Closed Repair Requests: December 2001

See Also: All Closed Repair Requests at Ballou Senior High School

December 2001 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 37 Days
  • Routine Requests
    2
    Average Time Elapsed: 158 Days
  • Total Requests
    3

Detailed Reports

Urgent Repair Requests Completed in December 2001 (1)
Description Open Date Close Date Time Elapsed
FM-200123654 /01 12/27/01 BALLOU **EMERGENCY** FIRST FLOOR, ROOM A120 WINDOW IS BROKEN IN CLASSROOM. COLD ARE IS GETTING IN. ASBESTOS CODE A-CLEAR FOR REPAIR 12/03/01 BY DCPS SAFETY : RONALD EDWARDS 202 439 8094 November 20, 2001 December 27, 2001 37 days

Routine Repair Requests Completed in December 2001 (2)
Description Open Date Close Date Time Elapsed
FM-200117605 01 12/4/01 BALLOU FOOTBALL STADIUM ASBESTOS ASSESSMENT REQUIRED INSTALL DOOR HARDWARE ON STORAGE ROOM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/01/01. HORNE ENGINEERING - ROGER KAGER (RG) August 16, 2001 December 4, 2001 110 days
FM-200110659 01 12/13/01 BALLOU ASBESTOS ASSESSMENT REQUIRED REPLACE (4) BADLY DAMAGED METAL DOORS LEADING INTO THE GIRLS LOCKER ROOM. DOOR SIZE 29 1/2 X 6 FT, 7 X 3/4 INS, 16 GA 4 EA. DOOR CLOSER 1604 - H 4 EA. (MT-20000482) & WO # FM-200108844 CODE A - ASBESTOS ABATED ON 10/29/01 (SG) PER LEROY MINTONS CONFIRMATION. May 21, 2001 December 13, 2001 206 days