Closed Repair Requests: February 2003

See Also: All Closed Repair Requests at Ballou Senior High School

February 2003 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    11
    Average Time Elapsed: 182.5 Days
  • Total Requests
    11

Detailed Reports

Routine Repair Requests Completed in February 2003 (11)
Description Open Date Close Date Time Elapsed
FM-200114424 01 2/10/03 BALLOU FIRST (1ST), SECOND (2ND) AND THIRD (3RD) FLOORS TSI, PLASTER-REMOVAL, FLOOR TILING AND REPAIR. 1) ASBESTOS ASSESSMENT REQUIRED. 2) ELECTRICAL CONTRACTOR WILL BE DRILLING 4" HOLES IN THE FLOORS NEXT TO THE STAIRWAY. THE FLOOR TILES MUST BE REMOVED BEFORE THIS WORK CAN BE DONE. PLEASE HAVE FLOOR TILES ABATED. RE-ASSIGNED TO HORNE ENG. ON 11/30/01 (SG). CAPE (IT GROUP)/703-461-6848 CODE A - ASBESTOS ABATED ON 02/14/02 PER RONALD EDWARDS CONFIRMATION.(RG 02/20/02) June 29, 2001 February 10, 2003 591 days
FM-200224679 03 2/11/03 (Ballou) 1st Floor water coolers: 1. Fountain near boys restroom - Replace push plate. 2. Water fountain outside maint. office - Re-anchor to wall, replace filter, and cooler. (Wall hung) 3. Water cooler near room #111 - replace. (No filter) 4. Water cooler near room #115 - re-anchor, (No filter) Replace Bubbler. 5, Water cooler near gym - replace 2nd cooler, remove stoppage, no filter, (Wall hung) 6. Water cooler near library - water line outside jacket replace. Asbestos Code A - Clear for repairs on 02/10/03. Horne Engineering - Bipin Nanavaty (RG 02/11/03) January 28, 2003 February 11, 2003 14 days
FM-200225511 03 2/11/03 Ballou Health Suite Replace wall multistage heat pump thermostat. Info: Honeywell Y594R1243; 24 V Control Heating and Cooling Sub base package T874R1152/Q674L1207 0.1A TO 1.2A. February 11, 2003 February 11, 2003 0 days
FM-200108406 01 2/11/03 BALLOU BOILER ROOM SUB-BASEMENT 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. CLEAVERY BROOKS PACKAGED BOILER #4. REFACTORY ENTIRE INTERIOR OF THE BOILER INCLUDING THE MORRISON TUBE AREA. BOILER INFO: MOD #760-125A SER#L47171 Tracking #10087 EEC (Envirobate)/301-436-1150 Code A - Asbestos abated on 06/07/02 PER Leroy Minton confirmation.(RG 06/18/02) April 13, 2001 February 11, 2003 669 days
FM-200224613 03 2/12/03 Ballou Health Suite No heat due to burnt up electric fuse holder. January 27, 2003 February 12, 2003 16 days
FM-200224743 03 2/12/03 (Ballou) 3rd Floor - water coolers: 1. Water cooler by 307 has improper anchor support for bracket. ( no filter) 2. Water cooler near 315 ( no filter) reanchor bracket. Asbestos Code A - Clear for repairs on 02/10/03. Horne Engineering - Bipin Nanavaty (RG 02/11/03) January 28, 2003 February 12, 2003 15 days
FM-200203048 02 2/12/03 (BALLOU) 1) FT/Mastic removal within AMP room 28. ASBESTOS ASSESSMENT REQ. BASEMENT/ A-6 NEED TO HAVE THE ELECTRICAL OUTLETS ON THE FLOOR REMOVED AND MOVED TO THE WALL. Envirobate - Charles Crenshaw - 571-436-1150 February 15, 2002 February 12, 2003 362 days
FM-200216979 02 2/14/03 Ballou F- 110.1(7) Fire Code Violation 1st Floor Auditorium Defective electrical wiring. September 9, 2002 February 14, 2003 158 days
FM-200224740 03 2/14/03 (Ballou) 2nd Floor - water coolers: 1. Water cooler near elevator reanchor to wall ( no filter). 2. Water cooler near 209 ( no filter) reanchor bracket. 3 Water cooler near 215 ( no filter) reanchor bracket. Asbestos Code A - Clear for repairs on 02/10/03. Horne Engineering - Bipin Nanavaty (RG 02/11/03) January 28, 2003 February 14, 2003 17 days
FM-200216982 02 2/14/03 Ballou F- 608.1 Fire Code Violation 1st Floor Auditorium Exit doors in rear of auditorium need adjustment. September 9, 2002 February 14, 2003 158 days
FM-200225558 03 2/18/03 Ballou Boiler Room P.M Chiller February 11, 2003 February 18, 2003 7 days