Closed Repair Requests: January 2006

See Also: All Closed Repair Requests at Ballou Senior High School

January 2006 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 638 Days
  • Routine Requests
    7
    Average Time Elapsed: 42.9 Days
  • Total Requests
    8

Detailed Reports

Urgent Repair Requests Completed in January 2006 (1)
Description Open Date Close Date Time Elapsed
FM-200447350 04 1/27/06 (Ballou) 1st.floor health suite-rekey knob locks for access to five rooms(urgent) April 29, 2004 January 27, 2006 638 days

Routine Repair Requests Completed in January 2006 (7)
Description Open Date Close Date Time Elapsed
FM-200511899 05 1/3/06 Ballou Fire Code Violation B-Broken exit light in the armory September 6, 2005 January 3, 2006 119 days
FM-200511898 05 1/3/06 Ballou Fire Code Violation B-Exit light not illuminated near armory September 6, 2005 January 3, 2006 119 days
FM-200517086 06 1/19/06 Repair/Replace leaver lock on door, staff are unable to secure room. January 3, 2006 January 19, 2006 16 days
FM-200617638 06 1/20/06 "Emergency" First floor, Room 110 Open and repair combination lock set. Note: Students and Staff are unable to gain entry to classroom. January 20, 2006 January 20, 2006 0 days
FM-200617944 06 1/29/06 Health Suite - Replace lock for medical record cabinet located in the health suite conference room. Clifton C. Purks, III Code & Compliance Officer (202) 576-6049 January 27, 2006 January 29, 2006 2 days
FM-200517087 06 1/30/06 Furnish and install panic bar to entry door,this was listed as a violation as of 8,2005 January 3, 2006 January 30, 2006 27 days
FM-200617400 06 1/30/06 Emergency: Open and re-key the lock on the door to the humidifier room on the first floor; cant get into the room to change the filter; there is a strong odor in the building. January 13, 2006 January 30, 2006 17 days

© The Washington Post Company