing ceiling tile. Asbestos Code A - Clear for repairs on 08/11/04. DCPS Safety - Richard Gibson (RG) August 10, 2004 August 20, 2004 10 days
FM-200452026 04 8/20/04 (Burroughs) FIRE CODE VIOLATION: 1st Floor/Room #3: Missing ceiling tile over entrance. Asbesstos Code A - Clear for repairs on 08/11/04. DCPS Safety - Richard Gibson (RG) August 10, 2004 August 20, 2004 10 days
FM-200452017 04 9/9/04 (Burroughs) FIRE CODE VIOLATION: 1st Floor/Mens Restroom: Broken door closer. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton Jr. (RG 08/28/04) August 10, 2004 September 9, 2004 30 days
FM-200452016 04 9/27/04 (Burroughs) FIRE CODE VIOLATION: 1st Floor/Door to Room #4: Broken door closer. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton Jr. (RG 08/28/04) August 10, 2004 September 27, 2004 48 days
FM-200452007 04 9/29/04 (Burroughs) FIRE CODE VIOLATIONS: 1st Floor/Health Suite: Falling plaster. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton Jr. (RG 08/28/04) August 10, 2004 September 29, 2004 50 days
FM-200452004 04 10/13/04 (Burroughs) FIRE CODE VIOLATIONS: 1st Floor/Room #14: Repair damaged door assembly. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Richard Gibson (RG 08/28/04) August 10, 2004 October 13, 2004 64 days
FM-200457307 /04 12/7/04 Burroughs All areas below need to be assessed. 1) Room -1 - scrape and paint ceiling only - 1,152sf 2) Room -8 - scrape and plaster window wall only. 400 sq. ft. 3) Room -15 - scrape, plaster and paint ceiling only. 840 sq ft. 4) Room 17 - scrape, plaster and paint ceiling only. 2,200sq. ft. 5) Stairwell 39 and 49 - scrape and paint ceiling only. 880 sq. ft. 6) Room 37 - scrape and paint ceiling only . 184 sq. ft. 7) Room 40 - scrape and paint ceiling only .782 sq. ft. 8) Room 47 and 48 - paint ceiling, 2 walls and 2 windows.1, 300 sq ft. 9) Room 50 and 51 - scrape, plaster and paint walls ceiling. 1,950 sq.ft. 10) Room 54 and 55 - scrape and paint ceiling only . 920 sq. ft. 10) Room 56 and 57 - scrape and paint ceiling only . 920 sq. ft. 10) Room 81 and 82 - scrape and paint ceiling only . 920 sq. ft. 10) Room 83 and 84 - scrape and paint ceiling only . 920 sq. ft. 10) Room 85 and 86 - scrape and paint ceiling only . 920 sq. ft. 10) Room 87 - scrape and paint ceiling only . 920 sq. ft. 10) Room 54 and 55 - scrape and paint ceiling only . 184sq. ft. Poc - A. Biddy - 576-6397 Asbestos Code A - Clear for repairs on 10/21/04. DCPS Safety - Leroy Minton Jr. (RG 10/22/04) October 22, 2004 December 7, 2004 46 days
FM-200451120 04 12/29/04 Burrough All classrooms need more outlets in them. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton Jr. (RG 08/28/04) July 29, 2004 December 29, 2004 153 days
FM-200456039 04 6/10/05 Burroughs First floor rooms 27, 28, 29, 30, 31 and 33 We have 6 A/C units that need to be put in windows with outlets. ASAP Code A - clear for repairs as of 10/12/04 safety Sylvia. September 29, 2004 June 10, 2005 254 days
FM-200451121 04 6/20/05 Burrough First floor hallway 2 of them change twist 4-pole, 5 wires, 3-phase, 120/208 volts AC to 240 120 / 10 %. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton Jr. (RG 08/28/04) July 29, 2004 June 20, 2005 326 days
FM-200456935 /04 8/1/05 Burroughs Exterior Grounds 1) Change safety rails. Poc - Oscar Mebane - 202-345-0688 October 18, 2004 August 1, 2005 287 days
FM-200508599 05 9/22/05 Burroughs Fire Code Violation IFC 110.0 First Floor - Over Entrance Door - Room 34 1) Missing ceiling tile. Asbestos Code A - Clear for repairs on 07/26/05. DCPS Safety - Richard Gibson (RG) July 25, 2005 September 22, 2005 59 days
FM-200214942 02 9/26/05 Burroughs ****Urgent**** 1) Please relocate existing 10,000 BTU window A/C unit from room (4) to room (16) and install electrical outlet to accomodate same. Patch or secure hole in window where A/C unit was removed from in room ( 4 ). August 19, 2002 September 26, 2005 1,134 days
