Closed Repair Requests: February 2002

See Also: All Closed Repair Requests at Ballou Senior High School

February 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 2 Days
  • Routine Requests
    4
    Average Time Elapsed: 87.5 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in February 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200202283 02 2/7/02 (BALLOU) !!URGENT!! BASEMENT LEVEL: REPAIR OR REPLACE CYLINDER DEAD BOLT LOCK ON EXTERIOR ARMORY DOOR. February 5, 2002 February 7, 2002 2 days

Routine Repair Requests Completed in February 2002 (4)
Description Open Date Close Date Time Elapsed
FM-200121414 /01 2/4/02 (BALLOU) ASBESTOS ASSESSMENT REQ. R/R DOOR HINGES- WEIGHT O/DOOR LAST TOLLED AWAY FR. FRAME DO TO W/T. ASBESTOS CODE A-CLEAR FOR REPAIRS BY 10/17/01 HORNE ENGINEER : ROGER KAGER October 11, 2001 February 4, 2002 116 days
FM-200114948 01 2/12/02 (BALLOU) HEALTH CODE VIOLATION: CAFETERIA/KITCHEN: PROVIDE A MINIMUM OF 2 INCH AIR GAP BETWEEN FLOOR DRAINS AND PIPES LEADING TO ICE MACHINES. ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/27/01 BY HORNE ENGINEER: EDWARD RODRIGUEZ July 9, 2001 February 12, 2002 218 days
FM-200201485 02 2/14/02 (BALLOU) 1ST FLOOR/MAIN OFFICE: STUDENTS GAINED FULL KNOWLEDGE OF COMBINATION LOCK; ENTERED OFFICE STOLE MONEY ($400.00 & OTHER ITEMS). February 12, 2002 February 14, 2002 2 days
FM-200202958 02 2/27/02 BALLOU STAY SUD-BASEMENT OF A-WING 1) FURNISH (1) PIECE OF PLEXIGLASS TO COVER BULLETIN BOARD. BULLETIN BOARD ALREADY MOUNTED. February 13, 2002 February 27, 2002 14 days