Closed Repair Requests: November 2006

See Also: All Closed Repair Requests at Ballou Senior High School

November 2006 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    6
    Average Time Elapsed: 238 Days
  • Total Requests
    6

Detailed Reports

Routine Repair Requests Completed in November 2006 (6)
Description Open Date Close Date Time Elapsed
FM-200630621 06 11/1/06 SERVICE:DEAD BOLT LOCK ON CORRIDOR DOORS,KEY DOES A 360 DENYING ACCESS. October 6, 2006 November 1, 2006 26 days
FM-200631688 1/06 11/7/06 Service:knob lock to principal suite unable to open November 1, 2006 November 7, 2006 6 days
FM-200621828 06 11/15/06 Ballou Auto Shop Repair or replace (2) two shaft bearing assembly on exhaust fan #1. April 26, 2006 November 15, 2006 203 days
FM-200620830 06 11/15/06 Ballou Auto Shop Replace (1) one Magnetic-starter on air handler unit #1 Note: This unit is located 15 ft. in the ceiling. (Air Quality) April 4, 2006 November 15, 2006 225 days
FM-200508722 05 11/20/06 Ballou Room #311,#307 and #308 Replace A/C window units in room #301, #307 and #308. Info: Emerson Quiet Kool Mod. #18GD44 BTU 18,000/17,500 Volt 230-208 Amps 7.9/8.5 July 26, 2005 November 20, 2006 482 days
FM-200508373 05 11/20/06 Ballou Cafeteria Furnish and installed (4) four A/C window units in cafeteria. Voltage range of 208V - 230V BTU's 24,000/23,500 For cooling of cafeteria July 22, 2005 November 20, 2006 486 days

© The Washington Post Company