FM-200453697 04 9/26/05 Burroughs First Floor - Computer Lab 1) Install floor tile over protruding nails. Two students were injured last year. Computer Lab room10 have wooden floor with nails protruding from wooden floor. The wooden floor need to be level off with ply board before non asbestos floor tile is used. Code A-clear for repair by DCPS Charles Buchanan on 8/31/04 August 31, 2004 September 26, 2005 391 days
FM-200123394 01 9/26/05 (BURROUGHS) ASBESTOS ASSESSMENT REQUIRED Room 36 heater is not working, cannot turn it on. Requester Phone: 2025766039 CODE A - CLEAR FOR REPAIRS (BY HORNE ENGINEERING, EDWARD RODRIGUEZ 11/21/01) S. HOWARD DCPS SAFETY 11/23/01 November 9, 2001 September 26, 2005 1,417 days
FM-200504873 05 10/17/05 ( BORROUGHS ) !!!URGENT!!! First Floor - Women Restroom 1) Toilet over flows, water comes out bottom when flushed, and water wont go down. April 28, 2005 October 17, 2005 172 days
FM-200506615 05 10/19/05 (BURROUGHS) URGENT!!!! First Floor - Ladies Restroom by the kitchen 1) Repair Toilet, water is comming out from the bottom June 10, 2005 October 19, 2005 131 days
FM-200452013 04 12/27/05 (Burroughs) FIRE CODE VIOLATIONS: 1st Floor/Classrooms Through-Out: Missing safety wire glass. August 10, 2004 December 27, 2005 504 days
FM-200452002 04 12/27/05 (Burroughs) FIRE CODE VIOLATIONS: 1st Floor/Right Side : Safety glass missing in main hallway. August 10, 2004 December 27, 2005 504 days
FM-200122044 01 2/3/06 (BURROUGHS) 1. ASBESTOS ASSESSMENT REQUIRED. I have 6 restrooms that have concrete floors and they are breakin up. I need them changed to tile floors: Main Building: Men & Women 1st floor, Boys & Girls 1st floor, Boys & Girls basement restrooms. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/04/01. LEROY MINTON - SAFETY (202)576-6691 October 5, 2001 February 3, 2006 1,582 days
FM-200202105 02 2/3/06 BURROUGHS LIBRARY ASBESTOS ASSESSMENT REQUIRED 1) PAINT CEILING IN THE LIBRARY. CODE A CLEAR FOR REPAIR-01-21-02 SAMPLES COLLECTED BY RONALD EDWARDS OF DCPS SAFETY 01-18-02. AMA CHAIN OF CUSTODY #91057/DCPS SAFETY-SHEILA R. HOWARD 01-31-02. SAMPLE RESULTS GIVEN TO GREGORY WILLIAMS OF USACE AND MARGO MONROE BSM, DIVISION#3 SAME AS FM-2002014118 ASBESTOS CODE A-CLEAR FOR REPAIR ON 2/05/02 BY HORNE ENGINEER: EDWARD RODRIGUEZ January 30, 2002 February 3, 2006 1,465 days
FM-200123580 /01 2/3/06 (BURROUGHS) ASBESTOS ASSESSMENT REQUIRED REPLACE/REPAIR BROKEN DOOR, WHICH CREATES A SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/19/01. HORNE ENGINEERING - SHARON VOSS (RG) November 19, 2001 February 3, 2006 1,537 days
FM-200120677 01 2/3/06 (BURROUGHS) ASBESTOS ASSESSMENT REQ. 1ST CORRIDOR (WEST) COMPLETE INSTALLATION OF CEILING TILE. NO TILE IN AREA. PROJECT WAS STARTED BY CONTRACTOR AND STOPPED BECAUSE OF IMPROPER PROCEDURES. POC: JOHN RIDGLEY - 202-889-8400 HRGM CORP ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/23/01. RONALD EDWARDS - SAFETY (202)576-6691 (RG) September 28, 2001 February 3, 2006 1,589 days
FM-200120897 01 2/20/06 (BURROUGHS) !!VERY URGENT!! 1. ASBESTOS ASSESSMENT REQUIRED. Room 15 wood floor is breaking up real bad holes in are in the floor.Please send so one out it is urgent Requester Phone: 2025766039 Requestor Phone: 2025766039 ASBESTOS CODE A - CLEAR FOR REPAIR ON 10/03/01, BY SAM EBRAHIM - HORNE ENGINEERING (RE-10/04/01) September 28, 2001 February 20, 2006 1,606 days
FM-200456013 04 4/20/06 Burroughs First floor girls restroom 3rd and 7th door panel broken off hinges. Asbestos Code A - Clear for repairs on 09/29/04. DCPS Safety - Richard Gibson (RG) September 28, 2004 April 20, 2006 569 days
FM-200456032 04 4/20/06 (Burroughs) 1st Floor girls restroom Lower level 2 Door panels broken off on first floor. Girls restroom door panel broken off on lower level. Asbestos Code A - Clear for repairs on 09/29/04. DCPS Safety - Richard Gibson (RG) September 29, 2004 April 20, 2006 568 days
FM-200451118 04 4/21/06 Moten First floor office Door entry missing five tiles on floor. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Leroy Minton Jr. (RG 08/28/04) July 29, 2004 April 21, 2006 631 days
FM-200622038 06 5/3/06 Urgent! Basement- Boys Bathroom The shut-off valve is stripped. The toilet is making a loud whistling noise. There is no overflow or leaking. May 1, 2006 May 3, 2006 2 days
