Closed Repair Requests: November 2005
See Also: All Closed Repair Requests at Ballou Senior High School
November 2005 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200228594 03 11/16/05 (Ballou) !!!VERY URGENT!!! 1st Floor/Room #103: Damaged floor check, and other damaged parts near floor. Engineer called at 2:30 p.m., stating that the door fell on a teacher, and the door was removed. Door should be re-hung, as this is a science lab and chemicals in this room will not be secure. Asbestos Code A - Clear for repair on 04/11/03. Horne Engineering - Sheryll James (RG 04/11/03) |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200511869 05 11/10/05 Ballou Fire Code Violation Improper lock throughout the building (thumb turn) | |||
| FM-200511883 05 11/14/05 Ballou Fire Code Violation B-Exit light missing (by room A44) | |||
| FM-200511844 05 11/14/05 Ballou Fire Code Violation First Floor-Exit light not illuminated near rm. 115 | |||
| FM-200511855 05 11/14/05 Ballou Fire Code Violation First Floor-Exit signs missing (hallway and stairwell by tech center) | |||
| FM-200505113 05 11/16/05 Ballou Rm. 309 & A31 Replace wire Mesh Glass | |||
| FM-200511853 05 11/28/05 Ballou Fire Code Violation First Floor-Exit light not illuminated near health room | |||
| FM-200511897 05 11/28/05 Ballou Fire Code Violation B-Missing exit light near armory | |||
| FM-200511852 05 11/28/05 Ballou Fire Code Violation First Floor-Exit light not illuminated in gym | |||
| FM-200513527 05 11/29/05 Ballou Basement/Technical Center Restore Electrical Service to Computers | |||
| FM-200333782 03 11/30/05 (Ballou) FIRE CODE VIOLATION: 1st Floor/Panel box by Room #117: Water leaking in-to electrical fixtures. |
© The Washington Post Company