FM-200450354 04 5/19/06 Burrough Lower level rooms 18, 20, 21, 22 Ceiling pealing real bad. Asbestos Code A - Clear for repairs on 10/13/04. DCPS Safety - Leroy Minton Jr. (RG 10/13/04) July 16, 2004 May 19, 2006 672 days
FM-200456023 04 8/1/06 Burroughs First floor multi purpose VENTs Heater grates are broken need repairing. Code A - clear for repairs as of 10/12/04 safety Sylvia September 29, 2004 August 1, 2006 671 days
FM-200455486 04 8/14/06 (Burroughs) 1st Floor/Health Suite: Replace carpet with vinyl floor tiles. Duplicate FM-200447799 Code A - clear for repairs as of 5/12/04 Horne Eng. Duplicate Sylvia Grimes safety. September 22, 2004 August 14, 2006 691 days
FM-200630777 /06 10/16/06 Burroughs Boiler Room Repair or replace feed pumps and vacuum pumps for boilers #1 and #2. Urgent !!!!! October 16, 2006 October 16, 2006 0 days
FM-200630022 06 11/30/06 Burroughs Boiler Room Check and correct problem to domestic hot water heater. Urgent !!!!!! September 26, 2006 November 30, 2006 65 days
FM-200456024 04 1/12/07 Burroughs Lower level boys restroom Behind toilet grates are broken and rusted. Code A - clear for repairs as of 10/12/04 custodian say work is done Safety Sylvia. September 29, 2004 January 12, 2007 835 days
FM-200456031 04 1/22/07 (Burroughs) 1st Floor Office Door entry missing five tiles on floor. Code A - clear for repairs as of 10/12/04 safety Sylvia. September 29, 2004 January 22, 2007 845 days
FM-200456014 04 1/22/07 Burroughs First floor Ms. Hollaway # 14 Missing door panel. Code A- clear for repairs was told that work was complete by custodian. safety Sylvia September 28, 2004 January 22, 2007 846 days
FM-200455485 04 1/22/07 (Burroughs) 1st Floor/Computer: Prep, and install vinyl floor in the computer lab. Asbestos Code A - Clear for repairs on 09/23/04. DCPS Safety - Richard Gibson (RG) (Related to FM-200453697) September 22, 2004 January 22, 2007 852 days
FM-200502884 05 1/22/07 Burrouhs Lower Level Install Weather Strip on Door Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) March 17, 2005 January 22, 2007 676 days
FM-200630491 06 1/22/07 Bourroughs Boiler Room Repair or replace both sump pump in Boiler Room Unclog (4) four floor drain in the Boiler Room Urgent !!!!! October 5, 2006 January 22, 2007 109 days
FM-200449608 04 1/22/07 Burrough First floor girls restroom Lower level girls restroom. Two (2) door panels broke off on first floor. On lower level panel broke off. Code A - clear for repairs as of 6/25/04 by DCPS safety Sylvia Grimes. June 22, 2004 January 22, 2007 944 days
FM-200506616 05 1/26/07 (BURROUGHS) URGENT!!!! First Floor - Kitchen 1) No cold water, it comes out hot. June 10, 2005 January 26, 2007 595 days
FM-200504124 05 1/26/07 ( BURROUGHS ) Lobby Area 1) Replace ballast. (4 tube triadelectronic balance B432I120RH-A imput-120 volts 60 universal) Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) April 15, 2005 January 26, 2007 651 days
FM-200457973 04 1/26/07 Burroughs Ms. M. Jones (science) Do not have extension pipe. Need projector mounted to ceiling with a 1 1/2" CMA extension column. Ceiling mate CMA, beam clamp with 1/2 dig u-bolt. Need CMA pole everything else is on sight. We have direction for installation. Asbestos Code A - Clear for repairs on 02/01/05. DCPS Safety - Leroy Minton (RG 02/01/05) November 5, 2004 January 26, 2007 812 days
FM-200208210 02 1/26/07 Burroughs ****Urgent**** 1. Asbestos Assessment Reqd. Rooms #16 & 11 2. Complete installation of droped ceiling which contractors left in a state of incompletion in room 16. 3. Install missing ceiling panel in room 11. Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) on 5/28/02 May 22, 2002 January 26, 2007 1,710 days
FM-200504329 05 1/30/07 ( JOHN BURROUGHS ) First Floor - Room 3 1) Install board, need to be hung up on wall (wall is cement brick). (Having a class on 4/25/05) Asbestos Code A - Clear for repairs on 04/20/05. DCPS Safety - Richard Gibson (RG) April 20, 2005 January 30, 2007 650 days